Hydes Lake is the headwaters to Carver Creek and is known for its excellent fishery. However, the lake has elevated nutrient levels which lead to poor water quality. A clean up plan for Hydes Lake has identified the need to reduce phosphorus loading by 81 percent from watershed sources.
A large portion of Wadena County has been identified as having a high or moderate probability of elevated nitrate concentrations. With almost all of the residents in Wadnea County getting there drinking water from groundwater sources, this issue is a top priority to the county. Through this project, nitrates and other water soluble contaminants leacing into sensitive sand plain aquifers will be reduced by providing cost-share incentives to encourage irrigation producers to convert high or medium pressure irrigation systems to low pressure systems.
Water quality and flood damage reduction goals can't be accomplished without reducing flows and taking a targeted approach to the upper most reaches of the most critical waterways. Water and sediment control basins are eartern structures that retain water and have been identified as one of the best tool for measured success in reducing peak flows. For this project, basins will be targeted and implemented in the Upper Cedar River Watershed, specifically in the Dobbins Creek Watershed.
High sediment levels in streams are prevalent throughout South Eastern Minnesota. Installing proven and cost-effective conservation practices that collectively reverse these impairments while also meeting flood protection and ecosystem support goals are needed. The purpose of this project is to design, construct, and maintain two retention structures and restore approximately one mile of failed stream bank. This project integrates objectives of Olmsted County, the Department of Natural Resources and City of Rochester into a common project.
Hydes Lake is the headwaters to Carver Creek and is known for its excellent fishery. However, the lake has elevated nutrient levels which lead to poor water quality. A clean up plan for Hydes Lake identified the need to reduce phosphorus loading by 81 percent from watershed sources.
This project is a continuation project of a successful 2011 Clean Water Fund project. The primary purpose of the project is to reduce soil loss from fields and improve the water quality of Red Lake Watershed District Ditch #3. This project will eliminate sediment deposition and reduce maintenance costs along the ditch system by installing 15 sidewater inlets. The project is a team effort with the Red Lake Watershed District and the landowners located along the ditch system.
The primary purpose of the project is to reduce soil loss from fields, improve the water quality of Roseau River Watershed District Ditch #3 by eliminating sediment deposition. This project will reduce maintenance costs along the ditch system by installing 29 sidewater inlets. The project will be a team effort with the Roseau County Soil and Water Conservation District and private landowners located along the ditch systems.
Stormwater runoff from the City of Kimball drains untreated into Willow Creek, a trout stream. Willow Creek is tributary to Lake Betsy, which is impaired by excess nutrients. This project targets phosphorus removal for Lake Betsy as identified in the Upper Watershed TMDL Studies for the Clearwater River Watershed and protection to Willow Creek trout habitat by infiltrating the 1.5-inch storm event off 428 acres in and around the City of Kimball.
Capitol Region Watershed District (CRWD), in partnership with the City of Roseville, will construct a volume reduction/capture-reuse irrigation facility below the Upper Villa Park Softball field in the City of Roseville. This project will protect Lake McCarrons and the Villa Park Wetland System (VPWS) by reducing runoff volumes and the pollutants associated with urban stormwater such as Total Phosphorus (TP), Total Suspended Solids (TSS), heavy metals, and petroleum products among others.
The Aitkin County Soil and Water Conservation District will partner with local lake associations and other eligible community partners to reduce the impacts of storm water runoff and retain water on the land. We will implement a mini-grant program that will install rain gardens and native vegetation buffers along shorelines using deep-rooted native vegetation that will filter runoff, promote infiltration, and control stormwater runoff and soil erosion.
The Redwood and Cottonwood River Watersheds have been assessed and many reaches have been impaired for turbidity, bacteria, and low dissolved oxygen. This project will accelerate conservation efforts to reduce overland runoff sediment, bacteria, and nutrient loadings contributing to water quality impairments in targeted subwatersheds.
The Redwood River and Cottonwood River watersheds encompass approximately 2,020 square miles of southwestern Minnesota in the Minnesota River Basin. Land use in these watersheds is mostly agricultural and area geology makes them prone to erosion. Surface water issues within the two watersheds are a concern of local leaders. The counties and Soil and Water Conservation District leaders formed the Redwood Cottonwood Rivers Control Area (RCRCA) Joint Powers Board in 1983 to address sedimentation, water quality and quantity, and erosion issues.
PROJECT OVERVIEW The Reinvest in Minnesota (RIM) Wetlands Reserve Program restores wetlands and grasslands through the purchase of permanent conservation easements on privately owned land. The easements limit future land use and put conservation plans in place for future management. The Minnesota Board of Soil and Water Resources is using this appropriation to accelerate the RIM Wetlands Reserve Program resulting in additional permanently protected wetlands and grasslands throughout the state.
The RIM-WRP program will expand past efforts and provide important benefits to the citizens of Minnesota by restoring and permanently protecting priority wetlands and associated upland native grassland wildlife habitat via perpetual conservation easements. This funding will leverage $12.6 million of federal WRP funds for the State of Minnesota and is expected to create and sustain 343 jobs and income to local landowners, businesses and others in the state based on USDA economic estimates.
The Reinvest in Minnesota (RIM) Reserve Wetlands Reserve Program (WRP) Partnership will accelerate the restoration and protection of approximately 4,620 acres of previously drained wetlands and associated upland native grassland wildlife habitat complexes via perpetual conservation easements. The goal of the RIM-WRP Partnership is to achieve the greatest wetland functions and values, while optimizing wildlife habitat on every acre enrolled in the partnership.
The RIM-WRP Partnership permanently protected 5,559 acres of priority wetlands and associated upland native grassland wildlife habitat via perpetual conservation easements on 60 sites and leveraged over $11 million of federal Wetlands Reserve Program funds.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase VI protected and restored 1,391 acres of previously drained wetlands and adjacent grasslands on 15 conservation easements.
The Reitz Lake restoration project began several years ago when water quality samples showed the lake was impaired. Carver County and residents around the lake took action and began to develop a plan (TMDL) to clean up Reitz Lake.Once the TMDL study and the associated implementation plan (which helps to target specific projects) were completed, funding was sought to target high priority projects around the Lake. First, direct untreated run-off from a farmed area of approximately 100 acres to the north of the lake will be slowed and filtered before it enters the lake.
Since 2008, a ravine on the Northwest side of Reitz Lake has been eroding on a private parcel, causing sediment and nutrients to discharge into the waterbody. This project will stabilize a ravine that has formed from Airport Road down to Reitz Lake.
The goal of this project is to implement 10-15 medium sized projects that will infiltrate and reduce pollutant loads to the waters in the Riley-Purgatory-Creek Watershed District. The District intends to achieve this by using their Citizen Advisors who are well involved with local associations, City staff who are familiar with associations in their jurisdiction and also seek less-known association through various advertising methods. We intend to use staff knowledge to insure that the projects are suitable for the site and implemented correctly to maximize efficiency.
State law (M.L. 2011, First Special Session, Ch. 6) directs restoration evaluations to be conducted on habitat restoration projects completed with funds from the Clean Water Fund (M.S. 114.D.50 Subd. 6). The Board of Water and Soil Resources (BWSR) is responsible for convening a Restoration Evaluation Panel containing at least five technical experts who will evaluate a sample of up to 10 habitat restoration projects annually. The Panel will evaluate the restorations relative to the law, current science, stated goals and standards in the restoration plans, and applicable guidelines.
In the North Fork Crow River Watershed, land use is mainly row crop agriculture with an extensive drainage system. Many of the existing tile lines have open intakes that transport sediment and nutrients to open ditches that drain to the North Fork Crow River. The river flows into Rice Lake which has elevated phosphorus levels. Studies show a major source of phosphorus loading comes from animal manure. Field applied manure has potential to runoff to open tile intakes being a direct path to surface water.
The Hawk Creek Watershed Project (HCWP) is trying to achieve a reduction in total suspended solids (TSS) and phosphorus, improve the altered hydrology, and increase water storage capacity in the Fort Ridgely Creek subwatershed by implementing suites of projects that include two grade stabilizations with retention ponds, four water and sediment control structures (WASCOBs), and two grass waterways for an estimated pollutant reduction of 280 tons of sediment/yr and 380 pounds of phosphorus/yr.
Little Rock Creek is the only trout stream in the Benton and Morrison County area. The creek has supported a wild brown trout population since they were introduced into Little Rock Lake in 1908. A population assessment done in 1992, however, failed to document the presence of brown trout suggesting that population may have become critically low during the drought years of the late 1980's and early 1990's. The stream has since been listed as impaired due to the low abundance of trout and other cold water fish.
Capitol Region Watershed District is partnering with St. Paul Public Schools to implement a variety of highly visible Best Management Practices at Central High School that will improve the quality of stormwater discharged to the Mississippi River. A tremendous amount of sediment is discharged from the school annually due to the large impervious areas and lack of vegetation. Implementing the projects will reduce sediment by 86% and phosphorus by 90% over the target area annually.
The purpose of this project is to increase awareness of environmental stewardship practices by providing six subgrants to local community partners. This program aims to engage the public, provide education on conservation practices and install up to eight conservation practices. This includes rain gardens, vegetative buffers and wetland restorations. Each subgrant will reduce the movement of sediment, nutrients and pollutants, retain water on the land and increase environmental awareness to the residents of Rice County.
Project funding is requested to complete the second phase of an on-the-ground implementation project to restore function to the partially drained Rice Lake wetland, which will reduce the largest phosphorous tributary loading source to downstream Detroit Lake, a high value recreational lake. This wetland restoration nutrient reduction project was broken up into two (2) construction phases due to cost constraints, with the Phase 1- Upper Pool Restoration Area completed in November 2021 using a Clean Water Fund Grant (C21-4482).
The Rice Lake Wetland Nutrient Reduction Project will provide nutrient reductions to downstream recreational water bodies by restoring the Rice Lake Wetland from its current area of 434 acres to pre-ditched water levels of approximately 896 acres.
The Rice Creek Watershed District (RCWD) will create a web-based, mobile-compatible public drainage system inspection and maintenance database. This database system will enable District staff to create and track maintenance requests and inspections from the field, including Geo-referencing locations requiring repair via a mobile device. The system will greatly reduce the time required to identify and log each maintenance request, enabling staff to inventory more miles of public drainage system yearly thereby identifying erosion problems more efficiently and thoroughly.
Rice Lake, in Stearns County, is an impaired water for nutrients that has a Total Maximum Daily Load (TMDL) Implementation plan developed. Rice Lake is one of the larger lakes in the county, offering major water recreation opportunities, economic benefits as well as fish and wildlife habitat. It is a priority for Stearns County to implement projects that have positive impacts on this resource.
This project will engage the public and community partners in Rice County. The goal of this project is the implementation of conservation practices that retain water on the land by providing up to five sub-grants for rain gardens, vegetative buffers, and wetland restorations.
Utilizing the new CREP III partnership to secure permanent conservation easements, this Phase 7 continuation of the RIM Buffers Program will protect and restore riparian buffer areas, totaling 4,106 acres on approximately 244 easements. This Program will continue to utilize a science-based ranking and selection process and be implemented locally, working with SWCD, NRCS, and FSA staff in the 54 county CREP area. It is estimated that $1 of OHF will be leveraged with $1 of Clean Water Funds and at least $4 of Federal funds through CREP.
This continuation of the RIM Buffers program will protect and restore riparian areas, permanently protecting approximately 900 acres on 30 easements. This program will continue utilizing a science-based ranking and selection process and be implemented locally, working with SWCD staff in targeted areas in the state. Historically, buffer funding was used to expand basic water quality buffers into larger buffers.
Using the Reinvest in Minnesota (RIM) program, this project addresses the potential loss of grassland habitats from conversion to cropland and accelerates grassland protection efforts not covered by other programs. Working in coordination with established Prairie Conservation Plan Local Technical Teams (LTTs), this proposal will enroll 830 RIM acres (approximately 10 easements), focusing on Minnesota Prairie Plan-identified landscapes.
RIM Wetlands Phase X will protect and restore approximately 420 acres of previously drained wetlands and adjacent native grasslands on approximately 9 easements across the State to restore wetlands and associated uplands for habitat and associated benefits. The Board of Water and Soil Resources (BWSR) will utilize the Reinvest in Minnesota (RIM) easement program in partnership with local Soil and Water Conservation District (SWCDs). The program will continue utilizing a ranking and selection process and be implemented locally by SWCD staff.