To add to the known history of the Chinese experience in Minnesota in the years 1911-2011, the CAAPAM conducted oral history interviews of Chinese Americans to gather information about their memories of immigration and settlement in Minnesota in relation to historical events happening in the homeland after 1970.
The interviewees were chosen to represent diverse periods, backgrounds, lengths of residency and professions.
In a collaborative effort between the Wabasha Public Library and the Wabasha County Museum the history of the Wabasha area was interpreted in a weekend event focusing on the Treaty of Traverse des Sioux and its impact on the "Half-Breed Tract", a reservation of children of mixed Indian and European ancestry. The 1851 signing of the Treaty of Traverse des Sioux and the resulting settlement and tourism were analyzed through the perspectives of the native Dakota, the Euro-American tourist and the newly arrived settlers from 1851 to 1861.
The MPCA has identified 13 stream sites in the watershed to characterize watershed water quality. This project will supplement and complement the identification of the top 50 sites in the watershed that are contributing to water impairment and also help in identification of priority watersheds in the re-write of the watershed comprehensive plan. Water samples and field measurements will be collected at each monitoring location ranging from baseline events to high flow events.
This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.
Wabasha Soil and Water Conservation District, in conjunction with Wabasha Natural Resources Conservation Service field office and Farm Service Agency field office, will complete 75 compliance checks and writing or rewriting Highly Erodable Lands plans throughout Wabasha county. Technical staff, upon completion, will partner with landowners to coordinate potential future funding to increase conservation on the land and increase water quality in streams and groundwater through Best Management Practices placement.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for one staff member at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
The Pope County Water Plan has identified surface water quality and erosion control as top priority resource concerns. These two priorities account for 33% of the phosphorus loading to Lake Emily. The Lake Emily Watershed Best Management Practices (BMP) Prioritization Project will provide GIS-based water quality analysis to assist the Pope Soil and Water Conservation District in determining effective locations for BMP implementation and will prioritize the areas from high to low for phosphorus, nitrogen, and sediment delivery from contributing runoff during rainfall events.
Pope Soil and Water Conservation District, partnered with Natural Resources Conservation Service staff and landowners, will install 22 targeted water and sediment control structures in two priority subwatersheds (Trappers Run and Minnewaska). These structures have the potential to reduce sediment load by 514 tons per year, and phosphorus by 440 pounds per year.
The City of Glenwood Water Quality Assessment & Best Management Practice Prioritization Project will include an assessment and analysis of approximately 1,796 acres affecting water quality and contributing runoff to Lake Minnewaska. By implementing this water quality analysis and assessment of the City of Glenwood and sub watersheds, a reducing pollutants by 1,287 pounds per year of phosphorus and 203 tons per year of sediment.
The Zumbro River Watershed Pollutant Load Monitoring Network (WPLMN) project will continue existing efforts to calculate seasonal pollutant loads for the Root River. The Zumbro Watershed Partnership (ZWP) along with Olmsted County Environmental Services will assist the Minnesota Pollution Control Agency (MPCA) with water quality monitoring and pollutant load calculations of four sub-watershed sites. Approximately 50 grab samples per site (total of 200) between ice-out and October 31 of 2016 and 2017 will be collected along with field measurements and observations.
The Lake Emily Watershed BMP Targeted Implementation Project will provide funding for 48 water and sediment control projects and potential shoreline and riparian restoration. This work would address surface water quality sources identified in the water plan (Section 2-pg 11) including direct drainage from the Lake Emily sub-watersheds (070200050304, 070200050303, 070200050203, 070200050201, 070200050202) the Little Chippewa, and from upstream discharge between Lake Emily and Lake Minnewaska.
Pope SWCD has 9 motivated landowners with 21 WASCOBs, 1 lined waterway, and 1 shoreline restoration in two priority sub watersheds (Trappers Run and Minnewaska). Based on averages calculated from recently constructed WASCOBs in the West Central Area II these projects have the potential to reduce TSS by 518 T/year, and 446 lbs./year of TP. This project will provide a secondary benefit to improve downstream water quality to Lake Emily. The project will result in meeting 99% of the Lake Emily TP lbs/yr.
Lake Emily is a high priority recreational lake in Pope County and is currently not meeting state water quality standards due to high phosphorus levels. This project will provide funding for 26 water and sediment control projects with potential shoreline and riparian restoration projects. This work will address surface water quality sources including both direct drainage and upstream discharge. Collectively, these projects have the potential to annually reduce sediment and phosphorus leaving the field which will directly address 15% of Lake Emily's phosphorus reduction goal.
This project will design and install targeted practices to reduce the volume, sediment and phosphorus from urban stormwater runoff directly discharging into Perro Creek and Lily Lake. This project is funded through the Washington County allocation of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.