To create a history mural at the Sherburne County Fair. The fair will collected photographs, dating back to the early day of the fair, to then be added to a mural by a commissioned artist.
To improve fair visitor access to performing arts at the Sherburne County Fair by installing stage lighting, making the seating area handicap accessible, and building a dressing and changing room for performers.
Over a century ago, the construction of Judicial Ditch No. 3 resulted in the rerouting of the South Branch of the Buffalo River, completely changing its flow characteristics. In the first phase of this multi-phase project, the Buffalo-Red River Watershed District (BRRWD) in partnership with landowners, federal, state, and local agencies, will put much of the rerouted channel back restoring up to 4.6 miles of the South Branch with up to 100 acres of associated riparian habitat corridor.
In the early 1900s, a joint State and County drainage project constructed a 1 mile outlet channel to Grand Marais Creek to provide a shorter outlet to the Red River and effectively abandoned the lower 6 miles of the natural channel. In recent times, the ditch has eroded from its original shape to a channel of steep gradients and unstable banks. This has resulted in head cutting of the channel and nearly continuous channel erosion and bank sloughing with the effect of depositing up to an estimated annual average of 700 tons of sediment into the Red River.
The Terrace grist mill was built in 1903. In 1967, the mill was abandoned. In 1979, the non-profit Terrace Mill Foundation was incorporated, purchased the mill and began a 30 year commitment to restoring and maintaining the mill and property.
The Foundation is managed by a volunteer board of directors. Today, the three story mill contains a circa 1900 general store, museum of mill artifacts, gift shop, historic media center, Pioneer Playhouse Theater and Wheeler Art Gallery. In July, 1979, the Terrace Mill District was placed on the National Registry of Historic Places.
Directly restore six miles of stream habitat, the hydrologic conditions needed to support 400 acres of habitat corridor, and effectively reconnect more than 20 miles of the Grand Marais Creek.