Pomme de Terre River Watershed Hydrological Simulation Program FORTRAN (HSPF) Model Extension

Project Details by Fiscal Year
2017 Fiscal Year Funding Amount
$19,996
Fund Source
Clean Water Fund
Recipient
RESPEC
Recipient Type
For-Profit Business/Entity
Status
Completed
Start Date
April 2017
End Date
June 2018
Activity Type
Modeling
Counties Affected
Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Project Overview

The goal of this project is to extend through 2016, calibrate, and validate the existing watershed model using Hydrological Simulation Program FORTRAN (HSPF) for the Pomme de Terre River Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) studies.

2017 Fiscal Year Funding Amount
$19,996
Number of full time equivalents funded
0.1
Project Manager
First Name
Chuck
Last Name
Regan
Organization Name
Minnesota Pollution Control Agency
Street Address
520 Lafayette Rd N
City
Saint Paul
State
MN
Zip Code
55155
Phone
(651) 757-2866
Administered By
Administered by
Location

520 Lafayette Road
St. Paul, MN 55155

Phone
800-657-3864