Develop second swimming quarry to relieve pressure on existing swimming quarry. Construct T-dock access platform, a cantilevered access platform, informational and safety signage, restroom, picnic shelter and landscaping.
Acquire approximately 39.5 acres adjacent to the existing 643-acre Quarry Park and Nature Preserve and the DNR's 300-acre Quarry Park SNA. This key acquisition will open up a southern entrance serving the rapidly expanding St. Cloud metro area.
We will characterize environmental drivers contributing to the decline of wild rice using lake sediment cores to reconstruct historical wild rice abundance in relation to lake and watershed stressors.
The Redeye River watershed is conducting the second intensive watershed assessment. The water quality in the watershed is still pretty healthy, but the streams with poor water quality identified previously are still not meeting water quality standards. The goal during this cycle is to better identify problem areas so that parcel specific implementation can occur to achieve improved water quality. The best method available to better target implementation is through culvert inventories, visual and desktop surveys, as well as outreach.
Watershed based implementation funds will be used to target conservation practices utilizing the principles associated with Prioritize, Target and Measure as referenced in our Local Comprehensive Watershed Management Plan. The following are projects/practices, and their associated pollution reduction estimates, that are included in this budget request: (500 acres of Nonstructural BMPs) to protect/improve land management and reduce bacteria will reduce phosphorus by 65 lbs/yr, nitrogen by 520 lbs/yr, and sediment by 285 tons/yr.
The College of Saint Benedict and Saint John's University (CSB+SJU), in partnership with the University of Minnesota Morris (UMM), will collect and analyze archival records and oral testimonies on Native American boarding schools in order to develop educational materials that promote truth and healing. The project includes: 1) archival research; 2) oral testimonies; 3) developing curricular materials from these archival and oral records.
With a population of 162,000 that expands by approximately 300,000 annually through tourism, the Brainerd Lakes area is truly a beloved “up north” destination in Minnesota. Brainerd’s emerging Region 5 Children’s Museum (working title) envisions a more connected Minnesota and will actively bring together people from diverse backgrounds in shared experiences through the exploration of northern Minnesota’s rich art, culture, and heritage.
To hire qualified professionals to rebuild the chancel wall in the Episcopal Church of the Good Samaritan, listed in the National Register of Historic Places.
In the North Fork Crow River Watershed, land use is mainly row crop agriculture with an extensive drainage system. Many of the existing tile lines have open intakes that transport sediment and nutrients to open ditches that drain to the North Fork Crow River. The river flows into Rice Lake which has elevated phosphorus levels. Studies show a major source of phosphorus loading comes from animal manure. Field applied manure has potential to runoff to open tile intakes being a direct path to surface water.
Project will mitigate the effects of climate change by restoring water retentive capabilities to 7 acres on the Long Prairie River while also creating both recreational and educational opportunities.
Rice Lake, in Stearns County, is an impaired water for nutrients that has a Total Maximum Daily Load (TMDL) Implementation plan developed. Rice Lake is one of the larger lakes in the county, offering major water recreation opportunities, economic benefits as well as fish and wildlife habitat. It is a priority for Stearns County to implement projects that have positive impacts on this resource.
Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 25 easements have been recorded for a total of 672.1 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 1,152.4 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
Under the CREP partnership with USDA, 28 easements were recorded on a total of 2,390 acres to restore previously drained wetlands and adjacent uplands. Two easements are RIM wetland easements that were required to complete wetland restoration work on an adjacent easement secured with 2018 Wetlands funding. The landowners received the RIM-Only payment rate. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for landowner payments and conservation practices.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase V protected and restored 2,041 acres of previously drained wetlands and adjacent native grasslands on 23 conservation easements. All easements have been recorded. $35,000 of funds from other sources were also used.
Develop outdoor recreation facilities including a nature study/observation area, roads and trails, information boards and signs. Park includes shoreline adjacent to the Mississippi Wild & Scenic River. The new trails will provide safety and accessibility along the bluff line overlooking the river and prevent erosion caused by existing, informal earthen trails.
To hire a consultant to complete a publicly available, digital-audio tour of the city's historically significant Mississippi River built environment based on recommendations in a Community Education and Marketing Plan.