Water control structures and dikes were designed and constructed on six Wildlife Management Areas (WMA) in the counties of Becker, Clearwater, Itasca, Lincoln, Roseau, and Yellow Medicine. Dike work at Roseau River WMA protects and enhances 3200 acres of wetlands wetlands in Pool 2 of the WMA. Roseau River WMA has 10 large water control structures, seven moist soil cells, and four large pools covering 11,800 acres. Cells for a moist soil unit were constructed at Lac Qui Parle WMA in Lac Qui Parle County.
Clearwater County's lakes provide significant environmental, economic and recreational benefits . This project will assist local water management planning efforts by collecting and analyzing available lake water quality information and watershed characteristics for Bagley, Long Lake and Long Lost Lakes. Bringing the available water quality information that has been gathered and presenting it in a manner that is understandable to lake residents and other citizens is the goal of the project.
To provide children's programming at the Red Lake County Fair. Programming will include games and activities highlighting local history, cultural heritage of the region, and learning and singing songs.
This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.
This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).
This project covers activities necessary to complete the major watershed restoration and projection project. The major objectives this project covers include contract administration, watershed coordination, stressor ID activities, identifying priority management zones, engage watershed citizens, and the creation of watershed restoration and protection plans.
This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.
Installation of erosion control structures to eliminate or reduce the effects of gullies is a high priority due to the large amount of sediment they have contributed to the Red Lake River. The high sediment loading is affecting water quality, aquatic life, downstream water supply sources and recreational use of the Red Lake River.
BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.
Per Minnesota Laws, 2011, 1st Special Session, Chapter 6, Article 4, Section 2, Subd. 6, "These amounts are appropriated to the commissioner of administration for grants to the named organizations for the purposes specified in this subdivision.