The goal of the project is the development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL.
The goal of this project is to complete a two-year data set for physical, bacterial, and water chemistry sampling for the Intensive Watershed Monitoring Plan to aid MPCA’s assessment of the aquatic health of the Mississippi Headwaters(HUC 07010101) Watershed.
This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.
This project will monitor six sites within the Minnesota River Basin: Hawk Creek near Maynard, Hawk Creek near Granite Falls, Beaver Creek near Beaver Falls, Yellow Medicine River near Granite Falls, Yellow Medicine River near Hanley Falls, and Spring Creek near Hanley Falls. The sites will be monitored according to MPCA’s Major Watershed Load Monitoring (WPLMN) Standard Operating Procedure, which is the procedure being followed for sites currently monitored by the Hawk Creek Watershed Project (HCWP).
The MPCA has identified 13 stream sites in the watershed to characterize watershed water quality. This project will supplement and complement the identification of the top 50 sites in the watershed that are contributing to water impairment and also help in identification of priority watersheds in the re-write of the watershed comprehensive plan. Water samples and field measurements will be collected at each monitoring location ranging from baseline events to high flow events.
This project will fully fund three Nonpoint Engineering Assistance (NPEA) Joint Powers Board positions in cooperation with the NPEA Base Funding anticipated at $130,000 per year. This will allow a 2nd Professional Engineer to be retained in addition to a Lead Engineer and Technician. This 'accelerated' engineering previously was funded with BWSR Challenge Grants, and an EPA319 grant with corresponding BWSR CWF Matching Grant to handle the high workload associated with the large number of BWSR feedlot cost-share projects approved in South East Minnesota.
This project will extend two Feedlot Technical positions initially created and funded by a FY2011 CWF Feedlot Water Quality Grant that assess and help fix animal waste runoff from small feedlots. The technicians will work with and under the Technical Authority and priorities of the South East Soil and Water Conservation District Tech Support JPB lead Engineer. This project will enable more projects to be constructed resulting in a reduction of nitrogen, phosphorus and fecal coliform runoff into surface and ground water in South East Minnesota and the Mississippi River.
The program accelerated the protection of 550 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting.
The table below provides a short summary of the acres and sites accomplished. We enhanced or restored 59,495 acres in 458 separate habitat projects.Project Type # Sites # AcresFencing for conserv grazing 6 721grassland conversion 33 1,124Invasive Species Control 43 1,599mowing 3 104Prescribed burn 214 48,368Restoration 13 123Woody Removal 146 7,457
This proposal impacts shallow lakes and wetlands in Minnesota through the design and construction of projects, enhancement work done by DNR roving habitat crews, and shallow lakes work identified and initiated through the DNR Shallow Lakes program. Ten thousand acres of wetlands were enhanced by these activities.
Water control structures and dikes were designed and constructed on six Wildlife Management Areas (WMA) in the counties of Becker, Clearwater, Itasca, Lincoln, Roseau, and Yellow Medicine. Dike work at Roseau River WMA protects and enhances 3200 acres of wetlands wetlands in Pool 2 of the WMA. Roseau River WMA has 10 large water control structures, seven moist soil cells, and four large pools covering 11,800 acres. Cells for a moist soil unit were constructed at Lac Qui Parle WMA in Lac Qui Parle County.
We protected 22.3 miles of trout streams and 1.3 miles of lakeshore via easements (585 acres in total), and 7.4 miles (504 acres) of lakeshore through fee-title purchase. We enhanced shoreline habitat on 524 acres of riparian land, and instream habitat on 3.1 miles of trout streams and 0.5 miles of warmwater rivers.
This appropriation funded 283 projects totaling 21,953 acres. The two largest types of enhancement were 112 woody removal projects totaling 10,160 acres and 134 prescribed burns totaling 10,082 acres. Additionally, we seeded 30 sites totaling 1386 acres, put in infrastructure for conservation grazing of 236 acres on 3 sites, conducted 3 oak savanna enhancements totaling 42 acres, and treated 47 acres of invasive species on 2 sites.
This program of on-the-ground conservation projects increased the wildlife and ecological values of forest communities on Minnesota's public forestlands. Restoration and enhancement projects in this program enhanced more than 10,000 acres of forest.