To construct a multi-purpose building for music, theater, entertainment, and artistic demonstrations. The structure will be designed to enhance the quality of sound and the visibility of the artists who perform on stage for the audience.
To enhance the arts and cultural heritage programming at the Brown County Free Fair by installing a sound system to amplify performances and demonstrations.
Sound system was used for several events which included, but not limited to, two children's puppet shows, Mexican folk dancing, German singers and dancers, Native American singers and dancers, Norwegian dancers and a lefse making demonstration, lace making demonstration, presentation on the MN River preservation and history, and folk singing and fiddle music.
This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.
Based on the Minnesota Waters Lake and River Association database, Crow Wing County has the highest number of lake associations in Minnesota. Currently, there are over 136 lake association groups in the county, which does not include neighborhood, resort or religious groups. These lakes aer a cornerstone to the state's tourism econmy and there is a great demand for stormwater management incentive program to protect these local water resources.
To fabricate and install an exhibit based on considerable research and consultation with numerous stakeholders about the U.S.-Dakota War of 1862 for the 150th observance in August 2012.
Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 13 local governments with funds to complete 143 projects. More information is available in the detail reports below.
This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.