Scientific and Natural Area (SNA) habitat restoration and improvements (1000+ acres), increased public involvement, and strategic acquisition (700+ acres) will conserve Minnesota's most unique and rare resources for everyone's benefit.
Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health with the assistance of the Board of Water and Soil Resources protects both public health and groundwater by assuring the proper sealing of unused wells.” Clean Water funds are being provided to home owners as a 50% cost-share assistance for sealing unused private drinking water wells.
The Septic Risk Assessment Model and Program Enhancement (SRAMPE) will result in a systematically review and catalog of all septic related materials by licensed SSTS professionals pertaining to the 890 properties in which we believe are served by SSTS. The enhanced program will improve efficiency, customer service, and administrative procedure. Above all, it will lead to upgrading of failing SSTS or conversion to City sewer
Ducks Unlimited's Phase 5 land program will acquire and restore 600 acres of prairie land and wetlands for inclusion in state Wildlife Management Areas for Minnesota DNR, with focus on restorable prairie lands and wetlands, and land buffering shallow lakes.
Funding through this appropriation enhanced 4,745 acres of wetland habitat. Four wetland/shallow lake infrastructure projects were competed that enhanced 1,020 acres and and another project restored 50 acres. Wetland management actions (wild rice seeding, a significant drawdown, and a major large prescribed burn) enhanced 1,997 acres. Work by the Region 3 Roving Habitat Crew enhanced 1,678 wetland acres through work on prescribed burns, drawdowns, herbicide applications, and removal of woody vegetation.
Ducks Unlimited spent 98% of this ML2018 OHF appropriation and completed the fee-title purchase of four land parcels totaling 607 acres for MNDNR, exceeding our 550-acre grant goals as follows: 233-acre Steinke Tract on the north side of 5,000-acre Marsh Lake on Lac Qui Parle WMA in Big Stone County; 64-acre Erickson Tract on Whitefield WMA in Kandiyohi County; 151-acre Kramer/Tenhassen Farms Tract on Seymour Lake WMA in Martin County; and 159-acre Stoderl Tract to create the new Stoderl Slough WMA in Murray County.
To contract with qualified professionals to prepare planning documents that will help preserve the Shaw Memorial Library, listed in the National Register of Historic Places, and used by Carlton County Historical Society.
The Phase VII Habitat Restoration Program included an Orr Wetland Restoration, a Belshan Property Targeted Habitat Acquisition Project, and a Shell Rock River Streambank Restoration Project. As a result, 152 acres of habitat and wetlands were protected, enhanced or restored.
This project will complete an extension of the Shell Rock River Hydrologic Simulation Program FORTRAN (HSPF) watershed model application through the year 2018. Compliance scenarios will be executed to address potential expansion of discharges from the Albert Lea Wastewater Treatment Plant (WWTP).
This project is for surface water assessment in the Shell Rock and Winnebago River Watershed including four stream sites and two lake sites. Waters of concern include Lime creek, Bancroft creek, Goose creek, a tributary to Fountain Lake, Albert Lea Lake and State Line Lake. The outcomes includes establishing baseline data for the associated sample site.
The Shell Rock River Watershed District's Phase 5 Habitat Restoration Program will restore, enhance, and protect 1040 acres of essential shallow lake, wetland and stream bank habitat benefiting fish, waterfowl and wildlife populations, preserving an outdoor legacy for future generations.
This project will conduct the second round of Intensive Watershed Monitoring (IWM) for the Mississippi River St. Cloud watershed. Partnering organizations intend to complete sampling of lakes and streams following the protocols and guidance set forth by the Minnesota Pollution Control Agency (MPCA). Watershed partners include Benton Soil and Water Conservation District (SWCD), Clearwater Watershed District, Sherburne SWCD, Stearns SWCD, Stearns County staff, and Wright SWCD.
The goal of the project is the reduction of nitrates in the groundwater by promoting and implementing best management practices and alternative management tools in the priority areas of Sherburne County. Practices included in the application are: Cover crops, irrigation water management , and nutrient management. Additional incentives included are for the Conservation Reserve Program. District Staff will also plant at least one acre of demonstration plots which will be highlighted at an annual field day.
Forest Lake is one of the top recreational lakes in the metro area and protecting its water quality is a top priority for the Comfort Lake Forest Lake Watershed District. While not currently on the impaired waters list, the water quality of Forest Lake is very near the water quality standard. Shields Lake has been identified as the single largest pollutant contributor to Forest Lake. This project proposes to impound water from a tributary to Shields Lake for golf course irrigation reuse, reducing watershed phosphorus loads to Shields Lake.
develop Park ID entrance signs at Regional Parks and Trails consisting of Design/Engineering, and phased construction of Park ID signs consisting of demolition, grading, landscaping, utilities, lighting, sidewalk, bituminous paving, curb and gutter, fencing, site equipment, amenities, and signs.
The Six Lakes subwatershed analysis will utilize previously completed watershed modeling to conduct subwatershed analyses for six high priority lakes that are closest to meeting state water quality standards or require protection due to high public use and declining water quality trends. This project will develop a long list of cost benefit ranked water quality best management practices based on concept design.
The project is part of the Six Mile-Halsted Bay Subwatershed Plan, a planning partnership currently underway which aims to protect and improve natural resources within this priority subwatershed by working closely with partnering agencies to integrate capital investments and maximize public return on investment. This project will enhance two existing stormwater ponds to enhance treatment of phosphorus as well as incorporate treatment of the Church Lake outlet, a lake which routinely fails to meet state water quality standards and contributes to the water quality impairment of East Auburn.