2010 Activities:
Offer Fond du Lac Family language camp. Receive training for Ojibwe language immersion teaching. Develop Ojibwe immersion curriculum. Publish 2,000 copies of Daga Anishinaabemodaa with illustrations and audio CD. Establish feeder college and pre K-12 school network. Draft guidelines and establish elder-student apprenticeships. Set up and announce website. Accept students and pre K-12 teachers for Ottertail language camp for summer 2011 and promise financial support. Evaluate all grant activities.
The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.
Funding for contractors and consultants to perform work beyond the standard operational work done by staff. Contractors and consultants may include the Conservation Corps of Minnesota, corrections crews, and specialty equipment contractors. Initiatives include, but are not limited to habitat management, nursery propagation, planting, invasive species management, oak wilt and EAB management.
Forever Green Initiative develops perennial and cover cropping systems specific to Minnesota that are necessary to protect and restore the state's surface and groundwater resources while increasing efficiency, profitability, and productivity of Minnesota farmers.
To hire qualified professionals to write a structural assessment of the Frederick W. Kiesling House, listed in the National Register of Historic Places
To enhance the Creative Arts building on the fairgrounds in order to improve the arts experience for fairgoers. The Freeborn County Fair will replace archaic lighting, add glass display cabinets, add a new display area of pre-school art, and provide musical performances.
To provide arts and heritage programming by local artists. Programming will include story-telling, ethnic music, demonstrations of period culture, lathe turning, spoon carving, and spinning.
BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.
This is a project to to proactively address future threats to safe drinking water. This project will incorporate findings and recommendations from the Future of Drinking Water report to assess, prioritize, and manage drinking water risks. Through this project, a voluntary statewide plan for protecting drinking water will be developed. Additional outcomes from this project include public health policies and an action plan.
This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.
This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.
The goal of this project is to construct, calibrate, and validate three HSPF watershed models. The project will result in HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The models are expected to generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.
The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.
The goal of this project is to construct, calibrate, and validate a watershed model using Hydrologic Simulation Program FORTRAN (HSPF). The project will result in a HSPF model that can readily be used to provide information to support conventional parameter TMDLs.
The goal of this project is to supplement and refine the Deer Creek Watershed TMDL Report and Implementation Plan project with detailed determinations of critical source areas and prioritization of the associated management practices, facilitated by additional meetings with local resource managers and validated with a field survey. Completed work will more fully inform the TMDL report and TMDL implementation plan on critical source areas of sediment and quantify those sources.
The Crow Wing River Watershed consists of approximately 1,959 square miles in the north to north central portion of the Upper Mississippi River Basin in Central Minnesota. The watershed encompasses all or parts of Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd and Wadena Counties. The dominant land use within the watershed is forested (41%), agriculture (32%), grass, shrub and wetland make up 17%, water (7%) and urban (3%).
This phase of the project will complete the analysis of existing and newly collected water quality data in the Red River of the North-Grand Marais Creek watershed and also verify the impairments on the currently listed reaches and determine the status of the remaining river reaches as being either impaired or currently meeting standards. Stakeholder involvement and public participation will be a primary focus throughout the project.
To repair and restore the gutter system and cornice assembly of the George W. Gardner House, a contributing feature of the Historic Hill District listed in the National Register of Historic Places