Redwood River Turbidity Reduction Project - Clean Water Partnership (CWP)

Project Details by Fiscal Year
2015 Fiscal Year Funding Amount
$150,512
Fund Source
Clean Water Fund
Recipient
Redwood Cottonwood Rivers Control Area
Recipient Type
Local/Regional Government
Status
Completed
Start Date
June 2015
End Date
June 2018
Activity Type
Education/Outreach/Engagement
Restoration/Enhancement
Counties Affected
Lincoln
Lyon
Murray
Redwood
Lincoln
Lyon
Murray
Redwood
Project Overview

The goal of this project is to continue best management implementation according to the Redwood River Phase II Implementation Plan (1999) and install phosphorus and total suspended solids (TSS) reducing conservation practices that will help achieve the Lower Minnesota River dissolved oxygen Total Maximum Daily Load (TMDL), and the Minnesota River Turbidity TMDL. The proposed implementation of conservation practices include: water and sediment control basins, grassed waterways, grade stabilizations and streambank stabilizations. This project will focus on improving the turbidity and phosphorus impairments of the Redwood River specifically. Ongoing monitoring will provide data on measurable results as will data from the upcoming Watershed Restoration and Protection Strategy (WRAPS) beginning in 2017.

Project Details
2015 Fiscal Year Funding Amount
$150,512
Number of full time equivalents funded
1.51
Project Manager
First Name
Kerry
Last Name
Netzke
Organization Name
Redwood Cottonwood Rivers Control Area
Street Address
1424 East College Drive Suite 300
City
Marshall
State
MN
Zip Code
56258
Phone
(507) 532-1325
Administered By
Administered by
Location

520 Lafayette Road
St. Paul, MN 55155

Phone
800-657-3864