This project will develop the Pomme de Terre Watershed Total Maximum Daily Load (TMDL) study for the second round of the 10-year watershed approach cycle in the Pomme de Terre watershed. This phase of the project will address 4 stream impairments and 3 lake impairments and produce a draft TMDL document. A second phase may be needed as the stressor ID report identifies more stream reaches with TMDL relevant stressors.
The goal is to facilitate strategic networking, learning, and participation of targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to become aware of water quality issues and increase best management practice adoption to restore and protect water quality in the Pomme de Terre River watershed. This goal will benefit the completion of the second cycle of the watershed approach by providing useful information important in the completion of Watershed Restoration and Protection Strategies (WRAPS) report.
The Pomme de Terre River watershed is located in west central Minnesota and occupies a portion of six counties. For many years surface water quality within the watershed has been a concern to local government. In 1982 the Pomme de Terre River Association Joint Powers Board (JPB) was formed to begin addressing this issue. In 2002 the Pomme de Terre River was placed on the Impaired Waters list for turbidity. The goal of the JPB is to improve the local water resources within the watershed through voluntary efforts and building relationships with local landowners.
The Pomme de Terre River watershed is located in west central Minnesota and occupies a portion of six counties. For many years surface water quality within the watershed has been a concern to local government. In 1982 the Pomme de Terre River Association Joint Powers Board was formed to begin addressing this issue. In 2002 the Pomme de Terre River was placed on the Impaired Waters list for turbidity. This project is a continuation of a 2011 Clean Water Fund project.
PDTRA will use this funding to pursue goals stated in the CWMP. PDTRA has ID'd 5 priority areas to focus sediment & phosphorus reduction goals: Northern Lakes, Christina/Pelican Lakes, PDT River Lakes Chain, PDT River Corridor, & Drywood Creek. Plans include but aren't limited to: water & sediment control basins, alternative tile intakes, waste pit closures, grade stabilizations, livestock exclusions, shoreline restorations/stabilizations, cover crops.
The Pomme de Terre River watershed is located in west central Minnesota and occupies a portion of six counties. For many years surface water quality within the watershed has been a concern to local government, and in 1982 the Counties and SWCDs within the watershed area formed the Pomme de Terre River Association Joint Powers Board to begin addressing this issue. In 2002 the Pomme de Terre River was placed on the Impaired Waters list for turbidity.The project partners are collaborating to improve surface water quality within the watershed with a grant from the Clean Water Fund.
The goal of the Pomme de Terre River Association (JPB) is to improve local water resources within the watershed through targeted voluntary efforts and build strong relationships with local landowners, producers, and citizens. Utilizing the State's first Watershed Restoration and Protection Strategy, the JPB has targeted and identified specific areas and activities required for marked water quality improvement.
The Pomme de Terre River Association will partner with the Minnesota Pollution Control Agency to conduct water quality monitoring in the Pomme de Terre River Watershed. The purpose will be to determine if waters meet the states non-point source pollution standards. The data collected will be utilized to produce the cycle two Watershed Restoration and Protection Strategy (WRAPS) report and supporting documents for the watershed. Through the utilization of this funding a total of 11 lakes and 7 stream reaches will be assessed.
This project will establish a framework with the Pomme de Terre River Association (PDTRA), county staff, Soil and Water Conservation District staff, and state agencies that will outline their involvement throughout the development of the Watershed Restoration and Protection Strategy (WRAPS) for the Pomme de Terre River watershed. This work will form the basis to establish restoration and protection strategies that local governments and watershed organizations can use to make decisions that will lead to protecting and restoring the waters in the watershed.
The goal of this project is to extend through 2016, calibrate, and validate the existing watershed model using Hydrological Simulation Program FORTRAN (HSPF) for the Pomme de Terre River Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) studies.
Develop patio with seating and grills, covered walkway and redevelop existing game room/bathroom to provide ADA-accessible toilets and showers in 366-acre park.
Certain stretches of the Pomme de Terre River have been identified as impaired. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the impaired stretches to an acceptable level. It will also identify strategies that would improve water quality in these impaired stretches. Some funds will support public input activities into the Pomme de Terre River watershed management plan.
The goal of the Pomme de Terre River Association (PDTRA JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. To further our efforts in strategically working to achieve our reduction goals, listed in our Major Watershed Restoration and Protection Strategies Report and Turbidity Total Maximum Daily Load report, we would like to further define our Priority Management Zones through the development of a hydrological conditioned Digital Elevation Model.
The Pomme de Terre River Association (PDTRA) will use this funding to pursue goals stated in the Comprehensive Watershed Management Plan. PDTRA has identified five priority areas to focus sediment & phosphorus reduction goals: Northern Lakes, Christina/Pelican Lakes, Pomme de Terre River Lakes Chain, Pomme de Terre River Corridor, and Drywood Creek. Plans include but aren't limited to: water & sediment control basins, alternative tile intakes, shoreline restorations/stabilizations, critical area plantings, grass waterways and SSTS upgrades.
This project is coordination and oversight of the contract to conduct tree clearing at the Ponds behind Erie Pier site in the St. Louis River Area of Concern.
The Pope Soil and Water Conservation District Chippewa River Watershed Surface Water Assessment Grant (SWAG) monitoring program will provide knowledge of water quality to local partners and the Minnesota Pollution Control Agency. Five sites, comprised of two lakes and three along two streams, will be monitored over the course of two years. There are 5 townships throughout the Chippewa watershed that each house a monitoring site: Nora, New Prairie , White Bear Lake, Barsness, and Gilchrist.
To provide a year round venue for arts and cultural and heritage events that will also provide handicapped accessible restroom facilities with a breastfeeding and diaper change area.
To offer demonstrations, hands-on activities, dance, music and spoken word performances on the history of the Armed Services and Native American culture.
This project will work to install 30 water and sediment control basins (WaSCOBs) in three subwatersheds adjacent to Lake Minnewaska to reduce the amount of total phosphorus (TP) entering Pelican Lake, Lake Minnewaska, and Lake Emily. Pelican Lake and Lake Emily have been identified in an 8 lake Total Maximum Daily Load (TMDL) study conducted in Pope County as being impaired for excess nutrients.
This project will develop feasibility analysis, a drawdown plan for Malmedal Lake and an analysis of available options for fish barriers in the watersheds of Malmedal Lake and Strandness Lake.
Pope County Ditch 6 (CD 6) is an 18 mile channelized watershed and a primary tributary to Ashley Creek. CD6 and Ashley Creek are impaired for bacteria, dissolved oxygen and aquatic organisms. This project will address the storm water runoff concerns identified within this public drainage system in conjunction with repairs scheduled for 2017-2018. Alternative intake structures to manage nutrients and other practices, such as water and sediment control basins, will be installed to retain water on the upland properties and minimize flow rate and velocity.
The project’s first phase includes development and implementation of a sampling plan to investigate stormwater quality within impervious areas; soil borings to determine the soil type; a topographical survey to determine drainage patterns and infrastructure locations; and data gathering of existing infrastructure. A season-long stormwater quality monitoring program will monitor stormwater within the drainage areas that flow directly to the storm sewer, including monitoring of roof runoff and overland flow to determine potential pollutant sources and mitigation options.
To partner with the Scott County Historical Society to co-design a mobile recording booth big enough to house high-quality recording equipment, a table and seating for 2-4 people, and create a Best Practices manual on collecting oral histories. The booth would include a ramp and wide door and table for ADA accessibility. Scott County Fair will pilot the first round of interviews during the fair, and support the Historical Society to implement plans to manage the collection of stories, train volunteers to staff the booth, and conduct transcription.
The Fridley Historical Society is applying for a grant that will enable us to hire an interviewer to conduct 15 oral histories in order to explore the post World War II suburban development of Fridley, and then have the histories transcribed. Our intention is to cover the years 1945-1970, by which time Fridley was largely developed.
The grant money was utilized for the creation of Record Drawings and plans.
Record Drawings are documents produced by licensed professionals detailing the existing condition of the a particular structure which is needed in order to proceed with the project's scope of the Chatfield school and Potter Auditorium renovation and creation of a regional arts center.
Water quality in Powers Lake is declining. Water monitoring professionals from the Washington Conservation District (WCD), funded by the South Washington Watershed District (SWWD), have determined that average annual phosphorus concentrations are increasing in the lake. Higher phosphorus concentrations lead to more frequent algae blooms and reduced water clarity.Powers Lake is at risk mainly due to increased urbanization within its watershed (the land area that drains to the lake).
This project restored and enhanced 165 acres of prairie & woodland habitat along the Mississippi and Rum Rivers. Outcomes include increased plant diversity and habitat for game and non-game species and is beneficial to migratory waterfowl on the Mississippi River flyway as well as to pollinators and resident wildlife.
Healthy prairies contribute numerous benefits, such as providing habitat for wildlife and pollinators, maintaining and improving water quality, stabilizing roadsides, and providing a sustainable source of materials for bioenergy production and other products. Since European settlement the once vast expanses of Minnesota prairie covering 18 million acres have been reduced to small remnants totaling about 235,000 acres. With this decline has also come a drastic reduction in the genetic diversity of the various species typical of Minnesota prairies.