The MPCA has identified 13 stream sites in the watershed to characterize watershed water quality. This project will supplement and complement the identification of the top 50 sites in the watershed that are contributing to water impairment and also help in identification of priority watersheds in the re-write of the watershed comprehensive plan. Water samples and field measurements will be collected at each monitoring location ranging from baseline events to high flow events.
This project will obtain spatial and long-term pollutant load information from the Root River watershed in Southeast Minnesota. To accomplish this, the Fillmore Soil and Water Conservation District (SWCD) will assist the MPCA with water quality monitoring and annual pollutant loading calculations. Approximately 25 grab samples will be collected/site/year at 5 sites within the Root River watershed (totaling 125 grab samples/year). Annual load calculations for each site will be determined using the FLUX32 model.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
This project will fully fund three Nonpoint Engineering Assistance (NPEA) Joint Powers Board positions in cooperation with the NPEA Base Funding anticipated at $130,000 per year. This will allow a 2nd Professional Engineer to be retained in addition to a Lead Engineer and Technician. This 'accelerated' engineering previously was funded with BWSR Challenge Grants, and an EPA319 grant with corresponding BWSR CWF Matching Grant to handle the high workload associated with the large number of BWSR feedlot cost-share projects approved in South East Minnesota.
This project will extend two Feedlot Technical positions initially created and funded by a FY2011 CWF Feedlot Water Quality Grant that assess and help fix animal waste runoff from small feedlots. The technicians will work with and under the Technical Authority and priorities of the South East Soil and Water Conservation District Tech Support JPB lead Engineer. This project will enable more projects to be constructed resulting in a reduction of nitrogen, phosphorus and fecal coliform runoff into surface and ground water in South East Minnesota and the Mississippi River.
The proposal was to accelerate the protection of 1,220 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting. Over the course of the appropriation, we acquired 11 parcels for a total of 1,484.05 acres which exceeded our total acre goal of 1,220 acres by 264.05 acres. Breaking down acres by ecological section we acquired 876 acres in the metro, 152 acres in the forest/prairie, and 456 acres in the prairie. We have a balance of $52,798 that will be returned to the Fund despite exceeding our acre goals.
This proposal will address a backlog of shallow lake and wetland habitat work that will otherwise go unfunded. These projects will address work called for in the Minnesota Prairie Conservation Plan, Long Range Duck Recovery Plan, and Shallow Lakes plan.
We propose restoration and enhancement of prairie and savanna on WMA’s, SNA’s, and Native Prairie Banks in Minnesota and restoration and enhancement of bluff prairies on State Forest Land in southeast Minnesota.
CMSM opened its new permanent site with increased capacity to serve as an informal learning center that playfully engages children, families, and school groups in interactive experiences with the art and cultural heritage of southern Minnesota. With its current appropriation, CMSM is poised to strengthen its core as an institution that promotes arts and cultural heritage learning through continued
CMSM will build upon the work that began with its 2015-16 appropriation by (1) Remediation and further development of exhibit areas that promote Arts & Cultural Heritage (ACH) learning (2) Expanding ACH learning opportunities for new audiences at off-site locations; (3) Engaging an outside Evaluation Consultant to help plan/implement strategies that meaningfully assess ACH learning outcomes and impacts; (4) Boosting the Museum’s capacity to serve more school/early learning groups.
As Minnesota’s state Zoo, we are committed to ensuring that our programs are accessible to all our citizens – regardless of age, geographic location, disability or background. “Zoo Unlimited” is our community outreach and access initiative that unites a wide range of programs and policies designed to ensure every Minnesotan has unlimited opportunities to form stronger connections with the natural world. Legacy funds help us implement this program bridge barriers that keep people from connecting with all the Zoo has to offer.
Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.