We protected 22.3 miles of trout streams and 1.3 miles of lakeshore via easements (585 acres in total), and 7.4 miles (504 acres) of lakeshore through fee-title purchase. We enhanced shoreline habitat on 524 acres of riparian land, and instream habitat on 3.1 miles of trout streams and 0.5 miles of warmwater rivers.
This appropriation funded 283 projects totaling 21,953 acres. The two largest types of enhancement were 112 woody removal projects totaling 10,160 acres and 134 prescribed burns totaling 10,082 acres. Additionally, we seeded 30 sites totaling 1386 acres, put in infrastructure for conservation grazing of 236 acres on 3 sites, conducted 3 oak savanna enhancements totaling 42 acres, and treated 47 acres of invasive species on 2 sites.
This program accelerated the permanent protection of 2,267 acres of wetlands (465 acres) and grasslands (1,802 acres) as Waterfowl Production Areas open to public hunting in Minnesota. Over the course of the appropriation, PF acquired 18 parcels for a total of 2,267 acres which exceeded our total acre goal of 2,250 acres by 17 acres. Breaking down acres by ecological section we exceeded our acre goal for both the metropolitan area by 61 acres and in the prairie area by 346 acres. We have exceeded anticipated match of $5,125,000 by $771,500.
To offer free arts activities for children, host fine arts demonstrations, and create a space for teenagers to attend music shows at the Watonwan County Fair.
This project will continue to develop, and calibrate/validate the hydrology of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.
Multiple water courses in the Buffalo River - Red River Watershed District are impaired for turbidity. These waterways include the Red River of the North, Wolverton Creek, Deerhorn Creek, Stoney Creek, South Branch Buffalo River, and the main stem of the Buffalo River. This project will provide a means of prioritizing areas of the watershed to implement conservation practices to reduce overland runoff contaminant loadings contributing to water quality impairments.
This project entailed a number of small individual improvements to the park made over a 3 year period, including constructing a drinking fountain with an accessible sidewalk at the beach in Buffalo River State Park, repairing a broken water line, rebuilding the main park entrance sign, purchasing sand to stem the flooding of nearby Buffalo R into the beach area, purchasing accessible fire rings, and purchase of new park signs.
This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.