The Board of Water and Soil Resources is required to contract with the Conservation Corps of Minnesota and Iowa (formerly Minnesota Conservation Corps), or CCMI, for installation of conservation practices benefitting water quality for at least $500,000 in each year of the 2010-11 biennium. The Board approved reserving the following funds in each year of the biennium to comply with this appropriation:$200,000 from the Runoff Reduction Grants, $200,000 from the Clean Water Assistance Grants, $100,000 from the Shoreland Improvement Grants.
$4,150,000 the first year and $3,900,000 the second year are to the Minnesota Public Television Association for production and acquisition grants according to Minnesota Statutes, section 129D.18. Of this amount, $650,000 the first year is for a grant to Twin Cities Public Television to produce the Vietnam: Minnesota Remembers project. Any production costs associated with this project incurred on or after February 1, 2017, are eligible for reimbursement under this section as long as these funds are available under subdivision 2.
$1,350,000 the first year and $1,350,000 the second year are for a grant to the Como Park Zoo and Conservatory for program development that features education programs and habitat enhancement, special exhibits, music appreciation programs, and historical garden access and preservation.
$25,000 each year is for a grant to Midwest Outdoors Unlimited to preserve Minnesota's outdoor history, culture, and heritage by connecting individuals and youth with disabilities to natural resources.
Wilderness Inquiry will connect more than 7,500 youth to their local lands and waterways through place-based education and hands-on outdoor experiences. These experiences will focus on the cultural history of the area to connect students to Minnesota's rich outdoor heritage. Of the 7,500 youth, more than 800 will take part in overnight and multi-day camping, training, and service learning trips throughout the state of Minnesota to deepen their connection to place and stewardship ethic.
This project will decrease peak flows and associated water quality issues such as sediment and phosphorus on County Ditch 68, Mud Lake, and Fountain Lake. Practices include a 40-acre storage and treatment wetland, two cropped and altered wetland restorations of an acre each, converting 32 acres of cropland to perennial cover, and two grade stabilization structures.
The Mallery Jerseys dairy farm is critically located along the bluff of the St. Croix River escarpment and drains directly to the St. Croix River. In 2018, a Comprehensive Nutrient Management Plan was completed and identified a number of additional practices that should be implemented to improve the water quality of the St. Croix River. The proposed practices will reduce the phosphorus and nitrogen by 76 pounds (83%)and 265 pounds (85%) respectively.
The goal of this project is to achieve a 10% reduction in overall sediment discharge to the Mississippi River from the Northeast St. Cloud Drainage Area by installing one regional underground stormwater detention and treatment facility in partnership with a Neighborhood Redevelopment Project. The project will have over 16,000 cubic feet of water storage capacity treating 35 acres of stormwater runoff and is modeled to reduce sediment by 4.5 tons, which is 10% of the sediment reduction goal for this drainage area.
A large, actively eroding gully has existed on the campus of Parmly, a senior living complex in Chisago City, for at least 50 years. The gully is on the banks of Green Lake, which is at high risk for becoming impaired in the near future. The Parmly gully project is identified as a source of untreated stormwater and phosphorus loading in the Chisago City urban subwatershed retrofit analysis report. Stabilization of the gully will provide a 20% reduction in phosphorus loading to Green Lake. The staff of Parmly is in full support of the project and a design is complete.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas: Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
The St. Croix River escarpment has been a focal point for the Chisago Soil and Water Conservation District over the past 8 years, and continues to be one of the leading areas of Chisago County in terms of phosphorus reduction projects to Lake St. Croix. Of the original inventory, 16 of the 36 gullies have been stabilized. This application includes the stabilization of 5 gullies. These projects will reduce the phosphorus loading to the St. Croix River by at least 50 pounds per year and sediment loading by at least 50 tons per year.
Ramsey County SWCD is applying to continue the implementation of its popular and successful well sealing cost-share program to help protect the groundwater, especially in highly vulnerable drinking water supply management areas, by permanently and professionally sealing between 115 and 140 abandoned wells in the county.
Eight towns in Martin County recently updated their wellhead protection plans. One of the main protection plan items is to seal abandoned wells within the towns' Drinking Water Source Management Areas. This project will provide 50% cost share, up to $1,000, to help offset the cost of sealing abandoned wells.
This project will provide public outreach and engagement throughout Anoka County through a newly formed county-wide partner collaboration of Anoka County Watersheds, Cities and the Soil and Water Conservation District. The ultimate goal of this project is to enlist the active support of target audiences to achieve water management goals. This project is funded through the Anoka County allocation of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
This project will stabilize eroding riverbanks on the Mississippi River through a partnership of the City of Anoka and the Anoka Conservation District. The project will result in the reduction of total suspended solids by at least 5 tons per year and phosphorus by 8 pounds per year to the Mississippi River. This project is funded through the Anoka County allocation of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
The project will improve the water quality of Bassett Creek by addressing a significant flooding issue and will restore 1.7 acres of wetland and 1 acre of upland habitat. The project will create a sediment forebay, remove accumulated sediment, and expand the footprint of existing stormwater ponds in the City of Golden Valley. The result will be approximately 22 acre-feet of additional flood storage and the removal of an estimated 9 pounds of phosphorus per year.
This project will improve the water quality of the Mississippi River through stormwater treatment and flood control activities. The Capitol Region Watershed District and the City of Lauderdale will expand the storage area of a regional stormwater pond and and improve the pond treatment capacity by installation of an iron-enhanced sand filter along the pond edge. This project is funded through the Ramsey County allocation of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
This project will improve water quality in Bavaria, Grace, Jonathan, Waconia and Hazeltine Lakes and West Chaska Creek in Carver County. Sediment and phosphorus loading to these waterbodies will be accomplished by: 1) retrofitting stormwater pipes with water quality treatment devices, 2) modifying stormwater ponds and installing iron-enhanced sand filters, and 3) stream restoration efforts to re-meander approximately 1,100 linear feet of a ditched segment of West Chaska Creek.
This project will improve water quality to Coon and Pleasure Creeks through the installation of stormwater pond filter bench retrofits in the cities of Blaine and Coon Rapids. Filter bench media will consist of iron-enhanced sand and biochar media to maximize reduction of dissolved and bacterial pollutants. Public events will also be held to engage stakeholders during the project. This project is funded through the Anoka County allocation of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
This project will design and install targeted practices to reduce the volume, sediment and phosphorus from urban stormwater runoff directly discharging into Perro Creek and Lily Lake. This project is funded through the Washington County allocation of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
This project will improve the water quality of lakes in Ramsey and Washington Counties. This will be accomplished by: 1) installation of filtration basins adjacent to Wakefield Lake to reduce nutrient and sediment pollution, and 2) construction of raingardens on private property that filter stormwater runoff thereby reducing sediment and nutrient pollution to Battle Creek Lake and Kohlman Creek. This project is funded through the Ramsey County and Washington County allocations of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
This project will improve the water quality to Upper Twin Lake and the Mississippi River. This will be accomplished through cost share programs administered through the Shingle Creek Watershed Management Commission (WMC) and West Mississippi WMC that will provide matching funds to member cities to undertake small pollutant load and runoff volume reduction projects typically costing less than $100,000. This project will install bioretention basins which will reduce nutrients to Upper Twin Lake and bacteria loads to the Mississippi River.
This multifaceted project will provide education and install practices to improve water quality in the Sunrise River Watershed. This will be accomplished by: 1) retrofitting stormwater basins and treating stormwater through swales and/or rain gardens to reduce nutrients and sediment to Coon and Martin Lakes, 2) surveying carp populations and developing a Linwood Lake carp feasibility study and management plan, and 3) increasing lakeshore stewardship projects on Typo, Coon, Fawn, Pet, Linwood, Island Lakes through environmental education about water quality.
This project will conduct a subwatershed feasibility study to identify and prioritize project locations for retrofit of stormwater best management practices. The project will also include installation of the highest priority stormwater improvement practice to reduce nutrient pollution to Goose Lake. This project is funded through the Anoka County and Ramsey County allocations of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
This project will improve the water quality of Keller Lake in the City of Apple Valley by expanding an existing upstream pond and modifying the pond's outlet to provide additional water quality treatment. The pond outlet would be modified to provide extended detention and increase the residence time for smaller storm events. One public outreach event will be held during project design to inform residents of the proposed project and obtain feedback.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas - Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.