This project is a cooperative initiative between the Prior Lake Spring Lake Watershed District, the City of Prior Lake, and the Scott Soil and Water Conservation District to implement on-the-ground Best Management Practices (BMPs) that will protect and improve water quality in Spring, Upper Prior and Lower Prior Lakes, water resources of local, regional, and state significance. Spring and Upper Prior Lakes are both impaired and have a completed Total Maximum Daily Load and Implementation Plan.
Regional public projects that are the focus of the proposed project include: Infiltration areas and a sedimentation pond enhancement in subwatersheds N3/N4; Parking lot storm drain rain gardens and a sedimentation pond enlargement in subwatersheds N5/N6; An infiltration area and a sedimentation pond enhancement in subwatersheds S9/S11; Ditch checks along Highway 13 in subwatershed 10.
This grant application will focus on the construction of multiple targeted best management practices (BMPs) in priority areas which will provide measurable reductions in sediment and phosphorus loadings to cold water streams in the Mississippi River/Lake Pepin Watershed. The installation of these BMPs will also protect the existing stream habitat by reducing peak flows and reduced streambank erosion.
This will fund a competitive grant program for sewer projects that will help protect or restore the water quality of waters in national parks located within Minnesota.
This program will develop and implement stormwater management plans and shoreline restoration projects with community partners. Community partners for this program will include but are not limited to: non-profits, businesses, and faith organizations within the Rainy River-Baudette watershed.
The purpose of this program is to provide cost share funding to community groups for the installation of community accessible rain gardens and other water quality projects in Ramsey County. The Ramsey Conservation District (RCD) in partnership with local property owners and Watershed Districts/Water Management Organizations will install 6-12 stormwater best management projects that will help protect and improve water quality of surrounding lakes, streams, rivers, and wetlands.
The goal of the project is to create a complete Watershed Restoration and Protection Strategy (WRAPS) report for the Ramsey-Washington Metro Watershed District for inclusion into an updated Watershed Management Plan, including completion of a watershed-wide Total Maximum Daily Load (TMDL) report sufficient for EPA approval.
The objectives of this project are to collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States Geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North. Data will be published on the USGS Nation Water Information System (NWIS) website and in the USGS Annual Report.
Agency staff and local partners will gain an improved understanding of the nature of the chemical and physical attributes of the Red River of the North.
The Red Lake Watershed District will create an inspection database for 103E ditches under their drainage authority. The district will acquire a database software solution to conduct field inspections and to track ditch maintenance projects and use the software to facilitate compliance with state statutes. The project will also develop a process for completing the annual inspection and reporting requirements under Statue 103E.
The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.
The Aitkin County Soil and Water Conservation District will partner with local lake associations and other eligible community partners to reduce the impacts of storm water runoff and retain water on the land. We will implement a mini-grant program that will install rain gardens and native vegetation buffers along shorelines using deep-rooted native vegetation that will filter runoff, promote infiltration, and control stormwater runoff and soil erosion.
The goal of this project is to continue best management implementation according to the Redwood River Phase II Implementation Plan (1999) and install phosphorus and total suspended solids (TSS) reducing conservation practices that will help achieve the Lower Minnesota River dissolved oxygen Total Maximum Daily Load (TMDL), and the Minnesota River Turbidity TMDL. The proposed implementation of conservation practices include: water and sediment control basins, grassed waterways, grade stabilizations and streambank stabilizations.
The primary outcome of this project will be to work with five local landowners to implement BMPs that focus on protection of the Renville County portion of the Minnesota River- Mankato Watershed from elevated nutrient levels, in particular phosphorus. This project will utilize outreach and education to incorporate public involvement and input into targeted BMP implementation and the decision making process of watershed issues.
Capitol Region Watershed District is partnering with St. Paul Public Schools to implement a variety of highly visible Best Management Practices at Central High School that will improve the quality of stormwater discharged to the Mississippi River. A tremendous amount of sediment is discharged from the school annually due to the large impervious areas and lack of vegetation. Implementing the projects will reduce sediment by 86% and phosphorus by 90% over the target area annually.
This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Riparian Buffer Easement Program targets creating buffers on riparian lands adjacent to lakes, rivers, streams and tributaries. Through the Reinvest in Minnesota Program (RIM) and in partnership with Soil and Water Conservation Districts and private landowners, permanent conservation easements are purchased and buffers established.
The goal of this project is to perform water quality monitoring in order to accomplish MPCA’s Intensive Watershed Monitoring (IWM) plan in preparation for development of Watershed Restoration and Protection (WRAP) monitoring efforts. The monitoring sites are located in Houston, Fillmore and Mower counties in southeast Minnesota. This project will provide intensive stream monitoring for Pine Creek in the La Crescent watershed, Winnebago and Crooked Creek in the Reno watershed, Bear, Pine and the Upper Iowa in the Upper Iowa watershed.
Phase 1 of the Roseau River Watershed Restaration and Protection Strategy (WRAPS) project will focus on planning and coordination among project partners, creating a civic engagement strategic plan, holding a watershed kick-off meeting, gathering and summarizing available watershed information and data, and developing a data gap monitoring plan.
The Roseau River Watershed Assessment will include the waters of the Roseau River, Sprague Creek, Hay Creek and Hayes Lake. All of the monitoring sites, except one, are located in Roseau County, with the exception being located in Kittson County. This assessment focuses on collection of water chemistry and field parameters at one site on Hayes Lake and seven key sites on the Roseau River, which have been identified by MPCA. These sites are located in the lower reaches of each surface water system.
The goal of this project is to construct, calibrate and validate a watershed model using Hydologic Simulation Program FORTRAN (HSPF) for the Roseau River Watershed.
The Sand Hill River Watershed District along with the West Polk Soil and Water Conservation District (SWCD) will install 18 rock riffles and 2 rock arch rapids to control the grade and stabilize the channelized reach of the Sand Hill River, which contributes thousands of tons of sediment downstream. The entire Sand Hill River is currently impaired for turbidity. The total project length is five miles of channel located between the cities of Fertile and Beltrami in western Polk County.
Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health protects both public health and groundwater by assuring the proper sealing of unused wells.
Clean Water funds are being provided to well owners as a 50% cost-share assistance for sealing unused public water-supply wells.
Over the past two years, Dakota County has learned that many properties within the city do not have septic system records identifying the presence or condition of their septic system, and anecdotal evidence that some are failing. The County will use CWF Accelerated Implementation Grant dollars to inventory and inspect all septic systems within the City of Randolph. As part of the inspection, a well inventory will also be conducted. Based on a preliminary assessment, there are 105 properties that will require inspection.
Shattuck Saint Mary's, located atop of a bluff area upland of the east bank of the Straight River, encompasses a land area of 324 acres that contains over 16,426 miles of mild to extensively eroded ravines and gullies; many of which directly discharge to the Straight River. In addition to pollutant loads in runoff from the school's watershed and eroded ravines, banks and gullies, the Straight River also experiences pollutant loading from eroding stream banks in this reach; annual sediment loads average 1,962 tons per year.
The goal of this project is to leverage the existing Hydrological Simulation Program FORTRAN (HSPF) model application that has been calibrated and validated for the Shell Rock River Watershed to assist with wastewater permitting. The contractor will deliver all modeling files and a final technical memorandum outlining the scenarios developed, how the scenarios are represented in the model, and the impact these scenarios have on water quality at specified locations for parameters of concern as described below.
The purpose of this project is to create an inventory and priority list of where inlet control and buffer strips are needed along Judicial Ditch 15 to reduce the nutrients, sediment and volume of water being transported by field tile. This will help protect landowner drainage needs, while focusing on applicable best management practices that will reduce on-field and in-channel peak flow erosion. This ditch system is the headwaters to Cokato Lake, which connects to the North Fork Crow River.
The Chippewa River Watershed Project will work with local partners, such as Land Stewardship Project, soil and water conservation districts, and the Natural Resources Conservation Service, to restore water quality in Lake Gilchrist, Simon Lake, Lake Johanna and in Mud Creek, and to protect unimpaired water resources in the watershed. This will be done through implementation of Best Management Practices focusing on the reduction of phosphorous, sediment, and runoff in the landscape, primarily by increasing the landscape's ability to retain water.
The Project and Outreach Coordinator will facilitate efforts within the watershed to provide landowner support and assistance in identifying areas in need of conservation plans and best management practices. The coordinator would use the Watershed Protection and Restoration Strategy Report and county water plans to target and prioritize outreach and education to maximize water quality benefits. This will greatly multiply the number of educated landowners in the watershed and increase the number of projects implemented.
This project primarily focuses on riparian restoration (permanent vegetative buffer enhancements and plantings) on 6.5 miles (both sides) of targeted tributaries, ditches, and wetlands within five sub - watershed areas identified in the Snake River Watershed Restoration and Protection Strategy (WRAPS) Report. These plantings will consist of native perennials, trees, and shrubs where practical. In addition to the riparian plantings, this project will include fence exclusions for cattle and heavy use protections at cattle crossings in streams and ditches.
Continue and finalize watershed models using Hydrologic Simulation Program FORTRAN (HSPF) for the Grand Marais Creek and Snake River Watersheds and complete the calibration/validation process.
Minnesota Department of Health has been collaborating with cities and other community water suppliers since 1993 to develop and implement source water protection plans. Support from the Clean Water Legacy expands and accelerates the number of water suppliers that can be assisted each year in undertaking protection planning and implementation activities.
Wire the well house for the generator; Build permanent display at City Hall for informational WHP materials; Purchase sorbent kits to be used in case of a spill; Televise well #1