The Perpich Arts Integration Network of Teachers (PAINT) fosters collaborative arts integration in Minnesota through K-12 teacher professional development and funding to schools. With Perpich Center facilitation, teacher teams develop and implement arts-integrated lessons and units. PAINT program components include:
To acquire professional services for an assessment of structural condition preparatory for preservation and reuse of the drive tunnel infrastructure of the Pillsbury A Mill, a National Historic Landmark
To complete restoration of the historic steel fence enclosing the Minneapolis Pioneers and Soldiers Memorial Cemetery, listed in the National Register of Historic Places
This project will complete a Watershed Restoration and Protection (WRAP) Plan that includes a set of pollutant reduction and watershed management strategies to achieve water quality standards for the listed pollutants, and that are understood and adoptable by local units of government and other stakeholders. This project will also provide an important water quality framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.
To prepare a nomination to the National Register of Historic Places for Bridge No. 3145 Long Meadow Lake Bridge (Old Cedar Ave. Bridge), Bloomington, MN.
Funding was used to design, install and evaluate deterrent barrier options in Minnesota and to cost share a barrier in northwest Iowa to limit or slow the movement of Invasive carp.
The Bluff Creek Watershed TMDL Implementation Plan evaluated the stream power index for each of the gullies identified in the 1996 Management Plan. Based upon this terrain analysis, sediment loading rates from the 1999 to 2008 P8 modeling results, and modeled surface runoff, known erosion sites were prioritized. This site, which is tributary to Bluff Creek and the Minnesota River, was given the highest priority ranking.
The goal of this project is to implement 10-15 medium sized projects that will infiltrate and reduce pollutant loads to the waters in the Riley-Purgatory-Creek Watershed District. The District intends to achieve this by using their Citizen Advisors who are well involved with local associations, City staff who are familiar with associations in their jurisdiction and also seek less-known association through various advertising methods. We intend to use staff knowledge to insure that the projects are suitable for the site and implemented correctly to maximize efficiency.