To preserve the smokestack on the Faribault Woolen Mill, listed in the National Register of Historic Places, as a significant cultural heritage landmark that is otherwise obsolete to business operations
to construct a trail from the North Alexander Park on the East at Two Rivers Park and on the West at the railroad tracks, including an underpass connection under Second Avenue
This proposal aims to answer this question: How would the water quality of Minnesota's lakes change in the next century under future scenarios of urbanization, agricultural growth, and climate change?
Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.
This project will analyze existing and projected data to develop simple tools to predict the effect of land use and climate change on extreme floods and droughts.
The project will assess chemical and biological defluorination activities in environmental samples and identify the microorganisms, metabolic pathways, and intermediates resulting from degradation of fluorinated pesticides and pharmaceuticals.
This project will build the first comprehensive list of Minnesota moths and butterflies. Information gained through surveys and outreach efforts will inform land managers and inspire public appreciation.
BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.
This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.
Funding is prioritized to structural and non-structural practices within the Upper Mustinka and Fivemile Creek planning regions. In addition, a primary goal will be to complete a feasibility study for the Fivemile Creek Restoration as well as completion of the final phase of the Lake Traverse Water Quality Improvement Project. The BdSWD will focus on 4 CIPs within the Bois de Sioux River planning regions; WCD Sub-1, WCD 35 and WCD 20 & 25 drainage retrofit projects.
This is the third round of watershed based implementation funds to be shared by up to 13 LGU's between the Bois de Sioux River and Mustinka River watersheds. These funds are to implement grant eligible components of the 2021 - 2030 Joint Comprehensive Watershed Management Plan. Activities for this grant application are diverse, reflecting activities planned to improve water quality to and within legal drainage systems, streams, and lakes in the Bois de Sioux and Mustinka River watersheds.