This Phase 6 request for Ducks Unlimited's land protection and restoration program will acquire and restore 600 acres of prairie land on shallow lakes and prairie land with restorable wetlands in the Prairie Pothole Region of SW Minnesota for transfer to the Minnesota DNR for inclusion in the state Wildlife Management Area system. This land acquisition and restoration work will focus on land that buffers shallow lakes and provides breeding habitat for ducks and other prairie wildlife.
This pilot program protected 1,210 acres of wild rice lake shoreland habitat in the Northern Forest Section by securing 14 permanent RIM conservation easements and four fee-title acquisitions, surpassing our goal of 700 acres, and doing so $250,202 under budget.
To produce a one-hour documentary on the life and significant contributions of Minnesota Supreme Court Associate Justice Rosalie Wahl based on thorough and completed research.
The Phase VI Habitat Restoration Program included an Orr Property Acquisition, a Vandegrift Wetland Restoration, an IC&E Wetland Enhancement Project and a Headwaters Streambank Restoration Project. As a result, 296 acres of habitat and wetlands were protected, enhanced or restored.
To improve fair visitor access to performing arts at the Sherburne County Fair by installing stage lighting, making the seating area handicap accessible, and building a dressing and changing room for performers.
to construct phase 4 of the Shingobee Connection, which is a bike/pedestrian bridge across Pumphouse Bay of Leech Lake adjacent to the existing road bridge
To construct an Arts and Heritage Center on the fair grounds. The Sibley County Fair will erect an Arts and Heritage Center with a 40 foot stage and two dressing rooms. The building will primarily serve as an educational arts and culture center for the fair. The fair will present acts on the stage from six to eight hours per day during the fair.
Design & engineering to develop building plans for a addition to the Nature Center, Sugar Shack, Garden House, Shelters, and Maintenance Facility. Develop site plans for gathering nodes, observation, amenities, trails, landscaping, signage, stormwater management; initiate construction for site related improvements such as trails, gathering nodes, nature observation, signage, landscaping, and site amenities. Supplement construction costs for amenities on the Campus Site and Infrastructure project.