This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.
This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.
This project involves the water quality monitoring of, and data analysis for four major watersheds (8-digit Hydrologic Unit Codes) in the Rainy River Basin. This monitoring will assist in providing the water chemistry data needed to calculate annual pollutant loads for the Major Watershed Pollutant Load Monitoring Network (MWPLMN) and provide short term data sets of select parameters to other Agency programs.
The Chippewa River Watershed planning partnership has based its comprehensive watershed management plan (CWMP) on six planning regions. Each planning region has a list of prioritized and targeted resource concerns, measurable goals, and implementation actions. Implementation actions will be focused based on the CWMP on the highest and medium priority practices in locations within each planning region, which were prioritized based on local concerns, programs, etc.
This project will create and optimize eDNA assays to detect the presence of 8 endangered or threatened mussel species around Buffalo Slough near Prairie Island Indian Community.
Geologic atlases provide maps/databases essential for improved management of ground and surface water. This proposal will complete current projects and start new projects to equal about 4 complete atlases.
Get the Lead Out is focused on protecting common loons and wildlife through education and outreach about the danger of lead fishing tackle and promoting lead-free tackle alternatives.
To fabricate and install 26 interpretive markers along portions of Minnesota highways 104, 55, 28 and 29
The grant assisted in hiring a consultant to review and revise 26 historical markers and pictorial tables to make a determination regarding historical accuracy and to facilitate Tribal consultation and input for the Glacial Ridge Trail Scenic Byway Interpretive Signage Project along portions of Minnesota highways 104, 55, 28 and 29.
The Thief River is the source of drinking water for the City of Thief River Falls. The river's other designated uses also include recreation and aquatic life. Water quality monitoring conducted by local agencies discovered that the Thief River is not meeting state water quality standards for both turbidity (muddiness) and dissolved oxygen. Each year, approximately 12,376 tons of sediment is deposited into the Thief River Falls reservoir by the Thief River. That is the equivalent of over 1,200 dump trucks full of dirt.
In the early 1900s, a joint State and County drainage project constructed a 1 mile outlet channel to Grand Marais Creek to provide a shorter outlet to the Red River and effectively abandoned the lower 6 miles of the natural channel. In recent times, the ditch has eroded from its original shape to a channel of steep gradients and unstable banks. This has resulted in head cutting of the channel and nearly continuous channel erosion and bank sloughing with the effect of depositing up to an estimated annual average of 700 tons of sediment into the Red River.
Per Minnesota Laws, 2011, 1st Special Session, Chapter 6, Article 4, Section 2, Subd. 6, "These amounts are appropriated to the commissioner of administration for grants to the named organizations for the purposes specified in this subdivision.
Per Minnesota Laws, 2009, Chapter 172, Article 4, Section 2, Subd. 5, "Funds in this subdivision are appropriated to the commissioner of the Department of Administration for grants to the named organizations for the purposes specified in this subdivision. Up to one percent of funds may be used by the Department of Administration for grants administration. Grants made to public television or radio organizations are subject to Minnesota Statutes, sections 129D.18 and 129D.19."
This project will produce content for the Headwaters exhibit including: 1) creation and content development of Meet Your Neighbor stations; 2) creation of two murals and a sculpture celebrating diversity; 3) new exhibit design in partnership with Stearns County History Museum; 4) design an art fence for the Outdoor Adventures exhibit.
In 2018 the Great River Children's Museum, (GRCM) received a building worth $1,500,000 from Liberty Bank. Since receiving this gift, the Board of Directors has completed a Museum Strategic Master Plan with Vergeront Museum Planning, a predesign plan and building condition assessment with JLG Architects, a hazardous building materials assessment with Braun Intertec, and a marketing plan with Gearbox Marketing.
Great River Children's Museum: Moving Forward Project encompasses the development of new exhibits & programs with and for the families of Central MN. We are expanding upon partnerships formed with community groups, developing exhibit areas that open doors to new experiences and cultures, and working to create program guides that will highlight some of the many informal learning opportunities to be found in our exhibit areas.
Objective 1: By the end of 24 months, at least 50 students will increase their Ojibwemowin fluency level one ACTFL step each year. Objective 2: Establish a library at Endazhi-Nitaawiging with at least 500 books to support K-8 immersion education.
This project proposes to increase the adoption of cover cropping in southwest Minnesota to address issues of loss of diversity and environmental degradation. By generating important information on cover crops,
This project will monitor seven lakes and 15 stream sites within the Hawk Creek Watershed to collect surface water quality data to determine the health of the watershed's streams and lakes and if they are in need of restoration or protection strategies. The sites will be monitored according to Minnesota Pollution Control Agency's Water Monitoring Standard Operating Procedures. The goal of this project will be to accurately gather water quality samples and data as part of an organized effort to determine surface water quality conditions within the Hawk Creek Watershed.
This project will assess 4 lakes and 17 stream sites. The four lakes will be assessed for total phosphorus, chlorophyll-a, and secchi data by the HCWP staff. Staff will monitor East Twin, West Twin, West Solomon, and St. John’s Lakes for total phosphorus, chlorophyll-a, and Secchi disk readings. In order to obtain a sufficient dataset. Ten samples will be collected over 2 years. Water samples at 17 stream locations for chemical analyses, including intensive watershed monitoring sites and “non-target” sites.
This project will monitor a total of eight sites (six through the Watershed Pollutant Load Monitoring Network and two through the Intensive Watershed Monitoring). Through the Watershed Pollutant Load Monitoring Network, six sites will be monitored within the Minnesota River - Granite Falls Watershed: Hawk Creek near Maynard, Hawk Creek near Granite Falls, Beaver Creek near Beaver Falls, Yellow Medicine River near Granite Falls, Yellow Medicine River near Hanley Falls, and Spring Creek near Hanley Falls.
The Leech Lake Band of Ojibwe is working within the Leech Lake Reservation boundaries to address loss and degradation of aquatic habitat for wild rice and waterfowl. Efforts will include regulating water levels on shallow lakes by controlling beaver activity and conducting periodic water level draw-downs, reseeding of approximately 200 acres of wild rice, and implementing adaptive management based on analysis of wild rice productivity.
With this appropriation, the Minnesota Land Trust plans to protect approximately 500 acres of critical shoreline habitat along Minnesota's lakes, wetlands, rivers, and streams by securing permanent conservation easements and dedicating funds for their perpetual monitoring, management, and enforcement. Lands being considered for permanent protection in this round of funding are located in Becker, Beltrami, Blue Earth, Itasca, Kandiyohi, Lac Qui Parle, Le Sueur, Otter Tail, Pope, and Wabasha counties.
This project will sample and monitor 18 sites for chemical, physical and bacteriological parameters for two years in coordination with the 2015-16 Surface Water Assessment Grant (SWAG) work plan proposal. Headwaters Science Center (HSC) will be the project lead and recruit volunteer students from Trek North, Bug-O-Nay-Ge-Shig, and Deer Lake high schools as well as to two AmeriCorps volunteer crews. An experienced Minnesota Pollution Control Agency (MPCA) environmental scientist will be the project lead responsible for oversight and full compliance to MPCA protocols.
Evaluation of Minnesota raptors, in rehabilitation and free ranging settings, for current or previous exposure to highly pathogenic avian influenza virus to better understand outbreak impacts to raptor populations.
To provide structural repair and fire protection to the Hotel Atwater, listed on the National Register of Historic Places, for use as a municipal building.
This project will continue to develop, and calibrate/validate the hydrology of an HSPF watershed model for the Thief River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.
This project will construct, calibrate, and validate three HSPF watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.
This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.