The goal of this project is to continue and finalize Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The project will add representation of point source discharges to the model, compile flow and water quality data for the purposes of calibration and validation. The end result will be an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.
The goal of the project is the development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL.
The overall goal of this project is to perform water quality monitoring duties to accomplish MPCA’s SWAG monitoring efforts at the four sites listed in Section IV of this application for the Middle Minnesota River stream sites selected in Renville, Redwood and Brown counties and allow for the assessment of aquatic life and aquatic recreation use for those reaches of the minor streams.
This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.
The MPCA has identified 13 stream sites in the watershed to characterize watershed water quality. This project will supplement and complement the identification of the top 50 sites in the watershed that are contributing to water impairment and also help in identification of priority watersheds in the re-write of the watershed comprehensive plan. Water samples and field measurements will be collected at each monitoring location ranging from baseline events to high flow events.
Wabasha Soil and Water Conservation District, in conjunction with Wabasha Natural Resources Conservation Service field office and Farm Service Agency field office, will complete 75 compliance checks and writing or rewriting Highly Erodable Lands plans throughout Wabasha county. Technical staff, upon completion, will partner with landowners to coordinate potential future funding to increase conservation on the land and increase water quality in streams and groundwater through Best Management Practices placement.
To provide professional development for one staff member at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for one staff member at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
This project will fully fund three Nonpoint Engineering Assistance (NPEA) Joint Powers Board positions in cooperation with the NPEA Base Funding anticipated at $130,000 per year. This will allow a 2nd Professional Engineer to be retained in addition to a Lead Engineer and Technician. This 'accelerated' engineering previously was funded with BWSR Challenge Grants, and an EPA319 grant with corresponding BWSR CWF Matching Grant to handle the high workload associated with the large number of BWSR feedlot cost-share projects approved in South East Minnesota.
This project will extend two Feedlot Technical positions initially created and funded by a FY2011 CWF Feedlot Water Quality Grant that assess and help fix animal waste runoff from small feedlots. The technicians will work with and under the Technical Authority and priorities of the South East Soil and Water Conservation District Tech Support JPB lead Engineer. This project will enable more projects to be constructed resulting in a reduction of nitrogen, phosphorus and fecal coliform runoff into surface and ground water in South East Minnesota and the Mississippi River.
The proposal was to accelerate the protection of 1,220 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting. Over the course of the appropriation, we acquired 11 parcels for a total of 1,484.05 acres which exceeded our total acre goal of 1,220 acres by 264.05 acres. Breaking down acres by ecological section we acquired 876 acres in the metro, 152 acres in the forest/prairie, and 456 acres in the prairie. We have a balance of $52,798 that will be returned to the Fund despite exceeding our acre goals.
The program was to accelerate the protection of 1,230 acres of prairie grassland, wetland, and other wildlife habitat as Waterfowl Production Areas open to public hunting in Minnesota. Over the course of the appropriation, we acquired 14 parcels for a total of 1,240.79 acres which exceeded our total acre goal of 1,230 acres by 10.79 acres. Breaking down acres by ecological section we acquired 160 acres in the forest/prairie and 1,080.79 acres in the prairie. We have a balance that will be returned to the Fund despite exceeding our acre goals.
Many of Minnesota's wetlands have been lost and the remainder degraded. The original proposal planned for 15,000 acres of wetland/shallow lake enhancement to provide critical habitat for each life stage of waterfowl and wetland wildlife. The six projects subsequently completed with this appropriation enhanced 13,800 acres of wetlands and shallow lakes in the Prarie and Forest/Prairie Ecosections of Minnestoa.
The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.
The table below provides a short summary of the acres and sites accomplished. We enhanced or restored 59,495 acres in 458 separate habitat projects.Project Type # Sites # AcresFencing for conserv grazing 6 721grassland conversion 33 1,124Invasive Species Control 43 1,599mowing 3 104Prescribed burn 214 48,368Restoration 13 123Woody Removal 146 7,457
This program accelerated the permanent protection of 1,001 acres of wetlands (185 acres) and grasslands (816 acres) as Waterfowl Production Areas open to public hunting in Minnesota. Over the course of the appropriation, PF acquired 5 parcels for a total of 1,001 acres which exceeded our total acre goal of 935 acres by 66 acres. Breaking down acres by ecological section we exceeded our acre goal in the prairie area by 346 acres. We are also happy to bring in $3,794,200 of non-state match dollars to this effort, exceeding our match goal of $3,320,000 by $474,200. We h
This proposal impacts shallow lakes and wetlands in Minnesota through the design and construction of projects, enhancement work done by DNR roving habitat crews, and shallow lakes work identified and initiated through the DNR Shallow Lakes program. Ten thousand acres of wetlands were enhanced by these activities.
Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.
The occurrences of contaminants including antibiotics, other pharmaceuticals, and personal care products in the environment have gained increasing attention in recent years because of their potential health and ecological impacts. However, serious gaps remain in our understanding of these contaminants and the significance of the threats they may pose, such as to drinking water. Through this appropriation scientists at the University of St.
This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River