Middle Sand Creek Corridor Restoration
This project will reduce sediment and nutrient loading by 141 tons of sediment and 120 pounds of phosphorus annually while improving in-stream and riparian habitat by restoring a 2/3-mile corridor of Middle Sand Creek. This project expands upon the Lower Sand Creek Corridor Restoration project funded in part by a FY18 CWF grant and results in the restoration of over a mile of contiguous stream corridor.
Projects and Practices 2019
Annie Felix-Gerth
for grants to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of these funds may be used to seek administrative efficiencies through shared resources by multiple local governmental units.
Annual pollutant load reductions of 144 tons of total suspended solids and 120 lbs of total phosphorus. Improved habitat and biological integrity as measured by increased MPCA Stream Habitat Assessment scores and macroinvertebrate & fish IBI scores.
This project has resulted in an estimated annual reduction of 120 pounds of Phosphorus, 141 tons of Sediment.
LOCAL LEVERAGED FUNDS