There are two main goals of this Cedar Basin HSPF project,
A. Overall development of the HSPF model in the Cedar Basin of Minnesota; and
B. Shell Rock River nutrient, DO , impairment modeling and TMDL completion.
In 2010, Legislation allocated Clean Water Fund (CWF) dollars to the Anoka Conservation District to initiate an 11 county metro subwatershed assessment program. The purpose of subwatershed assessments is to improve water quality, increase groundwater recharge and reduce runoff volumes. These goals are achieved by identifying opportunities in the subwatersheds most contributing to the degradation of the high priority water bodies and developing designs for Best Management Practices (BMPs) that treat stormwater runoff.
This project will characterize unregulated drinking water contaminants at wells and intakes (which pump from groundwater, lakes, rivers), and to examine if they persist after standard public water system treatment.
Design of internal pathways to park facilities located between Cherokee Heights Blvd. and Chippewa Ave. Project includes internal design services, consultant and engineering fees, surveying, and soil analysis.
Design of internal pathways to park facilities located between Cherokee Heights Blvd. and Chippewa Ave. Project includes internal design services, consultant and engineering fees, surveying, and soil analysis.
The purpose of this project is to create a shared plan for the Watershed Restoration and Protection Strategy (WRAPS) process with roles, responsibilities, commitments and deliverables clearly understood by all (Minnesota Pollution Control Agency (MPCA), Chippewa River Watershed, and local partners). The MPCA and the Chippewa River Watershed Project (CRWP) will be working together to ascertain the level of involvement that local units of government and other partners want to engage in for the second round of the WRAPS process.
The Chippewa River Watershed Project (CRWP) will work with the Minnesot Pollution Control Agency (MPCA) to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed to aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. Our goal is to collect quality data and complete load calculations for five sites using the MPCA's Watershed Pollutant Load Monitoring Network (WPLMN) established protocols.
This project is for Cycle 2 of the Intensive Watershed Monitoring (IWM) process for the Lower St. Croix Watershed. Seven stream sites will be monitored by the Isanti Soil and Water Conservation District (SWCD), Anoka Conservation District, and Chisago SWCD. Sampling will be conducted in 2019 and 2020 and Chemistry and field observation data will be taken.
This project will create a new chloride source assessment model and generate the best management practice (BMP) information and needed water softening data for the Smart Salting Assessment tool, which will allow Minnesota communities to fully evaluate their specific sources and magnitude of chloride and develop a community specific chloride reduction plan.
To hire a qualified architect to conduct a conditions assessment of the Church of St. Rose of Lima (Kenyon), listed in the National Register of Historic Places.
This project aims to reduce pollutant loading to Mille Lacs Lake by working with the City of Wahkon to develop a comprehensive stormwater management plan for the City of Wahkon, located on the south side of the lake. Wahkon has no stormwater facilities and pollutant laden runoff flows into Mille Lacs Lake, untreated. This project will delineate and model stormwater flow in the City of Wahkon watershed, prioritize and target BMPs in the city watershed and conduct outreach to keep all stakeholders informed and build buy-in for future project implementation.
The City of Minnetonka and its residents highly value the water resources within the community, which include approximately ten lakes, four streams, and hundreds of wetlands. The City has been progressive in protecting these resources through policies and management strategies, and now wants to increase their on-the-ground efforts in protecting and improving water quality. The City hopes to conduct targeted watershed assessments for fourteen selected priority water bodies to identify and optimize the type and locations of Best Management Practices (BMPs) to be installed.
Duluth area streams received over 10 inches of rainfall on June 19 and June 20, 2012. This "500 year event" provides a once in a lifetime opportunity to further understand sediment movement and stream channel alterations due to an event of this magnitude.
The Minnesota Historical Society is administering grants to organizations to support civics education programs for Minnesota's youth. Civics education provides students with an understanding of the democratic foundation of our national, state, and local government and constitutional principles. Programs run by Kids Voting St. Paul, the Learning Law and Democracy Foundation, and the YMCA has been funded with this money.
The mission of the Minnesota Civil War Commemoration Task Force is to promote and share the rich history of the American Civil War and Minnesota's connection to it. With support from the Legacy Amendment's Arts and Cultural Heritage Fund, the task force oversees the development of statewide, balanced activities commemorating the Sesquicentennial of the American Civil War and Minnesota's involvement in it and the U.S.-Dakota War of 1862.
The goals of the program are to evaluate the effectiveness of agricultural conservation practices, identify underlying processes that affect water quality, and develop technologies to target critical areas of the landscape. Funded projects provide current and accurate scientific data on the environmental impacts of agricultural practices and help to develop or revise agricultural practices that reduce environmental impacts while maintaining farm profitability.
The City of Forest Lake will install four biofiltration basins and a wet sedimentation pond to treat stormwater prior to discharge into Clear Lake. Clear Lake is identified as a priority lake within the Rice Creek Watershed District's (RCWD) Watershed Management Plan and does not meet the nutrient goals established by the RCWD. Mid-summer algae blooms are common and occasionally severe enough to impact recreation.
This project will produce a final Total Maximum Daily Load (TMDL) study and Watershed Restoration and Protection Strategy (WRAPS) report that will be utilized by local government units for water planning purposes during the Board of Water and Soil Resources One Water One Plan process for the Clearwater River Watershed.
The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.
This project is to develop a watershed restoration and protection strategies report that provides quantitative pollutant source estimates and a set of pollutant reduction and watershed management strategies to protect and achieve water quality standards for all aquatic life and aquatic recreation impairments in the watershed. The strategies will be understood and adoptable by local units of government and other stakeholders. New understandings and new relationships will inform and lead to eventual environmental improvements.
The Q-Lot at St. Cloud State University (SCSU) is an 8 acre (1,000 spaces) gravel and asphalt parking lot. The parking lot's surface is impervious, which means it doesn't allow for rainfall or snow melt to soak into the ground. Instead, the water runs off directly into storm sewers, taking with it sediment, bacteria, automotive fluids and other pollutants which flow straight into the Mississippi River. SCSU staff has frequently witnessed plumes of sediment the color of chocolate milk where the storm sewer discharges into the river.
The St. Cloud Waste Water Treatment Facility (SCWWTF) is currently conducting long term planning for future biosolids management. The most likely path forward includes dewatering of the digested biosolids, which will produce a supernatant stream with significant phosphorus and ammonia loads that would be returned to the liquids treatment portion of the WWTF. Returning these nutrient loads to the liquids train would result in increases to effluent concentrations, increases in power consumption, or both.