Develop second swimming quarry to relieve pressure on existing swimming quarry. Construct T-dock access platform, a cantilevered access platform, informational and safety signage, restroom, picnic shelter and landscaping.
Acquire approximately 39.5 acres adjacent to the existing 643-acre Quarry Park and Nature Preserve and the DNR's 300-acre Quarry Park SNA. This key acquisition will open up a southern entrance serving the rapidly expanding St. Cloud metro area.
US Geological Survey (USGS) will perform real-time water quality monitoring at its stations located in Fargo and Grand Forks. The Minnesota Pollution Control Agency co-sponsors this work along with USGS, North Dakota Dept. of Health, the cities of Fargo, Moorhead, Grand Forks, and East Grand Forks.
This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report.
The objectives of this project are to collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States Geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North. Data will be published on the USGS Nation Water Information System (NWIS) website and in the USGS Annual Report.
Agency staff and local partners will gain an improved understanding of the nature of the chemical and physical attributes of the Red River of the North.
We will characterize environmental drivers contributing to the decline of wild rice using lake sediment cores to reconstruct historical wild rice abundance in relation to lake and watershed stressors.
This is a multi-governmental project funded by the Minnesota Pollution Control Agency, the United States Geological Survey, North Dakota Department of Health, the Cities of Fargo, Moorhead, Grand Forks, and East Grand Forks to monitor river flow and condition parameters to gain an improved understanding of the nature of the chemical and physical attributes of the Red River of the North.
This project will provide land and water managers in the Red River Basin with data and online tools to prioritize actions on the landscape that achieve water quality objectives identified in local and state plans. This will help identify strategically important locations for implementing erosion control and water management practices. Standardized watershed-based data products will be integrated into a web-based planning tool which will be added to the Red River Basin Decision Information Network (RRBDIN) being developed as part of the Red River Watershed Feasibility Study.
The Clay SWCD will partner with the Buffalo-Red River Watershed District (BRRWD) and landowners to stabilize gullies to the Red River. The first priority will be to address ongoing erosion in Snakey Creek. Snakey Creek is the outlet of County Ditch No. 41 which has become the most critically eroding gully contributing sediment to the Red River in our targeted reach. When stabilized, sediment load to the river will be reduced by 1404 tons per year, and Total Phosphorus will be reduced by 1615 pounds per year.