The Terrace grist mill was built in 1903. In 1967, the mill was abandoned. In 1979, the non-profit Terrace Mill Foundation was incorporated, purchased the mill and began a 30 year commitment to restoring and maintaining the mill and property.
The Foundation is managed by a volunteer board of directors. Today, the three story mill contains a circa 1900 general store, museum of mill artifacts, gift shop, historic media center, Pioneer Playhouse Theater and Wheeler Art Gallery. In July, 1979, the Terrace Mill District was placed on the National Registry of Historic Places.
The Greater Blue Earth River Basin Alliance (GBERBA), a nine County/SWCD JPO has identified buffers as a basin priority. This initiative will work towards the goal of identifying all DNR protected shoreland in the GBERBA counties without a 50 foot vegetative buffer. Buffer strips protect surface and groundwater from a multitude of pollutants. During stormwater run off events buffers can remove between 50 and 100 percent of nutrients, pesticides, pathogens, and sediment. The estimated sediment reduction for this project is 756 tons per year prevented from entering our waters.
Thiel Creek is a designated trout stream in southern Stearns County and outlets into Lake Marie and Lake Louisa. Both lakes are impaired for nutrients. Thiel Creek is experiencing severe bank erosion and local residents have expressed concern about the excessive sedimentation entering the lakes. Most of this erosion is occurring on an approximate mile reach of the creek just upstream of the outlet into the lake.
The Chippewa Falls Townhall has been on the National Register of Historic Places since 1979 as part of the Terrace Mill Historic District.
Storm damage accelerated the need for repairs to the more deteriorated areas of the building. Four areas were identified for this repair project. Roof shingles were replaced, the bell tower was restored, cornice returns were reconstructed and window frames and sashes were repaired, reglued and repainted. These maintainance measures are estimated to provide the building with protection from the elements for the next twenty years.
This project will assure that buffer strip compliance is being followed throughout the system. It will identify areas that will work to keep excess sediment and nutrients out of the water and provide a good strategy for cleaning the water and reducing costs to the system long term. More importantly, it provides an opportunity to have dialogue with landowners along the entire ditch and communicate the importance of buffers and conservation practices such as detainment areas and catchment Best Management Practices that keep the soil out of the system.
The Two Rivers Watershed is listed as a high priority in the Stearns County Comprehensive Water Management Plan. This project will inventory the existing public drainage systems and develop a targeting program to measure, prioritize and target the factors causing the water quality problems of Two Rivers Lake (impaired for nutrients) in Stearns County. With public access and a county park on the lake, it is a destination for fisherman in the area.
The goal of this project is to assess groundwater sustainability in the I-94 corridor between the Twin Cities and St. Cloud due to the corridor's significant expected growth, the inerent natural limits of groundwater, and the vulnerability of groundwater to contamination.
Through our “Somali Language and Culture” gatherings, Central MN neighbors will learn conversational Somali phrases they can share with their colleagues, customers, clients, patients, and/or friends. These gatherings will also include a time of learning about the Somali culture! These sessions will be taught by Farhiya Iman, a member of the St. Cloud Somali community, a Unite Cloud speaker, and a local small business owner.
For this project, we are partnering with a local Somali-owned business, Nori Cafe and Creamery. Nori Cafe and Creamery provides a space that bridges the gap between different cultures through events and an array of coffee, tea, smoothies and cold drinks. Starting this past June, they have hosted bi-monthly “Somali Language Nights” where a local member of the Central MN Somali community teaches Somali phrases to non-Somali community members. #unitecloud has promoted this event on our social media and the response has been fantastic!
State law charges the Metropolitan Council (Council) with developing and maintaining a base of technical information needed for sound water supply decisions (Minnesota Statutes 473.1565). The Council’s primary tool to provide this information is the Metro Model 2, a regional groundwater model capable of predicting the impacts of planned water demand on aquifers and connected lakes and streams. The Metro Model 2 is a modern and comprehensive groundwater model of the Twin Cities area, but it is currently out-of-date.
Regional recharge modeling with the Twin Cities daily soil water balance (SWB) model has been a fundamental part of the Metropolitan Council’s groundwater flow modeling effort and supports the Metropolitan Area Master Water Supply Plan. The SWB model is used to evaluate the impact of planned and potential land use and climate on recharge in the eleven-county metropolitan area, and supports the ongoing update of the regional groundwater flow model.
This project will target three identified drainage systems contributing to one tributary outfall to Long Lake, an impaired water body of the Sauk River Chain of Lakes. These systems produce large volumes of stormwater runoff that degrades the tributary and compromise water quality.
This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.
The goal of this project is to conduct water chemistry monitoring at two subwatershed sites based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads. This loading information, in turn, will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters.
This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).
This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.
This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.
Upper Mississippi, North Fork Crow River Major Watershed TMDL Project led by CROW with assistance from local partners North Fork Crow River Watershed District (WD); Middle Fork Crow River WD; Wright Soil and Water Conservation District (SWCD).
The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.
This project will develop a watershed restoration plan that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed. It will also an important framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.
Minnesota's twelve regional library systems, which encompass more than 350 public libraries in all areas of the state, can benefit from a portion of the Legacy Amendment's Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional library system is eligible to receive a formula-driven allocation from the annual $2.5 million Minnesota Regional Library System Legacy Grant. Viking Library System (VLS) is a federated regional public library system with central services located in central western Minnesota.
Minnesota's twelve regional library systems, which encompass more than 350 public libraries in all areas of the state, can benefit from a portion of the Legacy Amendment's Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional library system is eligible to receive a formula-driven allocation from the annual $2.5 million Minnesota Regional Library System Legacy Grant. Viking Library System (VLS) is a federated regional public library system with central services located in central western Minnesota.
Minnesota’s 12 regional public library systems, which encompass 350 public libraries in all areas of the state, benefit from a portion of the Legacy Amendment’s Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional public library system receives a formula-driven allocation from the annual $3 million Minnesota Regional Library Legacy Grant.
Minnesota’s Legacy Amendment raises revenue for Clean Water, Outdoor Heritage, Parks and Trails, and Arts and Cultural Heritage. Libraries are beneficiaries of a portion of the Arts and Cultural Heritage Funding.
Minnesota’s 12 regional public library systems, which encompass 350 public libraries in all areas of the state, benefit from a portion of the Legacy Amendment’s Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional public library system receives a formula-driven allocation from the annual $3 million Minnesota Regional Library Legacy Grant.
Minnesota’s twelve regional library systems, which encompass more than 350 public libraries in all areas of the state, can benefit from a portion of the Legacy Amendment’s Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional library system is eligible to receive a formula-driven allocation from the annual $2.2 million Minnesota Regional Library System Legacy Grant. Viking Library System (VLS) is a federated regional public library system with central services located in central western Minnesota.
This proposal seeks to prevent nitrate contamination in and around vulnerable Non-Community (Transient and Non-Transient) Public Water Supplies within the sandy outwash plains of the Mississippi River in Central Minnesota. Within the work area we have identified 221 public (non-municipal) water supplies in this area which include places of worship, restaurants, office spaces, bars, daycares and campgrounds within the Morrison and Benton County work area.
Tetra Tech will work to support the science needed when planning in Minnesota for water storage practice implementation. The goal is to provide practical water storage recommendations that can be incorporated into smaller scale planning within major watersheds (HUC 8), as well as larger scale planning for the Sediment Reduction Strategy for the Minnesota River and South Metro Mississippi River.
The Metropolitan Council, in conjunction with CDM Smith and HKGi consultants, reorganized and expanded the water conservation tools on the water supply planning pages of the Metropolitan Council’s website. The revised toolbox was organized into an online, web-based guide format. These tools are supplemented with fact sheets and case studies that serve to educate and provide useful information to support water conservation programs and activities.
In 2009, residents from the Stradford Addition and the Avon Area Lakes Association (AALA) contacted the Stearns County SWCD with concerns of direct stormwater entering Middle Spunk Lake. The Stearns County SWCD met with representatives on site to assess the stormwater problems. Many areas of untreated stormwater that directly discharged into Middle Spunk Lake were identified. It was determined that the watershed areas within the Stradford addition should be retrofitted with best management practices capable of conveying and treating stormwater.