The goal of this project is to develop a tool to generate meteorological time-series input data for Minnesota Pollution Control Agency Hydrologic Simulation Program FORTRAN (HSPF) models based on publicly available gridded meteorological products.
Minnesota’s use of groundwater has increased over the last two decades. An increasing reliance on groundwater may not be a sustainable path for continued economic growth and development. The DNR is establishing three pilot groundwater management areas (GWMA) to help improve groundwater appropriation decisions and help groundwater users better understand and plan for future groundwater needs associated with economic development.
The Soudan Iron Mine near Ely, Minnesota is no longer an active mine and is now part of a state park, as well as the home to a state-of-the-art physics laboratory at the bottom of the mine. The mine has also been discovered to contain an extreme environment in the form of an ancient and very salty brine bubbling up from a half-mile below the Earth’s surface through holes drilled when the mine was active. Strange microorganisms – part of an ecosystem never before characterized by science – have been found living in the brine.
To acquire fee title to 16 parcels to allow for the extension of the state trail from Harmony south to the Iowa state boarder with a spur to Niagara Cave.
This project will monitor six sites within the Minnesota River Basin: Hawk Creek near Maynard, Hawk Creek near Granite Falls, Beaver Creek near Beaver Falls, Yellow Medicine River near Granite Falls, Yellow Medicine River near Hanley Falls, and Spring Creek near Hanley Falls. The sites will be monitored according to the Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedure, which is the procedure being followed for sites currently monitored by the Hawk Creek Watershed Project.
To hire a qualified and experienced HVAC engineer to evaluate current system preparatory to better control of the Hubbard County Historical Society museum environment.
To hire a qualified and experienced HVAC engineer to evaluate the current system preparatory to better control of the Brown County Historical Society museum environment.
Hennepin County Habitat Conservation Program (HCP) partners successfully completed work with the Phase 1 / ML 2018 OHF appropriation. HCP permanently protected 179 acres of land through six conservation easement projects, exceeding protection goals by 19 acres. HCP accomplished nearly 10 acres of restoration and 162 acres of enhancement, exceeding original habitat improvement goals by 101 acres.
Once known for its clean water, fertile soil, and healthy habitat, in more recent times the Heron Lake Watershed in southwestern Minnesota has been heavily impacted by pollution from intensive agriculture, feedlots, non-compliant septic systems, and urban stormwater runoff. The Heron Lake Watershed District is using this appropriation for public outreach and installation and monitoring of water quality improvement projects aimed at reducing sediment and nutrient loading for the benefit of public health, recreation, and wildlife habitat.
The project will involve monitoring twelve stream sites and one lake in Jackson County. The stream sites are known to be impaired. The purpose of monitoring in multiple locations is to determine the source of the impairments.
First phase of implementation of the Hidden Falls-Crosby Farm Master Plan expected to be completed in early 2019. Projects may include construction of buildings, installation of park amenities, paving of trails, paving of roads and parking lots, utility installation or relocation, grading, stormwater management, erosion control, lighting, signage, and landscaping.
The goal of the High Island Creek Watershed Pollutant Load Monitoring project is to assist the Minnesota Pollution Control Agency (MPCA) with meeting the objectives of the Watershed Pollutant Load Monitoring Network (WPLMN). This will be accomplished by conducting water chemistry monitoring at two specified stream locations from ice out through October 31, capturing snow melt, rainfall events and base flow conditions. In addition, project staff will compile and submit the required data, information, and reports, and calculate pollutant loads using the FLUX32 model.
No project funds were spent. The Lessard-Sams Outdoor Heritage Council did not request that any services be performed with project funds. Accordingly, the $50,000 appropriation will be returned to the Outdoor Heritage Fund.
To hire a qualified consultant to write a historic structure report for the Alliance Francaise building, a contributing structure in the Warehouse District, listed in the National Register of Historic Places.
The website currently under development will include an explanation of the digitization process and importance of the conservation project and 3D-scanning techniques performed during 2012 and 2013. It will also house the 3D images, providing a user-friendly way to search images by categories and learn the interpretation of the carvings.
The Minnesota Historical Society continued to work on revitalizing some of the state's most important and prominent historic sites. Program planners developed new programs at Historic Fort Snelling, Mille Lacs Indian Museum and Trading Post and the Charles A. Lindbergh Historic Site. Evaluation results showed that 81% of program guests surveyed felt that these programs increased their knowledge of Minnesota history, places and culture. 71% of guests responded that these programs increased their personal connection to history.
To hire a qualified architect to conduct a conditions assessment of the Crookston Carnegie Public Library, listed in the National Register of Historic Places.
Partner: Northern Bedrock Historic Preservation Corps
The Northern Bedrock Historic Preservation Corps develops lifelong workforce skills by connecting young people to the earth, cultures, and traditions through historic preservation work and outdoor service. In partnership with the Minnesota Historical Society, a feasibility study was conducted and a business plan developed outlining the initiative's purpose and goals, detailing the proposed scope and strategies, and demonstrating that the initiative is financially viable.