Many lakes in Minnesota are classified as “impaired” for aquatic recreation and aquatic life as the result of nonpoint source pollution. These impairments can be addressed by the citizens that live by and have a vested interest in these water bodies, but there is often a lack of knowledge and resources to take effective action. The Freshwater Society is using this appropriation to train citizen groups in lake ecology and management in order to guide them in implementing water quality improvement projects for their local water bodies.
The primary purpose of the project is to reduce soil loss from fields, improve the water quality of Roseau River Watershed District Ditch #3 by eliminating sediment deposition. This project will reduce maintenance costs along the ditch system by installing 29 sidewater inlets. The project will be a team effort with the Roseau County Soil and Water Conservation District and private landowners located along the ditch systems.
The RIM-WRP program will expand past efforts and provide important benefits to the citizens of Minnesota by restoring and permanently protecting priority wetlands and associated upland native grassland wildlife habitat via perpetual conservation easements. This funding will leverage $12.6 million of federal WRP funds for the State of Minnesota and is expected to create and sustain 343 jobs and income to local landowners, businesses and others in the state based on USDA economic estimates.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase VI protected and restored 1,391 acres of previously drained wetlands and adjacent grasslands on 15 conservation easements.
Project funding is requested to complete the second phase of an on-the-ground implementation project to restore function to the partially drained Rice Lake wetland, which will reduce the largest phosphorous tributary loading source to downstream Detroit Lake, a high value recreational lake. This wetland restoration nutrient reduction project was broken up into two (2) construction phases due to cost constraints, with the Phase 1- Upper Pool Restoration Area completed in November 2021 using a Clean Water Fund Grant (C21-4482).
The Rice Lake Wetland Nutrient Reduction Project will provide nutrient reductions to downstream recreational water bodies by restoring the Rice Lake Wetland from its current area of 434 acres to pre-ditched water levels of approximately 896 acres.
Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.
Using the Reinvest in Minnesota (RIM) program, this project addresses the potential loss of grassland habitats from conversion to cropland and accelerates grassland protection efforts not covered by other programs. Working in coordination with 11 Minnesota Prairie Conservation Plan Local Technical Teams (LTTs), and 64 local Soil & Water Conservation Districts (SWCDs) this proposal will enroll 490 RIM acres (approximately 7 easements), focusing on Minnesota Prairie Plan identified landscapes.
Using the Reinvest in Minnesota (RIM) program, this project addressed the potential loss of grassland habitats from conversion to cropland and accelerate grassland protection efforts not covered by other programs. Focusing on Minnesota Prairie Plan-identified landscapes and working in coordination with established Prairie Conservation Plan Local Technical Teams (LTTs), this project fulfilled the accomplishment plan goal of enrolling 710 acres of grassland habitat in permanent conservation easements by completing more easements than estimated, for a total of 13 easements.
Using the Reinvest in Minnesota (RIM) program, this project addressed the potential loss of grassland habitats from conversion to cropland and accelerated grassland protection efforts not covered by other programs. Focusing on Minnesota Prairie Plan-identified landscapes and working in coordination with established Prairie Conservation Plan Local Technical Teams (LTTs), this project completed 7 RIM conservation easements permanently protecting 617 acres of grassland habitat, exceeding the accomplishment plan goal by 23%.
Using the Reinvest in Minnesota (RIM) program, this project addresses the potential loss of grassland habitats from conversion to cropland and accelerates grassland protection efforts not covered by other programs. Working in coordination with 11 established Prairie Conservation Plan Local Technical Teams (LTTs), and local SWCDs this proposal will enroll 936 RIM acres (approximately 12 easements), focusing on Minnesota Prairie Plan identified landscapes.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase V protected and restored 2,041 acres of previously drained wetlands and adjacent native grasslands on 23 conservation easements. All easements have been recorded. $35,000 of funds from other sources were also used.
We propose identifying hot spots of groundwater chloride pollution of surface waters due to excessive road salt use, which is a long term source increasing chloride impairment of surface waters.
To create an area dedicated to arts, cultural heritage, and MN history exhibits at the Roseau County Fair. The display will rotate annually; for 2012, the Roseau County Historical Society will display pictures and video of the 2002 flood in Roseau County, and displays of old washing machines and saws used by the logging industry.
The Lake of the Woods Watershed Assessment will include the waters of Warroad River and Willow River in Roseau County where sites are located in the lower reaches of each surface water system. This assessment focuses on collection of water chemistry and field parameters at four sites.
Over a century ago, the Roseau River in the northwestern corner of Roseau County was channelized by the State with the establishment of State Ditch 51. The Roseau River Watershed District and Minnesota DNR, through multiple phases, will cooperatively restore a total of 13.6 miles of river channel, adding 366 acres of high-quality large river habitat within the Roseau River WMA and enhancing the river's riparian habitat corridor. This project is the first phase and will begin progress towards restoring the Roseau River.
Phase 1 of the Roseau River Watershed Restaration and Protection Strategy (WRAPS) project will focus on planning and coordination among project partners, creating a civic engagement strategic plan, holding a watershed kick-off meeting, gathering and summarizing available watershed information and data, and developing a data gap monitoring plan.
The Roseau River Watershed Assessment will include the waters of the Roseau River, Sprague Creek, Hay Creek and Hayes Lake. All of the monitoring sites, except one, are located in Roseau County, with the exception being located in Kittson County. This assessment focuses on collection of water chemistry and field parameters at one site on Hayes Lake and seven key sites on the Roseau River, which have been identified by MPCA. These sites are located in the lower reaches of each surface water system.
This is the second phase of the Roseau River Watershed Restoration and Protection Strategy (WRAPS) project, which includes: developing the Total Maximum Daily Load (TMDL) study, pollutant load allocations, watershed restoration and protection strategies, and conducting civic engagement.
The goal of this project is to construct, calibrate and validate a watershed model using Hydologic Simulation Program FORTRAN (HSPF) for the Roseau River Watershed.
The goal of this project is to develop a Roseau Lake Water Quality Improvement Report that will include a prioritized, targeted, and measurable implementation plan that will improve water quality in the Roseau Lake watershed. The project will result in development of site specific implementation actions through use of the Prioritize, Targeting, and Measuring Application (PTMApp) and the Drained Wetland Basin Inventory terrain analysis methods.
This multi-purpose project will partially restore a large drained lake, restore and reclaim stream reaches, provide water level management capacity to substantially improve wildlife habitat conditions and provide flood damage reduction benefits, and will contribute to water quality improvements in the Roseau River.
255 acres were acquired in 2021 using OHF funding. These are acres allowed the dike to be aligned with the beach ridge of the lake.
Construction of Phase 1 (see map) was initiated in September 2023. The northwest embankment was built and a weir steering the main flow of the Roseau River into a natural oxbow was installed. A water control structure (on Pine Creek) and finishing work on the dike will be completed this year.