The goal of this project is to complete a two-year data set for physical, bacterial, and water chemistry sampling for the Intensive Watershed Monitoring Plan to aid MPCA’s assessment of the aquatic health of the Mississippi Headwaters(HUC 07010101) Watershed.
This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.
The MPCA has identified 13 stream sites in the watershed to characterize watershed water quality. This project will supplement and complement the identification of the top 50 sites in the watershed that are contributing to water impairment and also help in identification of priority watersheds in the re-write of the watershed comprehensive plan. Water samples and field measurements will be collected at each monitoring location ranging from baseline events to high flow events.
This project will obtain spatial and long-term pollutant load information from the Root River watershed in Southeast Minnesota. To accomplish this, the Fillmore Soil and Water Conservation District (SWCD) will assist the MPCA with water quality monitoring and annual pollutant loading calculations. Approximately 25 grab samples will be collected/site/year at 5 sites within the Root River watershed (totaling 125 grab samples/year). Annual load calculations for each site will be determined using the FLUX32 model.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
The City of Myrtle is an unsewered community in Freeborn County. Thirty-one of thirty-two properties are connected to a community straight pipe, which discharges raw sewage into Deer Creek, a tributary of the Cedar River and are classified as an imminent threat to public health (ITPHS). This project will provide cost-share assistance to 28 low income property owners, who are connected to the City of Myrtle community straight pipe, for construction of individual subsurface sewage treatment systems.
This project will fully fund three Nonpoint Engineering Assistance (NPEA) Joint Powers Board positions in cooperation with the NPEA Base Funding anticipated at $130,000 per year. This will allow a 2nd Professional Engineer to be retained in addition to a Lead Engineer and Technician. This 'accelerated' engineering previously was funded with BWSR Challenge Grants, and an EPA319 grant with corresponding BWSR CWF Matching Grant to handle the high workload associated with the large number of BWSR feedlot cost-share projects approved in South East Minnesota.
This project will extend two Feedlot Technical positions initially created and funded by a FY2011 CWF Feedlot Water Quality Grant that assess and help fix animal waste runoff from small feedlots. The technicians will work with and under the Technical Authority and priorities of the South East Soil and Water Conservation District Tech Support JPB lead Engineer. This project will enable more projects to be constructed resulting in a reduction of nitrogen, phosphorus and fecal coliform runoff into surface and ground water in South East Minnesota and the Mississippi River.
This project will accelerate production of County Geologic Atlases (part A). An atlas is a set of geologic maps and associated databases for a county that facilitate informed management of natural resources, especially water and minerals.
The table below provides a short summary of the acres and sites accomplished. We enhanced or restored 59,495 acres in 458 separate habitat projects.Project Type # Sites # AcresFencing for conserv grazing 6 721grassland conversion 33 1,124Invasive Species Control 43 1,599mowing 3 104Prescribed burn 214 48,368Restoration 13 123Woody Removal 146 7,457
This program accelerated the permanent protection of 1,001 acres of wetlands (185 acres) and grasslands (816 acres) as Waterfowl Production Areas open to public hunting in Minnesota. Over the course of the appropriation, PF acquired 5 parcels for a total of 1,001 acres which exceeded our total acre goal of 935 acres by 66 acres. Breaking down acres by ecological section we exceeded our acre goal in the prairie area by 346 acres. We are also happy to bring in $3,794,200 of non-state match dollars to this effort, exceeding our match goal of $3,320,000 by $474,200. We h
This proposal impacts shallow lakes and wetlands in Minnesota through the design and construction of projects, enhancement work done by DNR roving habitat crews, and shallow lakes work identified and initiated through the DNR Shallow Lakes program. Ten thousand acres of wetlands were enhanced by these activities.
Reinvest In Minnesota (RIM) and Native Prairie Bank (NPB) coordinated to accelerate grassland protection efforts. Through this appropriation a total of 1,584 acres were protected. This included 604 RIM acres and 980 NPB acres. Easement acquisition focused on Minnesota Prairie Conservation Plan identified landscapes.
The Albert Lea Lake Management project replaced the previous Albert Lea Lake fix-crest dam with a 3-in-1 structure that included a rock riffle dam, a lake level management structure, and an electric fish barrier. The benefits from this project include improved aquatic and waterfowl habitat, invasive species management, and improved desirable fish populations.