This project is for technical assistance during the Lake Winona Nutrient Total Maximum Daily Load (TMDL) public notice and revisions to the document prior to sending to the Environmental Protection Agency (EPA) for final approval.
Develop second swimming quarry to relieve pressure on existing swimming quarry. Construct T-dock access platform, a cantilevered access platform, informational and safety signage, restroom, picnic shelter and landscaping.
Acquire approximately 39.5 acres adjacent to the existing 643-acre Quarry Park and Nature Preserve and the DNR's 300-acre Quarry Park SNA. This key acquisition will open up a southern entrance serving the rapidly expanding St. Cloud metro area.
Lake Minnewaska, a highly used recreational lake, is the largest body of water in Pope County. While scientific studies show that the transparency in Lake Minnewaska has been increasing over the last 30 years, there are numerous ravines on the south shore of Lake Minnewaska that could threaten this trend. The erosion in these ravines is causing large amounts of sediment and phosphorus to be dumped directly into Lake Minnewaska. After a storm in 2011, many trees vegetating the ravines were blown down, ripping out the roots and further exposing the soil along these ravines.
The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.
The Redeye River watershed is conducting the second intensive watershed assessment. The water quality in the watershed is still pretty healthy, but the streams with poor water quality identified previously are still not meeting water quality standards. The goal during this cycle is to better identify problem areas so that parcel specific implementation can occur to achieve improved water quality. The best method available to better target implementation is through culvert inventories, visual and desktop surveys, as well as outreach.
Watershed based implementation funds will be used to target conservation practices utilizing the principles associated with Prioritize, Target and Measure as referenced in our Local Comprehensive Watershed Management Plan. The following are projects/practices, and their associated pollution reduction estimates, that are included in this budget request: (500 acres of Nonstructural BMPs) to protect/improve land management and reduce bacteria will reduce phosphorus by 65 lbs/yr, nitrogen by 520 lbs/yr, and sediment by 285 tons/yr.
Many lakes in Minnesota are classified as “impaired” for aquatic recreation and aquatic life as the result of nonpoint source pollution. These impairments can be addressed by the citizens that live by and have a vested interest in these water bodies, but there is often a lack of knowledge and resources to take effective action. The Freshwater Society is using this appropriation to train citizen groups in lake ecology and management in order to guide them in implementing water quality improvement projects for their local water bodies.
With a population of 162,000 that expands by approximately 300,000 annually through tourism, the Brainerd Lakes area is truly a beloved “up north” destination in Minnesota. Brainerd’s emerging Region 5 Children’s Museum (working title) envisions a more connected Minnesota and will actively bring together people from diverse backgrounds in shared experiences through the exploration of northern Minnesota’s rich art, culture, and heritage.
Inert museum storage was created for the ethnographically and historically significant Helbing Collection of American Indian Arts and Crafts as recommended in a museum assessment.
The RIM-WRP program will expand past efforts and provide important benefits to the citizens of Minnesota by restoring and permanently protecting priority wetlands and associated upland native grassland wildlife habitat via perpetual conservation easements. This funding will leverage $12.6 million of federal WRP funds for the State of Minnesota and is expected to create and sustain 343 jobs and income to local landowners, businesses and others in the state based on USDA economic estimates.
The Reinvest in Minnesota (RIM) Reserve Wetlands Reserve Program (WRP) Partnership will accelerate the restoration and protection of approximately 4,620 acres of previously drained wetlands and associated upland native grassland wildlife habitat complexes via perpetual conservation easements. The goal of the RIM-WRP Partnership is to achieve the greatest wetland functions and values, while optimizing wildlife habitat on every acre enrolled in the partnership.
To hire qualified professionals to rebuild the chancel wall in the Episcopal Church of the Good Samaritan, listed in the National Register of Historic Places.
In the North Fork Crow River Watershed, land use is mainly row crop agriculture with an extensive drainage system. Many of the existing tile lines have open intakes that transport sediment and nutrients to open ditches that drain to the North Fork Crow River. The river flows into Rice Lake which has elevated phosphorus levels. Studies show a major source of phosphorus loading comes from animal manure. Field applied manure has potential to runoff to open tile intakes being a direct path to surface water.
Little Rock Creek is the only trout stream in the Benton and Morrison County area. The creek has supported a wild brown trout population since they were introduced into Little Rock Lake in 1908. A population assessment done in 1992, however, failed to document the presence of brown trout suggesting that population may have become critically low during the drought years of the late 1980's and early 1990's. The stream has since been listed as impaired due to the low abundance of trout and other cold water fish.
The SRRWD has successfully acquired fee title to 257 acres of land that encompasses the headwaters of the Shell Rock River located at the Albert Lea Lake outlet. This 257 acre parcel will now be a Minnesota Department of Natural Resources Aquatic Management Area (AMA) guided by an Aquatic Management Plan.
Rice Lake, in Stearns County, is an impaired water for nutrients that has a Total Maximum Daily Load (TMDL) Implementation plan developed. Rice Lake is one of the larger lakes in the county, offering major water recreation opportunities, economic benefits as well as fish and wildlife habitat. It is a priority for Stearns County to implement projects that have positive impacts on this resource.
Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase V protected and restored 2,041 acres of previously drained wetlands and adjacent native grasslands on 23 conservation easements. All easements have been recorded. $35,000 of funds from other sources were also used.
This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Riparian Buffer Easement Program targets creating buffers on riparian lands adjacent to public waters, except wetlands. Through the Reinvest in Minnesota Program (RIM) and in partnership with Soil and Water Conservation Districts and private landowners, permanent conservation easements are purchased and buffers established.
Develop outdoor recreation facilities including a nature study/observation area, roads and trails, information boards and signs. Park includes shoreline adjacent to the Mississippi Wild & Scenic River. The new trails will provide safety and accessibility along the bluff line overlooking the river and prevent erosion caused by existing, informal earthen trails.
To hire a consultant to complete a publicly available, digital-audio tour of the city's historically significant Mississippi River built environment based on recommendations in a Community Education and Marketing Plan.