Thief River Grade Stabilization and Cover Crop Implementation

Project Details by Fiscal Year
2020 Fiscal Year Funding Amount
$256,666
Fund Source
Clean Water Fund
Recipient
Pennington SWCD
Recipient Type
Local/Regional Government
Status
Completed
Start Date
April 2020
End Date
September 2024
Activity Type
Grants/Contracts
Counties Affected
Pennington
Pennington
Project Details

The primary goal of the project is to reduce sediment entering the Lower Thief River by targeting grade stabilization and cover crop practices. The Thief River is impaired downstream of Agassiz National Wildlife Refuge for Total Suspended Solids which directly impacts the drinking water supply for the City of Thief River Falls. The installation of 62 grade stabilization structures and 5,000 acres of cover crop in priority locations identified by a completed ditch inventory and the PTMApp will reduce an estimated 1,866 tons of sediment and 1,016 pounds of phosphorus.

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
The Laws of Minnesota 2019, 1st Special Session, Chapter 2, Article 2, Section 7 (b)
Appropriation Language

(b) $16,000,000 the first year and $16,000,000 the second year are for grants to local government units to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of this money may be used to seek administrative efficiencies through shared resources by multiple local governmental units. Up to 20 percent of this appropriation is available for land-treatment projects and practices that benefit drinking water.

2020 Fiscal Year Funding Amount
$256,666
Other Funds Leveraged
$37,403
Direct expenses
$129,579
Administration costs
$6,793
Number of full time equivalents funded
0.468390805
Proposed Measurable Outcome(s)

The project will target high priority areas to install 62 side water inlets and 5,000 acres of cover crops. An estimated 1,866 tons of sediment and 1,016 pounds of phosphorus will be reduced through project implementation.

Measurable Outcome(s)

The project installed 45 side water inlets in high priority areas which reduced sediment loading to the Thief River by 166 tons/year and phosphorus by 166 pounds/year.

Proposed Outcomes Achieved
achieved some of the proposed measurable outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
ADawn Nelson, Greg Hilgeman, Kevin Wilde, Linda Hanson, Ricky Peterson
Project Manager
First Name
Peter
Last Name
Nelson
Organization Name
Pennington SWCD
Street Address
201 Sherwood Ave S Thief River Falls, MN 56701
City
Thief River Falls
State
MN
Zip Code
56701
Phone
218-683-7075
Email
peter.nelson@pennington.mnswcd.org
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767