This project will, over a 27 month period, fund a 0.75 Full Time Equivalent Conservation Planning Specialist position to update approximately 400 United States Department of Agriculture Highly Erodable Lands conservation plans on 40,000 acres in high priority areas within the Root River watershed. Currently, only 5% of the USDA conservation plans -approximately 40 per year - are being checked for compliance, and this project will increase that number to 150 or more per year.
We will characterize environmental drivers contributing to the decline of wild rice using lake sediment cores to reconstruct historical wild rice abundance in relation to lake and watershed stressors.
The Redeye River watershed is conducting the second intensive watershed assessment. The water quality in the watershed is still pretty healthy, but the streams with poor water quality identified previously are still not meeting water quality standards. The goal during this cycle is to better identify problem areas so that parcel specific implementation can occur to achieve improved water quality. The best method available to better target implementation is through culvert inventories, visual and desktop surveys, as well as outreach.
Watershed based implementation funds will be used to target conservation practices utilizing the principles associated with Prioritize, Target and Measure as referenced in our Local Comprehensive Watershed Management Plan. The following are projects/practices, and their associated pollution reduction estimates, that are included in this budget request: (500 acres of Nonstructural BMPs) to protect/improve land management and reduce bacteria will reduce phosphorus by 65 lbs/yr, nitrogen by 520 lbs/yr, and sediment by 285 tons/yr.
Water quality and flood damage reduction goals can't be accomplished without reducing flows and taking a targeted approach to the upper most reaches of the most critical waterways. Water and sediment control basins are eartern structures that retain water and have been identified as one of the best tool for measured success in reducing peak flows. For this project, basins will be targeted and implemented in the Upper Cedar River Watershed, specifically in the Dobbins Creek Watershed.
With a population of 162,000 that expands by approximately 300,000 annually through tourism, the Brainerd Lakes area is truly a beloved “up north” destination in Minnesota. Brainerd’s emerging Region 5 Children’s Museum (working title) envisions a more connected Minnesota and will actively bring together people from diverse backgrounds in shared experiences through the exploration of northern Minnesota’s rich art, culture, and heritage.
Project will mitigate the effects of climate change by restoring water retentive capabilities to 7 acres on the Long Prairie River while also creating both recreational and educational opportunities.
Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 25 easements have been recorded for a total of 672.1 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 1,152.4 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
Under the CREP partnership with USDA, 28 easements were recorded on a total of 2,390 acres to restore previously drained wetlands and adjacent uplands. Two easements are RIM wetland easements that were required to complete wetland restoration work on an adjacent easement secured with 2018 Wetlands funding. The landowners received the RIM-Only payment rate. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for landowner payments and conservation practices.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 84 easements have been recorded for a total of 1,441 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 2,793.2 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
This continuation of the Reinvest in Minnesota (RIM) Reserve buffers program will protect and restore riparian areas, permanently protecting approximately 600 acres on 17 easements. This program will continue utilizing a science-based ranking and selection process and be implemented locally, working with Soil and Water Conservation District (SWCD) staff in targeted areas in the state. Historically, buffer funding was used to expand basic water quality buffers into larger buffers.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase V protected and restored 2,041 acres of previously drained wetlands and adjacent native grasslands on 23 conservation easements. All easements have been recorded. $35,000 of funds from other sources were also used.
We propose identifying hot spots of groundwater chloride pollution of surface waters due to excessive road salt use, which is a long term source increasing chloride impairment of surface waters.