The Villa Park Wetland Restoration Project proposes sediment removal from 6 contiguous stormwater wetland treatment cells within the Villa Park Wetland system resulting in an additional 118lbs/yr of total phosphorus(TP) removal from water entering Lake McCarrons.
Acquisition of Columbus Lake Conservation Area will protect 258 acres of quality habitat for game and waterfowl hunters, creating a wildlife corridor connecting Lamprey Pass WMA to other protected habitat.
Rice Creek Chain of Lakes Park Reserve, complete reconstruction of campground roadways, utility improvements and campsites. (3 of 6 projects financed with grant.)
The project will include lake monitoring on three (3) lakes found in the Rum River watershed in southeastern Crow Wing County (CWC). The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. All of the proposed monitoring sites are target sites for 2013-2014. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).
This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.
This project will complete a Watershed Restoration and Protection Plan for the Lower St. Croix River that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed, and that are understood and adoptable by local units of government and other stakeholders.
This project will support the development of whole farm conservation plans for ten (10) agricultural producers within the Sunrise River Watershed. The conservation plans will be used by the farmer and the Chisago SWCD to develop an action plan to address the resource concerns identified as part of the AgEQA program. The overall goal of the program is to prioritize conservation practices that will improve the overall water quality of the Sunrise River.
This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.
The goal of this project is to develop a phosphorus TMDL for the six impaired lakes in the southwest portion of the Rice Creek Watershed District; Island Lake, Little Lake Johanna, Long Lake, East Moore Lake, Pike Lake and Lake Valentine.
This project will provide the MPCA, CCWD, and all other stakeholders the information and tools necessary to improve the water quality within Coon Creek Watershed District. The improvements will take place using targeted activities throughout the watershed to reduce the primary biological and chemical stressors. In turn, the reduction of these stressors will help to reduce overall loadings of sediment, turbidity, total phosphorus, and E. coli bacteria.
Implementation activities proposed as a part of this project include water quality monitoring, biotic surveys, sediment core sampling, mechanical treatment of curly-leaf pondweed (in accordance with regulations and permitting), an iron-enhanced sand filter, with a high capacity multi-stage outlet weir and 40,000 pounds of iron filings and stakeholder involvement in the design process and educational presentations.
Mississippi River Regional Trail, design and reconstruct bituminous trail segment from Anoka County Riverfront Regional Park to 37th Avenue. (6 of 6 projects financed with grant.)
Rice Creek West Regional Trail, design and reconstruct entrance drive parking lot and sidewalks in Manomin Park trail head. (5 of 6 projects financed with grant.)'
The Children’s Museum of Southern Minnesota (CMSM) will complete the innovative community engagement process started with the previous Legacy grant. CMSM will build upon the progress created with the previous Legacy grant by transitioning the team's focus to carrying-out of strategic access strategies that engage a diversity of community members in the exhibit development process, resulting in the completion of fabrication plans for exhibits and environments that are accessible; engaging; and reflect the diverse art, culture, and heritage of southern Minnesota.
The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.
Per Minnesota Laws, 2011, 1st Special Session, Chapter 6, Article 4, Section 2, Subd. 6, "These amounts are appropriated to the commissioner of administration for grants to the named organizations for the purposes specified in this subdivision.