Minnesota Erosion Control Association (MECA) will offer three one-day training session intended to educate permittees on the requirements of the Municipal Separate Storm Sewer System (MS4) permit. The focus of these workshops will be on conducting inspections and various hot topics.
New State Trail development to complete key missing trail segments or to fulfill funding gaps in trail development projects. Potetial development to include multi-use trail, trail parking areas, trail waysides, or trail bridges. New trail development includes all associated engineering, design and construction, and is to incorporate current Best Management Practices.
The District is seeking to further its goals of meeting multipurpose drainage management requirements under its obligations as a 103E drainage authority. Judicial Ditch 1 is the largest system in the District, and proportionally one of the largest contributors of sediment and nutrients to the downstream reaches of the North Fork Crow River.
DNR regional clean water specialists and area hydrologists work with local partners to provide technical assistance on implementation projects and related outreach, resulting in cleaner water through healthier watersheds, shorelands and floodplains. We help partners identify, develop, target, design and/or implement on-the-ground projects that improve water quality, enhance habitat and protect infrastructure. We help design restorations that provide lasting benefits by mimicking features of healthy ecosystems.
This contract will be to initiate the second cycle of the North Fork Crow River Watershed Restoration and Protection Strategies (WRAPS) development. The project will provide needed information and analysis to make sure that implementation strategies are well thought out and targeted. The result will be a framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.
The acquisition work for this phase has been completed. The goal for this phase was the protection of 730 acres, 390 in fee title and 340 in conservation easements. Over the life of the grant we protected 910 acres (124% of the goal), 482 acres in fee title and 428 acres in conservation easements. The goal for native prairie acres for this phase was 410 acres. We protected a total of 456 native prairie acres (111% of the goal): 220 native prairie acres in fee title and 256 native prairie acres in easements.
The goal of this project is to refine the nutrient and algae simulation in the Minnesota River basin using all relevant available sources of information. The outcome of this work order is a revised Hydrological Simulation Program – FORTRAN (HSPF) watershed model application for the Minnesota River basin that correctly represents nutrient sources and algae.