2019 - Watershed Based Funding Metro (Middle St. Croix River WMO)

Project Details by Fiscal Year
2019 Fiscal Year Funding Amount
$78,760
Fund Source
Clean Water Fund
Recipient
Middle St. Croix River WMO
Recipient Type
Local/Regional Government
Status
Completed
Start Date
September 2018
End Date
December 2021
Activity Type
Grants/Contracts
Counties Affected
Washington
Washington
Project Overview

This project will design and install targeted practices to reduce the volume, sediment and phosphorus from urban stormwater runoff directly discharging into Perro Creek and Lily Lake. This project is funded through the Washington County allocation of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
Watershed Based Funding Metro 2019 - Laws of Minnesota 2017, Chapter 91, Article 2, Section 7(m) (BWSR Soil Erosion and Tillage Transect)
Appropriation Language

Watershed Based Funding Metro 2019 - (a) $4,875,000 the first year and $4,875,000 the second year are for a pilot program to provide performance-based grants to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan or metropolitan surface water management frameworks or groundwater plans. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph.

2019 Fiscal Year Funding Amount
$78,760
Other Funds Leveraged
$42,472
Direct expenses
$78,760
Administration costs
$3,155
Number of full time equivalents funded
0.29
Proposed Measurable Outcome(s)

This project will reduce phosphorus by at least 2 pounds per year and total suspended solids by 600 pounds per year to Perro Creek. In addition, this project will reduce phosphorus by at least 1.2 pounds and total suspended solids by 500 pounds per year to Lily Lake.

Measurable Outcome(s)

This project has resulted in an estimated annual reduction of 16 pounds of Phosphorus, 4 tons of Sediment, and 3 acre-feet of Volume Reduced.

Proposed Outcomes Achieved
Achieved proposed outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Middle St. Croix River WMO are: Beth Olfelt-Nelson, Brian Zeller, Dan Kyllo, Joe Paiement, John Dahl, John Fellegy, Mike Runk, Ryan Collins, Tom McCarthy
Project Manager
First Name
Matthew
Last Name
Downing
Organization Name
Middle St. Croix River WMO
Street Address
455 Hayward Ave
City
Oakdale
State
MN
Zip Code
55128
Phone
651-330-8220 x 22
Email
mdowning@mnwcd.org
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767