Del Clark Lake is a regionally unique resource in the Lac qui Parle Watershed. This grant contains both restoration and protection strategies aiming to maintain the quality of this rare and valuable resource in addition to restoring the recently impaired Canby Creek, which feeds into Del Clark Lake. Three grade control structures will be implemented just upstream of Del Clark to protect against sediment and aid in regulating flows. An estimate 240 pounds of phosphorous and 2,700 tons of sediment will be reduced annually.
This project strives to continue progress towards the sediment and nutrient reduction goals for the Buffalo River. Specific targeted practices and quantities include Water and Sediment Control Basins (110), Grade Stabilizations (7), Grassed Waterways (10), Critical Area Plantings (12), Filter Strips (45 ac.), Cover Crops (2,500 ac/year), Rotational Grazing/Use Exclusion (320 ac), Wetland Restoration (86 ac).
To hire a qualified architect to conduct a condition assessment of the C. E. Williams House, Mora, MN, listed in the National Register of Historic Places.
The proposed project will be in conjunction with an improvement project to the 103E County Ditch 63 Lateral N (CD 63) system. The project will accomplish the construction of five water and sediment control basins (WASCOB) and five alternate intakes to replace open intakes within the CD63 system, which is the headwaters of Beaver Creek East Fork. The construction and installation of the conservation practices will achieve a reduction of sediment, provide temporary water storage, and reduce peak flows that allow sediment and phosphorus to directly enter impaired Beaver Creek East Fork.
The Minnesota Land Trust proposes to permanently protect 312 acres of high quality habitat in southwest Minnesota by securing conservation easements within scientifically prioritized habitat complexes by filling key unmet gaps in the available land protection toolbox. Working with willing landowners the Land Trust will use its innovative bid model to maximize conservation benefit and financial leverage in project selection.
The Minnesota Land Trust proposes to permanently protect 506 acres of high quality habitat in southwest Minnesota by securing conservation easements within scientifically prioritized habitat complexes by filling key unmet gaps in the available land protection toolbox. Working with willing landowners the Land Trust will use its innovative bid model to maximize conservation benefit and financial leverage in project selection.
Over a century ago, the construction of Judicial Ditch No. 3 resulted in the rerouting of the South Branch of the Buffalo River, completely changing its flow characteristics. In the first phase of this multi-phase project, the Buffalo-Red River Watershed District (BRRWD) in partnership with landowners, federal, state, and local agencies, will put much of the rerouted channel back restoring up to 4.6 miles of the South Branch with up to 100 acres of associated riparian habitat corridor.
A century of channel straightening efforts has significantly reduced the habitat quality within the BRRWD. The BRRWD has identified, with preliminary designs completed, a number of straightened streams. In the second phase of this multi-phase project, the BRRWD in partnership with landowners, federal, state, and local agencies, will restore 7 miles of the Upper Buffalo River channel and riparian habitat corridor, and 4.2 miles of the South Branch Buffalo River channel and riparian habitat corridor.
Minnesota Trout Unlimited will enhance and restore degraded habitat for fish and diverse wildlife in and along priority trout streams located on existing public lands and conservation easements in the Metro area and southeast Minnesota. Increasing threats to these highly prized, yet relatively scarce, resources require accelerating habitat work to reduce the backlog of degraded stream reaches and buffer streams from the increased frequency and intensity of large rainfall and flood events.
Minnesota Trout Unlimited will enhance and restore degraded habitat for fish and wildlife along coldwater streams with existing protections. We will utilize a crew of young people from diverse backgrounds to enhance habitat along Twin Cities area trout streams. Increasing threats to North Shore streams require accelerating work improving riparian forest habitat to improve stream flows and lower water temperatures, and buffering streams from larger, more frequent rainfall and flooding.
The Upper Mississippi River region provides critical forest habitat for hundreds of species of birds from waterfowl and other game birds to warblers and birds of prey. This proposal builds on four previous projects and will expand Audubon's forest conservation work on State and Federal Lands as well as projects on permanently protected private lands. Increased flooding and invasive species are limiting natural tree regeneration and threatening floodplain forests.
The Bois De Sioux Watershed District (BdSWD) is partnering with the Wilkin County Soil and Water Conservation District (SWCD), Wilkin County, and landowners to reduce sediment load by 450 tons/year and phosphorus load by 90 lbs/yr to the Bois de Sioux River. This project is estimated to meet 10% of the Bois de Sioux-Mustinka short-term reduction goals for sediment and 28% of the short-term goal for phosphorus reduction in the planning region. Wilkin County Ditch #1 (WCD #1) outlets to the Bois de Sioux River, which is impaired for turbidity, dissolved oxygen, total phosphorus, and e. coli.