We will assess the environmental quality of prairies across Minnesota. On-the-ground surveys and contaminant risk assessments will help inform partner management actions, endangered species recovery plans, and pollinator reintroduction efforts.
The Berger Fountain, known as the dandelion fountain to most, was installed in 1975 by Benjamin Berger and has been a beloved neighborhood landmark in Loring Park and a favorite location for wedding photographers and children ever since. Ben Berger was a park board commissioner and, after seeing a dandelion fountain in Australia, fundraised to build a sister fountain right here in Minnesota.
This project will complete a Total Maximum Daily Load Implementation Plan for the watersheds of Big Sandy and Minnewawa Lakes. This restoration plan will provide pollution reduction and watershed management strategies that are developed with input from stakeholders in the watersheds.
This study will leverage our current bioacoustics monitoring framework to assess avian diversity at the statewide scale through a citizen science acoustic monitoring program, with a focus on private lands.
This project consists of the design of a new marina/dock complex on Birch Lake in Babbitt Minnesota. The City will own and operate the marina/dock complex.
Through the construction of new interactive exhibits and the creation of educational programming, the Duluth Children's Museum will highlight the community and culture of Duluth and the surrounding region. A climbable, playable model of Duluth's iconic canal lighthouses and an educational Ojibwe waaginogaan are among the planned new elements being added to the museum experience.
The Red Lake River is impaired for turbidity. It is also the drinking water source for residents living in East Grand Forks. Burnham Creek is a tributary to the Red Lake River and its watershed is well known for its intensive agriculture, flat topography and frequent flooding. Over the last 20 years, head cutting of the bottom of the channel has led to bank failures, flow restrictions, sedimentation and constriction of fish passage. Soil loss from this is approximately 117 tons per year.
Phase II of the Burnham Creek Watershed Restoration Project will conduct inventory on 2,050 acres, 85.4 miles of ditch channel within the Burnham Creek Watershed of West Polk County. This inventory includes surveying, assembling all available GIS data, ArcMap, LiDAR, review aerial photography, location of tile intakes, determine size of the erosion sites, and prioritization of severity. The district will partner with the Area DNR Hydrologist and the Polk County Highway Department-Drainage & Ag Inspector to verify data and identify any additional ditch segments.
While aspen is one of the most dominant forest types, predicted future conditions will negatively impact aspen growth. Increasing tree diversity can provide increase ecological and economic resilience.