This project will develop and organize a first- stage civic infrastructure pilot in Kanabec County, within the membership of the PICKM (Pine, Isanti, Chisago, Kanabec, and Mille-Lacs) Alliance, and with other organizations in the St. Croix Basin. The work will be grounded in the need for sustainable citizen engagement in water quality management. Civic leaders participating in this project will build their own skills for organizing people and working in partnership with Kanabec County SWCD staff and the St. Croix Basin Team to achieve water quality goals.
This project will construct, calibrate, and validate an HSPF watershed model for the Zumbro River watershed. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs). The consultant will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.
The goal of this project is to develop a phosphorus TMDL for the six impaired lakes in the southwest portion of the Rice Creek Watershed District; Island Lake, Little Lake Johanna, Long Lake, East Moore Lake, Pike Lake and Lake Valentine.
The primary focus of this project is the collection of lake core samples to aid in the completion of lake TMDLs for Dean, Malardi & Fountain lakes. This work will enable completing tasks included in the North Fork Crow River Watershed Restoration & Protection Project (WRPP). Additional data collection is needed to update lake response models. This new data will provide a cohesive and comprehensive data collection for Dean, Malardi and Fountain lakes.
This project will provide the MPCA, CCWD, and all other stakeholders the information and tools necessary to improve the water quality within Coon Creek Watershed District. The improvements will take place using targeted activities throughout the watershed to reduce the primary biological and chemical stressors. In turn, the reduction of these stressors will help to reduce overall loadings of sediment, turbidity, total phosphorus, and E. coli bacteria.
The MPCA, in partnership with the Vermillion River Watershed Joint Powers Organization, contracted with Wenck Associates, Inc., to develop the Stressor Identification (SID) Report; and develop the necessary models for the Vermillion River Watershed Restoration and Protection Strategies (WRAPS) as part of Phase I. The final Vermillion River Watershed SID report discusses all of the analysis that was done in the watershed to identify the primary stressors causing the fish and macroinvertebrate impairments in the watershed.
This project will complete an implementation plan, as required by the Minnesota Pollution Control Agency, for the Zumbro River turbidity TMDL project. It will also revise the Zumbro River Watershed Management Plan (completed 2007) to ensure it continues to reflect local needs, incorporates new information, and develops more effective linkages with related local, state and federal government programs.
The Snake River Watershed Management Board (SRWMB), working in concert with other local governmental units in within the watershed, will assist the MPCA, the project consultant, and other members of the Snake River Watershed Total Maximum Daily Load (TMDL) technical team in the completion of tasks associated with this TMDL project. SRWMB, with assistance from members of the technical team (Kanabec Soil and Water Conservation District (SWCD), Pine SWCD, Aitkin SWCD, and Mille Lacs SWCD) will provide the services to complete this TMDL project.
TMDL project in the Chisago Lakes Lake Improvement District that will develop a watershed based plan and provide strategies for water quality and aquatic ecosystem management, restoration, and protection within Sunrise River Watershed. This project will also aid in understanding the Phosphorus loading to Lake St. Croix.
The VLAWMO watershed covers approximately 25 square miles in the northeast metropolitan area in northern Ramsey County and a small portion of Anoka County, Minnesota. It encompasses the City of North Oaks and portions of the Cities of White Bear Lake, Gem Lake, Vadnais Heights, Lino Lakes, and White Bear Township. This project will gather and organize existing data, support the continuation of modeling and TMDL allocations along with an additional stakeholder meeting. It will also provide the completion of a draft and final TMDL report.
This project will provide baseline data through water monitoring, recording and analyzing the results of six unassessed rivers/tributaries, three unassessed lakes and five storm water outlets in the city of Mora which drain to the Snake River; promote and implement approved BMP’s.
This project will offer incentives to protect 80 acres of land in filter strips and highly erodible lands adjacent to the rivers; construct 9 sediment and water control basins or terraces; replace 35 open tile intakes and advocate wetland restorations and grassland easement programs; organize a Friendship Tour to bring together Minnesota farmers, county commissioners, farm organizations, local, state and federal agency personnel to experience the watershed, farming practices, discuss future project ideas and strengthen relationships; and upgrade 37 subsurface sewage treatment systems by off
This project will continue the offering of low-interest loans to citizens, some of whom may not be able to acquire funding otherwise, for upgrading 50 septic systems to ensure compliance with state rules. Grant funds will be used to administer the low-interest loan program.
Implementation activities proposed as a part of this project include water quality monitoring, biotic surveys, sediment core sampling, mechanical treatment of curly-leaf pondweed (in accordance with regulations and permitting), an iron-enhanced sand filter, with a high capacity multi-stage outlet weir and 40,000 pounds of iron filings and stakeholder involvement in the design process and educational presentations.
This project will continue and build on the momentum developed through the successful Stormwater Retrofit Partnership (Partnership) from FY2010 and 2012 CWF. This project retrofits stormwater practices on public land to assist partnering Local Government Units (LGUs) in achieving water quality goals identified in local stormwater plans by providing technical assistance and cost share funding.
This project will provide cost share funding to organizations and associations to construct medium-sized water quality conservation projects in Dakota County. This project will continue the successful FY2012 Dakota County Community Partners in Conservation. The Community Initiative program will use the Soil and Water Conservation District's existing Conservation Initiative Funding program to provide technical assistance and monetary incentives for targeted, medium-sized projects such as raingardens, bioinfiltration, and bioswales.
This project will provide cost share funding to community organizations and associations to construct medium-sized water quality conservation practices in Dakota County.
This project will complete a TMDL equation and report and an implementation plan for Deer Creek. The TMDL report will describe turbidity impacts to aquatic life uses of Deer Creek, correlate turbidity to other pollutants (sediment, suspended solids, etc.), describe and quantify unique turbidity/sediment stressors which include groundwater influences, legacy impacts of the watershed and stream channel, significant in-stream and near stream sources (slumps, bank erosion, etc.) and upland contributions.
This project will result in the development of a Total Maximum Daily Load (TMDL) for turbidity for Deer Creek and the Nemadji River, and will also define which reaches of the Nemadji basin may be meeting standards for turbidity. It will also allow the Carlton County Soil & Water Conservation District (SWCD) to become a full and active partner in this TMDL study and implementation project as well as future restoration and protection projects.
Deer Creek has been identified as an impaired water body. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the creek to an acceptable level. The project also includes collection of any additional data needed for stream channel modeling scenarios.
The East Branch Blue Earth River is currently negatively impacted and has been shown to contribute disproportionately high sediment loads to the Minnesota River. With limited funds available for implementing conservation practices, targeting tools to pinpoint locations where conservation practices have the highest effectiveness are increasingly important. Innovative use of technology can help streamline these targeting procedures.
Nitrogen is a serious problem in Minnesota's Mississippi River Basin and the Dodge Soil and Water Conservation District (SWCD) will address this problem through saturated buffers. Nitrates have been linked to adverse health effects, and nitrogen is the leading cause of the dead zone in the Gulf of Mexico. Agriculture drainage through the use of tile drainage systems have been identified as the number one leading source of nitrogen in the Mississippi River Basin.
At the public drainage system scale, Faribault County will develop comprehensive Multipurpose Drainage Management Plans that focus on traditional and innovative conservation practices to reduce on-field and in-channel peak flow and erosion with enhanced water quality and wildlife habitat benefits. Planning will occur in conjunction with an established Redetermination of Benefits (ROB) schedule or as initiated through the petition process.
The karst topography of southeast Minnesota increases the possibility of drinking water supplies becoming contaminated with high concentrations of nitrates. To address this risk in the region, there needs to be an increase in the use of nitrogen best management practices and agronomic rates of nitrogen need to be fine-tuned to balance production with environmental degradation. In addition, potential point sources of nutrient contamination in groundwater need to be addressed wherever possible. This project will have three components that will address these needs.
This project will provide cost-share funds to landowners in vulnerable groundwater areas for the incorporation of cover crops in their crop rotation and to provide education related to nitrogen BMPs through field trials and Nutrient Management Plans. An anticipated 100 producers in highly vulnerable areas, will plant 3,000 acres of cover crops resulting in preventing potentially 19,800 pounds of nitrate from leaching into groundwater.
The goal of this project is to develop a watershed-wide, multi-parameter Total Maximum Daily Load (TMDL) and Implementation Plan that will collectively address all water quality impairments throughout the Elm Creek watershed.
Fish Lake is 238 acres and does not meet state water quality standards due to excessive nutrients. Through the Total Maximum Daily Load study, a recommendation was made to treat the lake with alum to achieve the state's water quality standards. The goal of this project is to reduce the phosphorus load to Fish Lake by 310 pounds per year and meet the needed phosphorus reduction goal. The project will be completed as a partnership between the Elm Creek Water Management Commission, Three Rivers Park District, the City of Maple Grove, and The Fish Lake Area Resident's Association.
The Ramsey-Washington Metro Watershed District (RWMWD) is responsible for the protection and restoration of the water quality of 20 lakes and 5 creeks within its boundary. Permit and voluntary cost share programs serve to slowly redevelop the watershed to the benefit of these water bodies. However, additional projects are needed- not only to implement green infrastructure in areas that need extra restoration and protection, but also to foster new relationships between citizens and the RWMWD to rally together in a common goal to the benefit of their water resources.
The purpose of this project is to increase awareness of environmental stewardship practices by providing up to five subgrants to local partners to engage the public, provide education on conservation practices, and create projects, including rain gardens, vegetative buffers, and wetland restorations. Each subgrant will reduce the movement of sediment, nutrients, and pollutants to multiple water resources, retain water on the land, and increase environmental knowledge to individuals within Rice County.
This project will support Minnesota's condition monitoring strategy through the collection of water quality data on streams and rivers in the Nemadji River watershed. The Nemadji River watershed is located in southeastern Carlton County and northeastern Pine County. Water quality samples will be collected primarily during weather-related events that affect stream flow such as snowmelt and rainfalls.
The Fairview Avenue storm sewer system is under capacity and stormwater runoff reaches the pipe faster than the pipes can convey the water downstream. This causes the system to surcharge, causing arterial street flooding, local street flooding, inundation of open spaces, as well as private property damage. This storm sewer system is directly connected to several significant regional water bodies.
Long Lake is impaired for nutrients and is a high priority in the City's Surface Water Management Plan and the Vermillion River Watershed Management Plan. As part of a pond feasibility study funded by 2021 WBIF dollars, the City identified pond EVR-P11 as a high quality project to help reduce nutrients in the watershed. The city is requesting $115,331 for a project that will include the excavation of existing pond, reconstruction of the pond outlet, and the installation of infiltration bench. The project will provide approximately 2.21 lbs of Total Phosphorous removal.
Faribault County Soil and Water Conservation District will develop a mini-grant program to partner with area non-profits, community groups and lake associations to implement stormwater management practices that will intercept, treat, filtrate and/or infiltrate runoff that will reduce phosphorus and sediment loads into high priority and TMDL impaired waters in Faribault County. This program would provide cost-share and technical assistance to enable these organizations to go beyond planning and take action to protect our water resources.
The Faribault County Soil and Water Conservation District Drainage Engineer will inventory public drainage ditches to identify priority systems and areas where erosion, sediment, and nutrients contribute to water quality degradation. Sites identified for potential side inlet control, buffer strip need, or water storage will be prioritized for landowner contact and follow through by seeking external funding opportunities.
Working with a consultant, a current online database to manage public drainage systems will be enhanced and a corresponding mobile inspection app will be developed to facilitate drainage compliance and improve inspection planning. With these improvements, a long-term, comprehensive, GIS-compatible database will be in place to help plan, collect, document, summarize, and analyze system condition, repair needs, and violations with the overall goal of protecting and improving water quality.
Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.
Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.
After 6 years of intensive baseline monitoring at 5 edge-of-field sites, 1 intermittent and 3 in-stream sites in 3 sub-watersheds representing the geomorphic regions of the Root River, the second phase of the project is well prepared for the implementation of BMPs. Continued monitoring will be used to measure the effectiveness of the BMPs for the next 6 years. In preparation for BMP implementation, extensive planning was completed using LiDAR terrain analysis and the Tomer Framework to prioritize practices.