Reconstruction planning-Historic Peterson North Barn
Two storms in July/August of 2010 caused the east wall and gable ends of the historic Peterson North Barn to collapse. The barn was stabilized in October of 2010. The owner and the Friends of the Peterson Barn were advised to quicky develop a phased plan for reconstruction to prevent further damage. A qualified historical architect was hired to undertake the planning and design work with the ultimate goal of restoring the building to it's original appearance. Measurements of the existing structure, taken in summer 2010, were used to create a draftsman copy of the barn using a computer software program. The drafts were used for the final report.
(b) Statewide Historic and Cultural Grants. (i) $2,250,000 in 2010 and $4,500,000 in 2011 are appropriated for history programs and projects operated or conducted by or through local, county, regional or other historical or cultural organizations; or for activities to preserve significant historic and cultural resources. Funds are to be distributed through a competitive grants process. The Minnesota Historical Society shall administer these funds using established grants mechanisms, and with assistance from the advisory committee created herein.