This project goal is to conduct water chemistry monitoring at seventeen stream locations, to record and submit all data collected through this process, and to provide the information necessary for the calculation of water quality pollutant loads using the FLUX32 program.
The Pomme de Terre River Association has targeted and identified specific areas and activities required for marked water quality improvement. This project will implement of 16 Water and Sediment Control Basins (WASCOBs), 28 Rain Gardens, 2 Shoreline/ Stream bank stabilization, 10 Waste Pit Closures, 1 Terrace Project, and the enrollment of 1900 acres into conservation practices. These practices in total will directly result in site-specific and watershed-dependent reductions of 17,801 tons of sediment and 17,784 pounds of phosphorous from entering surface waters yearly in the watershed.
The Lower Shakopee Creek has proportionally higher pollutant contributions than any other tributary in the Chippewa River Watershed, and lower than average implementation of conservation practices. Establishing relationships with agricultural landowners is critical for overcoming barriers to participation. In order to make measurable pollutant reductions, Chippewa River Watershed Project staff will increase one-to-one landowner contacts, program promotion, and Best Management Practice site identification.
Reinvest In Minnesota (RIM) and Native Prairie Bank (NPB) coordinated to accelerate grassland protection efforts. Through this appropriation a total of 1,584 acres were protected. This included 604 RIM acres and 980 NPB acres. Easement acquisition focused on Minnesota Prairie Conservation Plan identified landscapes.