This Phase 6 request for Ducks Unlimited’s Living Lakes program will enhance 1,000 acres of shallow lakes and restore 50 acres of small wetlands by engineering and installing water control structures for Minnesota DNR and U.S. Fish & Wildlife Service on public lands and wetlands under easement. Structures will be used by DNR and Service partners to restore wetland hydrology and actively manage shallow lake water levels to enhance their ecology for ducks, other birds, and hunters in the Prairie Region of Minnesota.
Phase 2 of Ducks Unlimited's ongoing engineering program restored and enhanced shallow lakes and wetlands by installing water level control structures to improve aquatic plant abundance and water clarity in partnership with the Minnesota DNR and U.S.
Provide approximately 15 matching grants for local parks, trail, acquisition of natural areas and trails to connect people safety to desirable community locations and regional or state facilities.
The Lower Mississippi River Feedlot Management in MN project will be leveraging State funding from BWSR to provide match for a United States Department of Agriculture Natural Resources Conservation Service (USDA-NRCS) Regional Conservations Partners Program (RCPP). BWSR will provide technical and financial assistance to plan and design projects to mitigate feedlot runoff from smaller (less than 300 animal units or AUs*), open lot feedlots in southeastern Minnesota.
The project will plan, implement, and report on a community engagement strategy for identifying community/landowner opportunities, obstacles, and opinions on land management and water quality that will result in the identification of Watershed Restoration and Protection Strategies (WRAPS) input for the Sibley, Nicollet, Renville, McLeod, Rice, and Le Sueur County areas of the Lower Minnesota River watershed.
Leveraging new statewide climate data, we will assess future change in the duration, frequency and magnitude of heavy precipitation and drought events and engage communities to prepare for these extremes.
Through this project, the function and water quality of County Ditch Number 11 (CD #11) will be improved, contributing toward water quality improvements in Winsted Lake. This will be done by implementing 10 grade stabilization structures, 4 water and sediment control basins, and 1 grassed waterway throughout the drainage systems watershed. By completing this project a sediment will be reduced by 108 tons per year, and total phosphorus will be reduced by 124 pounds per year.