To research and share knowledge among diverse partners around Anishnaabe cultural practices and their ecological legacies in fire-dependent pine forests.
To stabilize structural elements on the Pattern Shop, a contributing building in the St. Paul, Minneapolis, and Manitoba Railway Company Shops Historic District listed in the National Register of Historic Places, and now used as a social services facility.
Hardwood Creek Regional Trail. Complete paving and other improvements to Hardwood Creek Regional Trail, which may include new trail sections toward Bald Eagle Regional Park.
There are 3 million acres of peatland forests in Minnesota. This proposal will identify management actions that maximize ecosystem benefits of peatland forests, including wildlife, water, timber, and native plants.
Construction was completed in 2018 on the three components that made up the major infrastructure project at Pelican Lake - construction of a gravity outlet, water control structure, and pump lift station. This work will allow for a drawdown and enhancement of Pelican Lake to return it to what was once one of the region's premier waterfowl and wetland wildlife habitats. Ducks Unlimited provided the engineering and construction oversight of this significant project.
Wood Environment & Infrastructure Solutions, Inc. (Wood) was selected for this project to conduct work in support of the per- and polyfluoroalkyl substances (PFAS) program. This project is a multi-phased pilot study to further validate and refine potential locations across Minnesota that may have historically been, or are currently, contaminated with PFAS. The primary objective is to evaluate potential PFAS locations, specifically compost sites, to determine presence or absence of PFAS at each site.
The Perpich Arts Integration Network of Teachers (PAINT) fosters collaborative arts integration in Minnesota through K-12 teacher professional development and funding to schools. With Perpich Center facilitation, teacher teams develop and implement arts-integrated lessons and units. PAINT program components include:
The purpose of the Minnesota Department of Agriculture's monitoring activities is to determine the presence and concentration of pesticides in Minnesota's groundwater and surface water. Monitoring information is used to characterize and assess the extent of pesticide impacts to Minnesota's water resources.
Phased design and construction of ADA access deficiencies throughout the Regional Park and Trail System that are identified in the Ramsey County Parks and Trails ADA Transition Plan including Design/engineering, for building and site improvements such as access improvements for walkways, hardware components, doors, window, restroom components, building interiors, utilities, stair and railings, sidewalk, trail, shelters, play elements, parking lots, grading, signs and site amenities
This project will fund the stream restoration of a failed, 30-year old sediment control structure in the Deer Creek subwatershed using natural channel design methods to restore the stream to a stable state. Since the dam breached an estimated 78 tons of sediment is transported annually to the turbidity-impaired Deer Creek.
Increases in crop prices have reduced the acreage of land in conservation set-aside programs such as the Conservation Reserve Program and other marginal land use. Significant conversion of grasslands to cultivated agricultural crops has increased the levels of runoff and sedimentation. Phase III of this project addresses the need to protect vulnerable sites by installing water and sediment basins. These basins are earthen embankments built to temporarily detain sediment-laden runoff, allowing sediment to settle out before runoff is discharged.
To contractor will develop materials on the topic of phosphorus retention by bioretention media components. Information from the deliverables will be incorporated into the Minnesota Stormwater Manual, with the goal of providing information to MS4 permittees to facilitate compliance with Total Maximum Daily Load (TMDL) requirements in stormwater permits.
A pilot program of wastewater treatment optimization without costly facility upgrades. This will lead to cleaner lakes and rivers without needless costs, and achieve significantly better treatment results.