The Children's Discovery Museum in Grand Rapids, Minnesota will increase access and deepen engagement with their effectively proven School Service Program. The museum will take down the economic barriers and increase enrollment. This grant will fund more educators and facilitators, curriculum development, scholarship aid, transportation assistance and art/teaching supplies.
This project will finalize the Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.
Three streambank stabilization projects have been identified as high priority projects in the Thief River Falls Water Quality Study completed in 2017. The proposal will use a combination of bendway weirs, toe protection by building a floodplain bench and live stake plantings. It has been estimated that a total of 385 tons per year of sediment from these three locations is entering the river contributing to the impairment downstream.
The goal of this project is to calculate an additional bacteria total maximum daily load and incorporating that information in the Total Maximum Daily Load Report (TMDL) and the Watershed Restoration and Protection Strategy (WRAPS) report. Other services that will be provided during this project are technical assistance, assistance with responses to comments received during the public notice process, incorporating public comments into the documents and preparing the documents for final federal and state approval.
The goal of the project is to identify priority locations for project implementation using the Prioritize, Targeting, and Measuring Application (PTMApp) in the Thief River Watershed. The PTMApp will be used to identify and evaluate the suitability and effectiveness of best management practices including treatment scenarios, and provide estimates of sediment, nitrogen, and phosphorus delivered to the Thief River Watershed, which is impaired for sediment.
To do preservation work at the Thorstein Veblen Farmstead National Historic Landmark, located near Nerstrand, in Rice County, Minnesota, that will provide urgently needed stabilization and preservation of three out-buildings at the farmstead, including the original small barn, the large hay barn, and the granary.
The project will monitor nine key tributaries to the Long Prairie River for water chemistry and bacteria. The streams to be monitored include Eagle Creek, Turtle Creek, Moran Creek, Fish Trap Creek, an un-named creek which outlets to Lake Charlotte in the town of Long Prairie and three stream reaches of the Long Prairie River itself. All sites are located within Todd County with the exception of one which lies just over the border in Douglas County.
This project will inventory and conduct compliance inspections on Subsurface Treatment Systems (SSTS) around eight lakes in Todd County. Lakes to be inventoried include Big Sauk Lake, Big Swan Lake, Little Osakis Lake, Fairy Lake, Lily Lake, Long Lake, Little Birch Lake and Moose Lake. Approximately 1,200 parcels will receive compliance inspections. Systems that fail to meet standards will be brought into compliance using procedures available in rule and ordinance.
This project represents the third septic inventory effort by Todd County. The four lakes included - Guernsey, Juergans, Little Sauk, and Long Lakes - are all designated by the Sauk River Water District's Sauk Lake Management Unit as high priority for water quality improvement. Three of these lakes are listed as water quality-impaired for nutrients and the fourth - Long Lake - has had periodic e.Coli problems documented in several tributaries. This project will allow Todd County to expand on previous evaluations of 13 other lakes.
Todd County Septic Inspectors will research septic systems on 313 parcels that are located in the "highly vulnerable" portion of the City of Long Prairie's Drinking Water Supply Management Area. Each parcel's tanks and soil drain fields will be inspected for septic system compliance. Todd County will follow up with landowners found to have noncompliant systems in an effort to protect Long Prairie''s drinking water supply.
The SRWD, with assistance from local volunteers, will conduct water quality assessments on William Lake, Long Lake, Cedar Lake, Bass Lake. Felix Lake, Little Osakis Lake and Trout Creek to attain the necessary data to determine impairment status.
The proposed work will be the fifth septic inventory effort conducted by Todd County and will include eight lakes, 431 parcels, and 277 established addresses. Three of the lakes - Cedar, Long Higgens, and Pauley are located in the Sauk River Watershed District's Sauk Lake Management Unit which is a high priority for improvement. These are the last three lakes of any size to be completed in the Sauk River Watershed portion of Todd County. Nitrogen and phosphorus levels are an issue through the watershed and this management unit in particular.
This project will build off the success of the additional geographic information system (GIS) and water planning expertise the TSA8 added in 2016 to provide consistent mapping, water planning assistance and training to partners. This project will help soil and water conservation districts prepare for the 1W1P process before the planning starts. A unified protection methodology is essential for the 1W1P process to be successful. This project will include: unified GIS mapping and protection model for all nine counties respectively.
Turnaround Arts: Minnesota supports low performing schools in using the arts as a tool for improvement. Participating schools have demonstrated increased academic achievement, increased student and family engagement, and improved school culture and climate. At the national level Turnaround Arts is a signature program of the President’s Committee on the Arts and the Humanities. Turnaround Arts: Minnesota is run by Perpich Center for Arts Education and works with schools pre-K through 8th grade.