To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
The City of Myrtle is an unsewered community in Freeborn County. Thirty-one of thirty-two properties are connected to a community straight pipe, which discharges raw sewage into Deer Creek, a tributary of the Cedar River and are classified as an imminent threat to public health (ITPHS). This project will provide cost-share assistance to 28 low income property owners, who are connected to the City of Myrtle community straight pipe, for construction of individual subsurface sewage treatment systems.
This project will accelerate production of County Geologic Atlases (part A). An atlas is a set of geologic maps and associated databases for a county that facilitate informed management of natural resources, especially water and minerals.
The Stearns County Soil and Water Conservation District will hire an Accelerated Water Quality Technician to focus on projects in the Middle Sauk area showing the greatest pollution reductions. After identifying and prioritizing targeted sites with the highest pollution potential, the Stearns County SWCD will begin surveys and designs and complete them in a timely fashion while current implementation funds are available. The accelerated survey and design in Stearns County will relieve our natural resources of the current strain put on them by the environment and land use.
Many of Minnesota's wetlands have been lost and the remainder degraded. Recent tiling and ditching have accelerated this situation. Through this program, shallow lakes and wetlands were designed, constructed, and intensively managed to benefit wetland wildlife and Minnesota residents. Habitat accomplishments from this proposal have enhanced 19,365 acres of wetlands and shallow lakes to benefit waterfowl and wetland wildlife. Work was accomplish through constructed infrastructure, cattail control, and a significant prescribed wetland burn.
The goal of this program was to accelerate the protection of 887 acres as Waterfowl Production Area's. Pheasants Forever successfully protected eight parcels totaling 1,554.39 acres of prairie wetland and grasslands providing excellent habitat for numerous wildlife.
In total, we under spent on our budget, over delivered on acre goals, and over delivered on match leverage received.
Reinvest In Minnesota (RIM) and Native Prairie Bank (NPB) coordinated to accelerate grassland protection efforts. Through this appropriation a total of 1,584 acres were protected. This included 604 RIM acres and 980 NPB acres. Easement acquisition focused on Minnesota Prairie Conservation Plan identified landscapes.
The Albert Lea Lake Management project replaced the previous Albert Lea Lake fix-crest dam with a 3-in-1 structure that included a rock riffle dam, a lake level management structure, and an electric fish barrier. The benefits from this project include improved aquatic and waterfowl habitat, invasive species management, and improved desirable fish populations.
The Anoka Sand Plain Partnership restored / enhanced 3,714 acres of priority prairie, savanna, forest, wetland, and shoreline habitat on public lands and waters within the Anoka Sand Plain EcoRegion within the Metropolitan Urbanizing, Forest-Prairie, and Northern Forest regions. Total R/E acreage achieved over the course of the appropriation is 126% of our stated acreage goals, and was accomplished through a robust partnership of four direct recipients improving a total of 16 priority sites including WMAs, state forest, national wildlife refuges, city and county lands.