All Projects

823 Results for
Recipient
Elm Creek WMC
2023 Fiscal Year Funding Amount
$92,774
Fund Source

Completion of priority assessments to aid in implementing future projects. Three possible assessments have been identified for further consideration. The first is a subwatershed assessment in the South Fork Rush Creek subwatershed in Corcoran, which is adjacent to the previously completed Rush Creek Headwaters SWA. This would identify mainly agricultural BMPs for implementation in partnership with Hennepin County. The second is a feasibility assessment of re-meandering the outlet of Diamond Lake to Diamond Creek, which was identified in the Diamond Creek SWA.

Hennepin
Recipient
Shingle Creek WMC
2023 Fiscal Year Funding Amount
$60,000
Fund Source

Several lakes in the Shingle Creek watershed have been designated Impaired Waters for excess nutrients, and the Watershed Commission and cities continue to undertake BMPs to reduce total phosphorus and sediment to the lakes to help improve water quality. This project is the completion of subwatershed assessments in two priority areas to identify future BMPs addressing ongoing lake nutrient impairments. The areas are the drainage area to the Gaulke/ Memory Lane/ Hagemeister Pond system tributary to Middle Twin Lake; and the drainage area to Eagle Lake.

Hennepin
Recipient
Lac qui Parle-Yellow Bank WD
2019 Fiscal Year Funding Amount
$300,000
Fund Source

Del Clark Lake is a regionally unique resource in the Lac qui Parle Watershed. This grant contains both restoration and protection strategies aiming to maintain the quality of this rare and valuable resource in addition to restoring the recently impaired Canby Creek, which feeds into Del Clark Lake. Three grade control structures will be implemented just upstream of Del Clark to protect against sediment and aid in regulating flows. An estimate 240 pounds of phosphorous and 2,700 tons of sediment will be reduced annually.

Lincoln
Yellow Medicine
Recipient
Goodhue SWCD
2015 Fiscal Year Funding Amount
$317,984
Fund Source

This grant application will focus on the construction of multiple targeted best management practices (BMPs) in priority areas which will provide measurable reductions in sediment and phosphorus loadings to cold water streams in the Mississippi River/Lake Pepin Watershed. The installation of these BMPs will also protect the existing stream habitat by reducing peak flows and reduced streambank erosion.

Goodhue
Wabasha
Recipient
Ramsey Conservation District
2011 Fiscal Year Funding Amount
$128,625
Fund Source

The glacial geology of Ramsey County includes many layers of impermeable and semi-permeable material that can protect aquifers from contaminated waters. Many municipal public supply wells exist to draw water from these aquifers to supply thousands of consumers on a daily basis. Unfortunately, abandoned/unused wells also penetrate the protective layers of glacial material and can "short-circuit" the natural protection our glacial geology can provide allowing unfettered movement of contamination to even deeper aquifers below the ground.

Ramsey
Recipient
Ramsey Conservation District
2013 Fiscal Year Funding Amount
$150,000
Fund Source

Ramsey County has over 3,500 acres tied to faith based organizations and schools. On average, these properties contribute one billion gallons of stormwater runoff, 3,000 pounds of phosphorus, and 1,000 tons of sediment to local water bodies. The Ramsey Conservation District (RCD) in partnership with local property owners and watershed districts/water management organizations will install 6-12 stormwater projects that will help protect and improve water quality of surrounding lakes.

Ramsey
Recipient
Ramsey Conservation District
2014 Fiscal Year Funding Amount
$150,000
Fund Source

Ramsey County has 3,500+ acres tied to 358 faith organizations and 304 schools. On average, these properties contribute 1 billion gallons of stormwater runoff, 3,000 lbs of phosphorus, and 1,000 tons of sediment to our local water bodies. The Ramsey Conservation District (RCD), working with community partners and Watershed Districts/Water Management Organizations, will install 6-12 stormwater best management projects that will help protect and improve water quality of surrounding lakes.

Ramsey
Recipient
Ramsey Conservation District
2015 Fiscal Year Funding Amount
$150,000
Fund Source

The purpose of this program is to provide cost share funding to community groups for the installation of community accessible rain gardens and other water quality projects in Ramsey County. The Ramsey Conservation District (RCD) in partnership with local property owners and Watershed Districts/Water Management Organizations will install 6-12 stormwater best management projects that will help protect and improve water quality of surrounding lakes, streams, rivers, and wetlands.

Ramsey
Recipient
Ramsey Conservation District
2017 Fiscal Year Funding Amount
$108,000
Fund Source

Ramsey County, the most densely populated county in Minnesota, generates high levels of contaminated runoff from its impervious surfaces, which can have damaging effects on both surface water and groundwater. Concerns arise when these contaminants drain into abandoned and unused wells, threatening the quality of groundwater, especially in drinking water supply areas, wellhead protection areas, or groundwater recharge zones.

Ramsey
Recipient
Ramsey-Washington Metro Watershed District
2015 Fiscal Year Funding Amount
$47,668
Fund Source

The goal of the project is to create a complete Watershed Restoration and Protection Strategy (WRAPS) report for the Ramsey-Washington Metro Watershed District for inclusion into an updated Watershed Management Plan, including completion of a watershed-wide Total Maximum Daily Load (TMDL) report sufficient for EPA approval.

Ramsey
Washington
Recipient
Ramsey-Washington Metro Watershed District
2011 Fiscal Year Funding Amount
$121,000
2012 Fiscal Year Funding Amount
$224,860
Fund Source

This project will provide the Minnesota Pollution Control Agency and Ramsey-Washington Metro Watershed District the information and tools necessary to improve water quality in Battle Creek Lake, Beaver Lake, Carver Lake, Keller Lake and Wakefield Lake through targeted phosphorus reduction activities in the watershed.

Ramsey
Recipient
City of Chanhassen
2013 Fiscal Year Funding Amount
$155,474
Fund Source

The Bluff Creek Watershed TMDL Implementation Plan evaluated the stream power index for each of the gullies identified in the 1996 Management Plan. Based upon this terrain analysis, sediment loading rates from the 1999 to 2008 P8 modeling results, and modeled surface runoff, known erosion sites were prioritized. This site, which is tributary to Bluff Creek and the Minnesota River, was given the highest priority ranking.

Hennepin
Recipient
Cedar River Watershed District
2012 Fiscal Year Funding Amount
$133,250
Fund Source

Water quality and flood damage reduction goals can't be accomplished without reducing flows and taking a targeted approach to the upper most reaches of the most critical waterways. Water and sediment control basins are eartern structures that retain water and have been identified as one of the best tool for measured success in reducing peak flows. For this project, basins will be targeted and implemented in the Upper Cedar River Watershed, specifically in the Dobbins Creek Watershed.

Dodge
Mower
Recipient
Capitol Region WD
2014 Fiscal Year Funding Amount
$360,000
Fund Source

Capitol Region Watershed District (CRWD), in partnership with the City of Roseville, will construct a volume reduction/capture-reuse irrigation facility below the Upper Villa Park Softball field in the City of Roseville. This project will protect Lake McCarrons and the Villa Park Wetland System (VPWS) by reducing runoff volumes and the pollutants associated with urban stormwater such as Total Phosphorus (TP), Total Suspended Solids (TSS), heavy metals, and petroleum products among others.

Ramsey
Recipient
Metropolitan Council/University of Minnesota
2016 Fiscal Year Funding Amount
$30,648
2017 Fiscal Year Funding Amount
$61,296
2018 Fiscal Year Funding Amount
$55,608
2019 Fiscal Year Funding Amount
$99,840
Fund Source

The Metropolitan Council, in conjunction with the University of Minnesota, is evaluating outdoor water use in the Twin Cities metro region - a subject which has come under the spotlight recently due to concerns related to water quality and quantity issues. In the Twin Cities, 20% of all treated drinking water is used outdoors, with a majority of this being used on lawns and landscapes. The goal of this proposal is to reduce water use in the home landscape by conducting assessments, research, and demonstration around the smart use of irrigation.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Redwood Cottonwood Rivers Control Area
2015 Fiscal Year Funding Amount
$150,512
Fund Source

The goal of this project is to continue best management implementation according to the Redwood River Phase II Implementation Plan (1999) and install phosphorus and total suspended solids (TSS) reducing conservation practices that will help achieve the Lower Minnesota River dissolved oxygen Total Maximum Daily Load (TMDL), and the Minnesota River Turbidity TMDL. The proposed implementation of conservation practices include: water and sediment control basins, grassed waterways, grade stabilizations and streambank stabilizations.

Lincoln
Lyon
Murray
Redwood
Recipient
Redwood-Cottonwood Rivers Control Area
2017 Fiscal Year Funding Amount
$76,111
Fund Source

In 2017 and 2018, Redwood-Cottonwood Rivers Control Area (RCRCA) will collect water chemistry samples from the 10 lakes and 24 stream sites identified in the Redwood and Cottonwood River watersheds. Six samples will be collected at 10 lakes from May through September in 2017; five samples will be collected at 5 lakes in 2018 from May through September. Eleven samples will be collected at each of the 24 stream sites following the Basic Regime in 2017. Sixteen samples at each stream site will be collected in 2017 and 2018 following the E.coli monitoring regime.

Brown
Cottonwood
Lincoln
Lyon
Murray
Pipestone
Redwood
Yellow Medicine
Recipient
Redwood-Cottonwood Rivers Control Area (RCRCA)
2013 Fiscal Year Funding Amount
$52,600
Fund Source

The Redwood and Cottonwood River Watersheds have been assessed and many reaches have been impaired for turbidity, bacteria, and low dissolved oxygen. This project will accelerate conservation efforts to reduce overland runoff sediment, bacteria, and nutrient loadings contributing to water quality impairments in targeted subwatersheds.

Brown
Cottonwood
Lincoln
Lyon
Murray
Pipestone
Redwood
Yellow Medicine
Recipient
Redwood-Cottonwood Rivers Control Area (RCRCA)
2013 Fiscal Year Funding Amount
$560,000
Fund Source

The Redwood River and Cottonwood River watersheds encompass approximately 2,020 square miles of southwestern Minnesota in the Minnesota River Basin. Land use in these watersheds is mostly agricultural and area geology makes them prone to erosion. Surface water issues within the two watersheds are a concern of local leaders. The counties and Soil and Water Conservation District leaders formed the Redwood Cottonwood Rivers Control Area (RCRCA) Joint Powers Board in 1983 to address sedimentation, water quality and quantity, and erosion issues.

Brown
Cottonwood
Lincoln
Lyon
Murray
Pipestone
Redwood
Yellow Medicine
Recipient
Metropolitan Council/HDR
2014 Fiscal Year Funding Amount
$23,304
2015 Fiscal Year Funding Amount
$403,182
2016 Fiscal Year Funding Amount
$95,060
Fund Source

The Metropolitan Council, in conjunction with HDR Engineering, Inc. consultants, will evaluate a variety of approaches to develop sustainable water supplies across the metro area. Subregional study areas are being selected where multiple communities face potential problems with the long-term sustainability of current water supplies, and where community stakeholders have expressed interest in learning more about sustainable water supply options.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Metropolitan Council/Barr Engineering Company
2015 Fiscal Year Funding Amount
$47,487
2016 Fiscal Year Funding Amount
$1,905
Fund Source

As the Metropolitan Council updated the Twin Cities Metropolitan Area Master Water Supply Plan, stakeholders asked the Council to consider the sustainable limits of the region’s water sources. The Council’s most important analytical tool is a regional groundwater flow model (Metro Model 3), which can be used to quantify the long-term regional impacts caused by hundreds of independent groundwater appropriations.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Riley-Purgatory-Bluff Creek
2013 Fiscal Year Funding Amount
$150,000
Fund Source

The goal of this project is to implement 10-15 medium sized projects that will infiltrate and reduce pollutant loads to the waters in the Riley-Purgatory-Creek Watershed District. The District intends to achieve this by using their Citizen Advisors who are well involved with local associations, City staff who are familiar with associations in their jurisdiction and also seek less-known association through various advertising methods. We intend to use staff knowledge to insure that the projects are suitable for the site and implemented correctly to maximize efficiency.

Carver
Hennepin
Recipient
Capitol Region WD
2015 Fiscal Year Funding Amount
$175,000
Fund Source

Capitol Region Watershed District is partnering with St. Paul Public Schools to implement a variety of highly visible Best Management Practices at Central High School that will improve the quality of stormwater discharged to the Mississippi River. A tremendous amount of sediment is discharged from the school annually due to the large impervious areas and lack of vegetation. Implementing the projects will reduce sediment by 86% and phosphorus by 90% over the target area annually.

Ramsey
Recipient
Rice Creek WD
2014 Fiscal Year Funding Amount
$25,000
Fund Source

The Rice Creek Watershed District (RCWD) will create a web-based, mobile-compatible public drainage system inspection and maintenance database. This database system will enable District staff to create and track maintenance requests and inspections from the field, including Geo-referencing locations requiring repair via a mobile device. The system will greatly reduce the time required to identify and log each maintenance request, enabling staff to inventory more miles of public drainage system yearly thereby identifying erosion problems more efficiently and thoroughly.

Anoka
Hennepin
Ramsey
Washington
Recipient
Barr Engineering
2012 Fiscal Year Funding Amount
$3,000
Fund Source

This project will complete the final Implementation Plan, semi-annual and final reports and hold project meetings. The Implementation Plan will identify target areas and priorities for implementation strategies to improve water quality for Bluff Creek. This project will build the groundwork so Bluff Creek will meet water quality standards for aquatic life in the future.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Minnesota Board of Water and Soil Resources
2011 Fiscal Year Funding Amount
$6,940,000
Fund Source

This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Riparian Buffer Easement Program targets creating buffers on riparian lands adjacent to public waters, except wetlands. Through the Reinvest in Minnesota Program (RIM) and in partnership with Soil and Water Conservation Districts and private landowners, permanent conservation easements are purchased and buffers established.

Blue Earth
Brown
Carver
Chisago
Cottonwood
Faribault
Jackson
Kandiyohi
Martin
McLeod
Meeker
Murray
Nobles
Olmsted
Otter Tail
Pope
Redwood
Renville
Rice
Scott
Steele
Stevens
Wilkin
Recipient
Dodge SWCD
2016 Fiscal Year Funding Amount
$36,675
Fund Source

Nitrogen is a serious problem in Minnesota's Mississippi River Basin and the Dodge Soil and Water Conservation District (SWCD) plans to address this problem through the instillation of six nitrogen reducing agricultural best management practices in the Dodge/Steele Joint County Ditch No. 11 system, also known as the Ripley Ditch system. Agriculture drainage, through the use of agricultural tile drainage systems, has been identified as the number one leading source of nitrogen in the Mississippi River Basin.

Dodge
Recipient
Brooklyn Park, City of
2020 Fiscal Year Funding Amount
$250,000
Fund Source
Hennepin
Recipient
Tetra Tech
2022 Fiscal Year Funding Amount
$17,656
Fund Source

The Root (HUC 07040008) and Upper Iowa/Mississippi River – Reno (HUC 07060002 and 07060001) watershed Hydrologic Simulation Program – FORTRAN (HSPF) models currently simulate hydrologic and water quality processes through 2015. In order to support work to update the existing WRAPS report, the two HSPF models will be extended through 2021.

Dodge
Fillmore
Houston
Mower
Olmsted
Wabasha
Winona
Recipient
Tetra Tech Inc
2021 Fiscal Year Funding Amount
$17,877
Fund Source

The contractor will use the  Scenario Application Manager (SAM) tool to build water quality restoration scenarios for the Root River watershed using the Hydrologic Simulation Program FORTRAN (HSPF) model. The SAM tool simulates  total suspended solids (TSS) and nitrogen reductions based on implementation of various best management practices.

Dodge
Fillmore
Houston
Mower
Olmsted
Wabasha
Winona
Recipient
Fillmore SWCD
2022 Fiscal Year Funding Amount
$1,469,595
Fund Source

This grant will fund about 80 project in six sub-watersheds (Headwaters of the Middle & South Branch, Money Creek, Headwaters of Upper Iowa River, Mill Creek, south Fork Root River, and Carey Creek). Projects to include grassed waterways, water and sediment control basins, grade stabilization structures, livestock waste projects, streambank projects and cover crops. Funding will also support staff time for project development and technical assistance for the cost-share projects.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Winona SWCD
2018 Fiscal Year Funding Amount
$851,301
Fund Source

This grant will fund an expected 44 projects in 4 subwatersheds (South Fork Root River, Crooked Creek, Rush-Pine and portions of the headwaters of the Middle and South Branch Root) and 2 DWSMAS (Chatfield and Utica). Projects include grassed waterways, WASCOBs, grade stabilization structures and cover crops, plus field walkovers, project development, and technical assistance. The anticipated sediment reduction from this work will be 2,285.5 tons, or 2.2% of the 10-year goal for the entire planning area.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Winona SWCD
2020 Fiscal Year Funding Amount
$1,469,595
Fund Source
Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Fillmore County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$319,700
Fund Source

TMDL project in the Root River Watershed that will support surface water assessment, analysis of data, interpretation of southeast Minnesota's karst landscape, stressor identification, TMDL computation, source assessment, and implementation planning.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Nine Mile Creek WD
2021 Fiscal Year Funding Amount
$750,000
Fund Source
Hennepin
Recipient
Hennepin County
2019 Fiscal Year Funding Amount
$142,110
Fund Source

Hennepin County will implement prioritized projects from the Rush Creek Subwatershed Assessment, including closing about 200 open tile intakes on the farms of 11 landowners, establishing 6 grassed waterways, two exclusion fence systems, and two contour farming conversions. These projects will significantly reduce bacteria loads upstream of Elm Creek Park Reserve where the creek serves as a learning laboratory for more the 2,500 students each year. In addion, these projects will reduce sediment by 616 tons per year and phosphorus by 478 pounds per year.

Hennepin
Recipient
Elm Creek WMC
2017 Fiscal Year Funding Amount
$60,000
Fund Source

Seven lakes and four streams in the Elm Creek watershed are impaired by excess nutrients, bacteria, low oxygen, and unhealthy biotic communities. Modeling completed for the Watershed Restoration and Protection Strategy identified areas that contribute high loads of sediment and nutrients to the streams and lakes in the watershed, however, the scale of that modeling was not sufficient to pinpoint to the field level where BMPs would be most effective. The Rush Creek Headwaters Subwatershed Assessment will evaluate four high pollutant loading catchments.

Hennepin
Recipient
Ramsey Washington Metro Watershed District
2012 Fiscal Year Funding Amount
$1,250,000
Fund Source

Construct stormwater BMPs to meet TMDL wasteload allocation

Ramsey
Recipient
Saint Paul, City of
2024 Fiscal Year Funding Amount
$774,577
Fund Source

Construct stormwater management basin to meet TMDL wasteload allocation

Ramsey
Recipient
Saint Paul, City of
2021 Fiscal Year Funding Amount
$100,000
Fund Source

Construct stormwater management system to meet TMDL wasteload allocation

Ramsey