2019 - Watershed Based Funding Metro (Carnelian-Marine-St. Croix WD)

Project Details by Fiscal Year
2019 Fiscal Year Funding Amount
$78,760
Fund Source
Clean Water Fund
Recipient
Carnelian-Marine-St. Croix WD
Recipient Type
Local/Regional Government
Status
Closed
Start Date
September 2018
End Date
December 2021
Activity Type
Grants/Contracts
Counties Affected
Washington
Washington
Project Details

Working with the City of Scandia will develop stormwater management plan and BMP design for Bliss neighborhood from 189 St. to 191st Street. Retrofit of infiltration and bio-filtration into work currently scheduled for fall of 2018.

The District will work with May Township to acquire an easement from 2 cooperative land owners and construct an infiltration basin to receive and treat current and future stormwater discharge from Panorama Avenue and 131st Street on Big Carnelian Lake.

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
no
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
The Laws of Minnesota 2017, Chapter 91, Article 2, Sec 7, (a)
Appropriation Language

$4,875,000 the first year and $4,875,000 the second year are for a pilot program to provide performance-based grants to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan or metropolitan surface water management frameworks or groundwater plans. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph.

2019 Fiscal Year Funding Amount
$78,760
Other Funds Leveraged
$8,064
Direct expenses
$78,760
Administration costs
$3,063
Number of full time equivalents funded
0.0651341
Proposed Measurable Outcome(s)

Deliverables will be a feasibility study with related survey work for storm water and water quality management across the project area. Project will also include design and construction of 2 biofiltration basins with a combined volume reduction of 89,000 cf. annually as well as a combined 1.58 lbs reduction of phosphorus and 288 lbs. of TSS. Infiltration basin will be sized to contain a minimum of 22,000 CF of storage with reductions in TSS of 951 lbs. per year and nutrients of 5.23 lbs. of total phosphorus with final goal of containing 2+ year event from a 30 a. area. The basin will be connected to storm sewer constructed in conjunction with May Township road projects converting class 5 gravel roads to asphalt.

Measurable Outcome(s)

This project has resulted in an estimated annual reduction of 2.4 lbs of Phosphorus, 2.89 tons of Sediment, .3 acre-feet of Volume Reduced

Proposed Outcomes Achieved
achieved proposed outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Andy Weaver,Carl Almer,Jeff Roach,Kristin Tuenge,Michelle Jordan,Mikael Isensee,Mike White,Paul Richert,Tom langer,Wade Johnson
Project Manager
First Name
Mikael
Last Name
Isensee
Organization Name
Carnelian-Marine-St. Croix WD
Street Address
11660 Myeron Road North Stillwater, MN 55082
City
Stillwater
State
MN
Zip Code
55082
Phone
651-439-7385
Email
mike.isensee@cmscwd.org
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767