2019 - Watershed Based Funding Metro (Vermillion River Watershed JPO)

Project Details by Fiscal Year
2019 Fiscal Year Funding Amount
$436,180
Fund Source
Clean Water Fund
Recipient
Vermillion River Watershed JPO
Recipient Type
Local/Regional Government
Status
Completed
Start Date
September 2018
End Date
December 2021
Activity Type
Grants/Contracts
Counties Affected
Dakota
Dakota
Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
Watershed Based Funding Metro 2019 - Laws of Minnesota 2017, Chapter 91, Article 2, Section 7(m) (BWSR Soil Erosion and Tillage Transect)
Appropriation Language

Watershed Based Funding Metro 2019 - (a) $4,875,000 the first year and $4,875,000 the second year are for a pilot program to provide performance-based grants to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan or metropolitan surface water management frameworks or groundwater plans. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph.

2019 Fiscal Year Funding Amount
$436,180
Other Funds Leveraged
$775,187
Direct expenses
$408,136
Administration costs
$10,000
Number of full time equivalents funded
0.13
Proposed Measurable Outcome(s)

This purpose of this funding is to implement several projects within the Vermillion Watershed. This includes replacing two imminent health threat septic systems, retrofitting a stormwater pond to reduce phosphorus entering Farquar Lake, installing grade control structures to reduce sediment entering Etter Creek, and installing both urban and agricultural practices estimated to reduce nutrients and sediment entering the Vermillion River. Overall, approximately 60 pounds of phosphorus and 150 tons of sediment are to be reduced in the watershed.

Measurable Outcome(s)

This project has resulted in an estimated annual reduction of 110 pounds of Nitrogen, 107 pounds of Phosphorus, 111 tons of Sediment, and 12 acre-feet of Volume Reduced.

Proposed Outcomes Achieved
Achieved proposed outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Vermillion River Watershed JPO are: Mary Liz Holberg, Mike Slavik, Tom Wolf
Project Manager
First Name
Travis
Last Name
Thiel
Organization Name
Vermillion River Watershed JPO
Street Address
4100 220th St. W
City
Farmington
State
MN
Zip Code
55024
Phone
952-891-7000
Email
travis.thiel@co.dakota.mn.us
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767