Rice Lake Wetland Restoration Project Construction- Phase 2

Project Details by Fiscal Year
2023 Fiscal Year Funding Amount
$640,000
Fund Source
Clean Water Fund
Recipient
Pelican River WD
Recipient Type
Local/Regional Government
Status
In Progress
Start Date
December 2022
End Date
December 2025
Activity Type
Grants/Contracts
Counties Affected
Becker
Becker
Project Overview

Project funding is requested to complete the second phase of an on-the-ground implementation project to restore function to the partially drained Rice Lake wetland, which will reduce the largest phosphorous tributary loading source to downstream Detroit Lake, a high value recreational lake. This wetland restoration nutrient reduction project was broken up into two (2) construction phases due to cost constraints, with the Phase 1- Upper Pool Restoration Area completed in November 2021 using a Clean Water Fund Grant (C21-4482). The project funding request is for construction of the Phase 2-Lower Pool Restoration Area consisting of a water control structure/rock fishway with draw-down capabilities (approximately 50-ft width X 200-ft length X 3-ft thickness); a 15 ft. wide low-water crossing; and an embankment/access road. By restoring the wetland's hydrology (Phase 1 & 2), the pre-project annual phosphorous export load (2,600-6,000 lbs/yr) from this wetland is estimated to be reduced by an average of 50%, The Phase 2- Lower Pool Restoration Area is estimated to reduce phosphorus loads between 600 - 1,500 lbs/year depending upon summertime weather conditions. Secondary project benefits include, but are not limited to, increased wildlife habitat (pollinators, migratory waterfowl, etc.), improved aesthetics, reduced water level fluctuation, increased groundwater recharge, increased carbon sequestration, and enhanced recreational opportunities.

Competitive Grant Making Body
Board Members and Qualifications

http://www.bwsr.state.mn.us/board

Advisory Group Members and Qualifications

http://www.bwsr.state.mn.us/board

Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
The Laws of Minnesota 2021, 1st Special Session, Chapter 1, Article 2, Sec. 6(b)
Appropriation Language

(b) $10,762,000 the first year and $11,504,000 the second year are for grants to local government units to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. Up to 20 percent of this appropriation is available for land-treatment projects and practices that benefit drinking water.

2023 Fiscal Year Funding Amount
$640,000
Direct expenses
$0
Proposed Measurable Outcome(s)

The Phase 2-Lower Pool Restoration area is estimated to reduce wetland phosphorus loading by 600 lbs/yr (50% reduction) to downstream Detroit Lake. Detroit Lake has a 10-yr reduction goal of 203 lbs/yr and a long-term reduction goal of 697 lbs/yr.

Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Pelican River WD are: Chris Jasken, Dennis Kral, Ginny Imholte, Janice Haggart, Lowell Deede, Orrin Okeson, Rick Michaelson
Project Manager
First Name
Tera
Last Name
Guetter
Organization Name
Pelican River WD
Street Address
211 Holmes St. W, Ste 201
City
Detroit Lakes
State
MN
Zip Code
56501
Phone
218-846-0436
Email
tera.guetter@arvig.net
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767