This project will analyze existing and projected data to develop simple tools to predict the effect of land use and climate change on extreme floods and droughts.
The project will assess chemical and biological defluorination activities in environmental samples and identify the microorganisms, metabolic pathways, and intermediates resulting from degradation of fluorinated pesticides and pharmaceuticals.
To construct an exhibit building adjacent to the fire tower now located on the Beltrami County Fairgrounds. The new building will replicate an authentic 1950s ranger station and will house an exhibit of Minnesota forest fire service activity, Ojibwa cultural history, a display of Paul Bunyan legends and artifacts, and space for historical, cultural and environmental education.
Our program/project will protect and maintain intact forest ecosystems through the use of perpetual conservation easements and other tools. This program/project will directly protect approximately 187, 277 acres of forest and wetlands with permanent conservation easements and 1,344 acres with fee acquisition.
The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.
This leadership workshop series will provide the participants (citizen leaders) with knowledge, skills, processes and tools that can help to strengthen their current efforts and nurture new ones.
This project will build the first comprehensive list of Minnesota moths and butterflies. Information gained through surveys and outreach efforts will inform land managers and inspire public appreciation.
To restore the Freeman Doud Cabin and Sunnyside School, located on the Beltrami County fairgrounds. During the fair, visitors will be able to able to observe the log cabin restoration and chinking process. Display boards will depict the history of the cabin, show where it was built on Lake Bemidji, and acquaint people with the importance of preserving this history.
BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.
This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.
This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.
This project involves the water quality monitoring of, and data analysis for four major watersheds (8-digit Hydrologic Unit Codes) in the Rainy River Basin. This monitoring will assist in providing the water chemistry data needed to calculate annual pollutant loads for the Major Watershed Pollutant Load Monitoring Network (MWPLMN) and provide short term data sets of select parameters to other Agency programs.
Funding is prioritized to structural and non-structural practices within the Upper Mustinka and Fivemile Creek planning regions. In addition, a primary goal will be to complete a feasibility study for the Fivemile Creek Restoration as well as completion of the final phase of the Lake Traverse Water Quality Improvement Project. The BdSWD will focus on 4 CIPs within the Bois de Sioux River planning regions; WCD Sub-1, WCD 35 and WCD 20 & 25 drainage retrofit projects.
This is the third round of watershed based implementation funds to be shared by up to 13 LGU's between the Bois de Sioux River and Mustinka River watersheds. These funds are to implement grant eligible components of the 2021 - 2030 Joint Comprehensive Watershed Management Plan. Activities for this grant application are diverse, reflecting activities planned to improve water quality to and within legal drainage systems, streams, and lakes in the Bois de Sioux and Mustinka River watersheds.
The Chippewa River Watershed planning partnership has based its comprehensive watershed management plan (CWMP) on six planning regions. Each planning region has a list of prioritized and targeted resource concerns, measurable goals, and implementation actions. Implementation actions will be focused based on the CWMP on the highest and medium priority practices in locations within each planning region, which were prioritized based on local concerns, programs, etc.
This project will create and optimize eDNA assays to detect the presence of 8 endangered or threatened mussel species around Buffalo Slough near Prairie Island Indian Community.
Geologic atlases provide maps/databases essential for improved management of ground and surface water. This proposal will complete current projects and start new projects to equal about 4 complete atlases.
Get the Lead Out is focused on protecting common loons and wildlife through education and outreach about the danger of lead fishing tackle and promoting lead-free tackle alternatives.
The Thief River is the source of drinking water for the City of Thief River Falls. The river's other designated uses also include recreation and aquatic life. Water quality monitoring conducted by local agencies discovered that the Thief River is not meeting state water quality standards for both turbidity (muddiness) and dissolved oxygen. Each year, approximately 12,376 tons of sediment is deposited into the Thief River Falls reservoir by the Thief River. That is the equivalent of over 1,200 dump trucks full of dirt.
In the early 1900s, a joint State and County drainage project constructed a 1 mile outlet channel to Grand Marais Creek to provide a shorter outlet to the Red River and effectively abandoned the lower 6 miles of the natural channel. In recent times, the ditch has eroded from its original shape to a channel of steep gradients and unstable banks. This has resulted in head cutting of the channel and nearly continuous channel erosion and bank sloughing with the effect of depositing up to an estimated annual average of 700 tons of sediment into the Red River.
To hire a qualified and experienced historian to prepare a Cultural Landscape Report that will guide future preservation projects on the grounds of the Grant County Courthouse, listed in the National Register of Historic Places.
Per Minnesota Laws, 2011, 1st Special Session, Chapter 6, Article 4, Section 2, Subd. 6, "These amounts are appropriated to the commissioner of administration for grants to the named organizations for the purposes specified in this subdivision.
Three consultants with historic preservation, architectural and structural engineering expertise were contracted to conduct a structural assessment of the Grant County Courthouse concrete slab floors. They collected and analyzed data through a detailed visual survey of the floor slabs, materials testing using non-destructive methods and performing engineering analysis. Recommendations were made for the retrofit of the floor slabs.
Per Minnesota Laws, 2009, Chapter 172, Article 4, Section 2, Subd. 5, "Funds in this subdivision are appropriated to the commissioner of the Department of Administration for grants to the named organizations for the purposes specified in this subdivision. Up to one percent of funds may be used by the Department of Administration for grants administration. Grants made to public television or radio organizations are subject to Minnesota Statutes, sections 129D.18 and 129D.19."