Establish network of automated radiotelemetry stations to monitor bird migration and local movements of a threatened species, and develop strategic plans for long-term use of infrastructure to monitor animal movement.
We will quantify and map antibiotic and antibiotic resistance gene contamination in Minnesota waters and soils and identify locations in need of mitigation to protect environmental, human, and animal health.
Phase 2 of the Marsh River Watershed Restoration and Protection Strategy (WRAPS) project includes: continued civic engagement; production of the Total Maximum Daily Load (TMDL) study, which allocates pollutant load reductions for impaired waters; and production of the WRAPS report, which identifies implementation strategies that will maintain or improve water quality in many lakes and streams throughout the watershed.
This project is a partnership between several organizations to restore diverse prairie and wetland habitat in areas adjacent to existing DNR Wildlife Management Areas. Parcels are identified by working with the representatives of local government, Windom Area DNR, Ducks Unlimited (DU), The Conservation Fund (TCF), and the Fox Lake Conservation League. Wetland restoration and additional grasslands are needed to make our WMA's sustainable.
Prepare a master plan amendment for Battle Creek Regional Park, Rice Creek North Regional Trail, and develop a master plan for Lexington Avenue Regional Trail including design/engineering, community engagement to identify improvements for existing elements such as buildings, roads, parking, creeks, ponds, lakes, wetlands, trails, animal exercise, amenities, turf games, landscaping, utilities, stormwater management, restoration, signage, gathering nodes, fitness/play elements, land acquisition.
Prepare a master plan amendment for Battle Creek Regional Park, Rice Creek North Regional Trail, and develop a master plan for Lexington Avenue Regional Trail including design/engineering, community engagement to identify improvements for existing elements such as buildings, roads, parking, creeks, ponds, lakes, wetlands, trails, animal exercise, amenities, turf games, landscaping, utilities, stormwater management, restoration, signage, gathering nodes, fitness/play elements, land acquisition.
Through this project, the function and water quality of County Ditch Number 11 (CD #11) will be improved, contributing toward water quality improvements in Winsted Lake. This will be done by implementing 10 grade stabilization structures, 4 water and sediment control basins, and 1 grassed waterway throughout the drainage systems watershed. By completing this project a sediment will be reduced by 108 tons per year, and total phosphorus will be reduced by 124 pounds per year.
Using the best science and biological data available, this project will protect sites that the DNR and has identified as high priority habitat acquisitions that are vital to support specific wildlife targets in the Metro Section Planning region. The Conservation Fund (TCF) will proactively contact and negotiate land protection with willing landowners in these complexes in coordination with DNR and local conservation groups and local communities to maximize wildlife populations of statewide and local importance.
It is critical to train new staff, create modeling protocols for new BMPs, refine and calibrate models, and test ever-advancing modeling applications. The Metro Conservation District?s (MCD) Sub-Watershed Analysis (SWA) program provides these capacity-building services and unites efforts across 11 SWCDs. MCD proposes to analyze an additional 15 subwatersheds. The analyses will identify the location and estimated cost/benefit relationship for BMPs, evolve with new technology, and share discoveries metro-wide.
This project will establish a groundwater monitoring network in the 11 county metropolitan area. The network will provide information about aquifer characteristics and natural water trends by monitoring healthy aquifers (non-stressed systems). The project will also develop an automated system that captures groundwater level and water use data. This system will enhance evaluation of changes in aquifers that are stressed by pumping from existing wells.
Metro Big Rivers successfully completed work with the Phase 8 / ML2018 OHF appropriation, exceeding amended acreage goals by 16% and completing work on 701 acres. Partners protected 87 acres through fee title acquisition and 199 acres through permanent conservation easement, restored 6 acres and enhanced 409 acres.
MBR 8 expended 97% of the OHF funds granted and leveraged the grant by 60% with over $1.5 million in other funds and landowner donation of easement value.
The Minnesota Pollution Control Agency’s (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) forms the core of a long-term program designed to measure and compare regional differences and trends in pollutant loadings from Minnesota’s mainstem rivers and the outlets of major watersheds and subwatersheds draining to these rivers.
Minnesota's twelve regional library systems, which encompass more than 350 public libraries in all areas of the state, can benefit from a portion of the Legacy Amendment's Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional library system is eligible to receive a formula-driven allocation from the annual $2.5 million Minnesota Regional Library System Legacy Grant. Metropolitan Library Service Agency (MELSA) is a federated regional public library system in the Twin Cities Metro Area in central Minnesota.
This project will reduce sediment and nutrient loading by 141 tons of sediment and 120 pounds of phosphorus annually while improving in-stream and riparian habitat by restoring a 2/3-mile corridor of Middle Sand Creek. This project expands upon the Lower Sand Creek Corridor Restoration project funded in part by a FY18 CWF grant and results in the restoration of over a mile of contiguous stream corridor.
This project is to update stormwater harvest/reuse best management practices (BMPs) in the Minimal Impact Design Standards (MIDS) calculator. The update will also allow the calculator to utilize Excel files from previous of the tool.
The Minneapolis American Indian Center has developed a long term plan to increase accessibility to and interest in Native language instruction through increased access to Dakota and Ojibwe language tables, monthly family nights, field trips and other cultural activities.
The Minneapolis American Indian Center has developed a long term plan to increase accessibility to and interest in Native language instruction through increased access to Dakota and Ojibwe language tables, monthly family nights, field trips and other cultural activities.