2019 Parmly Gully Stabilization Project on Green Lake

Project Details by Fiscal Year
2019 Fiscal Year Funding Amount
$100,000
Fund Source
Clean Water Fund
Recipient
Chisago SWCD
Recipient Type
Local/Regional Government
Status
In Progress
Start Date
January 2019
Activity Type
Grants/Contracts
Counties Affected
Chisago
Legal Citation / Subdivision
Laws of Minnesota 2017, Chapter 91, Article 2, Section 7(b)
Appropriation Language

for grants to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of these funds may be used to seek administrative efficiencies through shared resources by multiple local governmental units.

2019 Fiscal Year Funding Amount
$100,000
Other Funds Leveraged
$0
Direct expenses
$0
Administration costs
$0
Proposed Measurable Outcome(s)

The BWSR Pollution Reduction Calculator estimates that 112 pounds of phosphorus and 112 tons of sediment will
be prevented from entering Green Lake annually.

Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Chisago SWCD are: Craig Mold, David Tollberg, James Birkholz, Justin Wilson, Roland Cleveland
Project Overview

A large, actively eroding gully has existed on the campus of Parmly, a senior living complex in Chisago City, for at least 50 years. The gully is on the banks of Green Lake, which is at high risk for becoming impaired in the near future. The Parmly gully project is identified as a source of untreated stormwater and phosphorus loading in the Chisago City urban subwatershed retrofit analysis report. Stabilization of the gully will provide a 20% reduction in phosphorus loading to Green Lake. The staff of Parmly is in full support of the project and a design is complete.

Project Details

Projects and Practices 2019

Project Manager
First Name
Craig
Last Name
Mell
Organization Name
Chisago SWCD
Street Address
38814 Third Ave
City
North Branch
State
MN
Zip Code
55056
Phone
651-674-2333
Email
craig.mell@mn.nacdnet.net
Competitive Grant Making Body
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Nicole Clapp